Edgerton is a city in Pipestone County, Minnesota. 7 rules below are quoted from official sources and independently re-checked, most recently on November 4, 2026. Rules for unincorporated land are on the Pipestone County page.

Answers from the rulebook for Edgerton

Edgerton’s own rules

  • Building permitRequired

    Construction, repair, and alteration on property inside Edgerton city limits.

    • The city states that the permit must be approved before work begins.
    • Listed covered work includes driveways, sidewalks, patio slabs, fences, decks, steps, porches, and storage sheds.
    “A building permit is required for all construction”
  • Driveway accessRequired

    Driveways constructed, repaired, or altered on property inside Edgerton city limits.

    • The city includes driveways among work requiring a building permit.
    • The permit must be approved before work begins.
    “A building permit is required for all construction, repair and alteration on your property, including driveways, sidewalks, patio slabs, fences, decks, steps, porches and storage sheds.”
  • Permit feesPublished (with conditions)

    City building permits inside Edgerton city limits.

    • The listed fee is for the current building permit fee.
    • Variance-hearing fees differ by regular versus special council meeting.

    building permit fee: 50 USD (plus 0.2% of total project cost) · project cost surcharge: 0.2 percent (of total project cost) · regular-meeting variance hearing: 250 USD · special-meeting variance hearing: 500 USD

    “The current Building Permit fee is $50 plus .2%”
  • Permit processPublished (with conditions)

    City building-permit applications inside Edgerton city limits.

    • Applicants must complete the city building-permit application and return it to City Hall.
    • Depending on the project, council review and approval may be necessary.
    • For consideration at a regular council meeting, submission is due no later than one week before the meeting.

    regular council meeting: second Wednesday of every month · submission deadline: <= 1 week before regular meeting (when seeking consideration at a regular council meeting)

    “To apply for a building permit, complete a Building Permit application and return the form to City Hall. Depending on what you wish to do, you may or may not need to wait for a monthly Council meeting to have your application reviewed and approved.”

Rules another office applies inside Edgerton

Edgerton does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted (with conditions)

    Buildings inside Edgerton city limits that are governed by the Minnesota State Building Code.

    • The code applies to construction, reconstruction, alteration, repair, and use of buildings and structures of the type governed by the code.
    • Agricultural buildings are excepted as stated in Minnesota Statutes § 326B.121, subdivision 1(c).
    “The State Building Code is the standard that applies statewide”
  • Well permitLimited

    Monitoring wells and bored geothermal heat exchangers inside Edgerton city limits.

    • Construction permits are required for the identified well or boring types.
    • Applications must be submitted to the Minnesota Department of Health for review and written approval before work starts.
    “construction permits are required. Permit applications must be submitted to MDH for review and written approval prior to start of work.”
  • Agricultural exemptionConditional

    Agricultural buildings inside Edgerton city limits for Minnesota State Building Code applicability.

    • The State Building Code does not apply to agricultural buildings except for the stated inspection or rulemaking authorities and skylight-panel requirement.
    “The State Building Code does not apply to agricultural buildings except:”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Edgerton or Pipestone County directly.

  • Owner-builder exemption — Owner-built construction inside Edgerton city limits.
  • Inspections — Building work inside Edgerton city limits.
  • Certificate of occupancy — Occupancy of buildings inside Edgerton city limits.
  • Local zoning — Land inside Edgerton city limits.
  • Zoning districts — Zoning districts inside Edgerton city limits.
18 more unanswered
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Mandatory utility hookup
  • Subdividing land
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Edgerton publishes no rule on the point, not that none exists. Pipestone County’s page lists the county offices to call.

← All of Pipestone County: county rules, score and offices