Pine County, Minnesota
Sturgeon Lake is a city in Pine County, Minnesota. Sturgeon Lake adopts its own zoning, so inside its limits Sturgeon Lake’s rules apply, not the county’s. 14 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Pine County page.
Placement of manufactured homes in residential districts within Sturgeon Lake city.
“A building permit and any other required permits shall be obtained for manufactured homes.”
Land inside Sturgeon Lake city limits.
“No structure or land shall hereafter be used or occupied [...] except in conformity with the regulations specified in the Zoning Ordinance for the district in which it is located.”
Zoning districts inside Sturgeon Lake city limits.
“R-1 Single Family Residential District (B) R-2 Multi-Family Residential District (C) C-1 Central Business District”
Manufactured homes in residential districts within Sturgeon Lake city limits.
“The city authorizes the placement of manufactured homes in residential districts within the city if such manufactured homes comply with the following conditions:”
Construction of a private wastewater disposal system inside Sturgeon Lake city limits.
“Prior to commencement of construction of a private wastewater disposal system, the owner shall first obtain a written permit signed by the city.”
Permitted private wastewater disposal systems inside Sturgeon Lake city limits.
“The inspection shall be made within 24 hours of the receipt of notice.”
Wastewater disposal for properties inside Sturgeon Lake city limits where public sewer is unavailable.
“Where a public sewer is not available [...] the building sewer shall be connected to a private wastewater disposal system complying with the provisions of this subchapter and Minn. Rules Ch. 7080”
Properties generating wastewater inside Sturgeon Lake city limits that are adjacent to a street, alley, or right-of-way containing a city public sanitary sewer.
public sewer distance: <= 200 feet (Measured from the wastewater-generating structure.) · connection deadline: <= 365 days (From the date the public sewer is operational.)
“within 365 days of the date the public sewer is operational; provided, the public sewer is within 200 feet of the structure generating the wastewater.”
Subdivision of land inside Sturgeon Lake city limits.
plat threshold: < 5 acres (A subdivision creating one or more parcels, tracts, or lots of less than five acres must be platted, except as provided in the chapter.)
“Any subdivision creating parcels, tracts, or lots which results in one or more parcels, tracts or lots of less than five acres shall be platted, except as provided in this chapter.”
Private wastewater-disposal permits inside Sturgeon Lake city limits.
“The application for the permit shall be made on a form furnished by the city”
Sturgeon Lake does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
R-1 Single-Family Residential District inside Sturgeon Lake city limits.
minimum lot area: >= 10000 square feet (100 by 100 feet stated in the ordinance.) · minimum lot width: >= 75 feet
“Lot area. 10,000 square feet (100 x 100). (2) Lot width. 75 feet.”
R-1 Single-Family Residential District inside Sturgeon Lake city limits.
front yard: >= 30 feet · side yard: >= 5 feet (Corner lots: 25 feet on the side adjacent to the street, but no less than the adjacent lot's front-yard setback on that street.) · rear yard: >= 30 feet
“Front yards. Not less than 30 feet; (b) Side yards. 5 feet. [...] (d) Rear yards. 30 feet.”
R-1 Single-Family Residential District inside Sturgeon Lake city limits.
maximum height: <= 35 feet (No structure may exceed two stories or 35 feet, whichever is less.)
“No structure shall exceed 2 stories or 35 feet, whichever is less.”
Lots in the R-1 Single-Family Residential District inside Sturgeon Lake city limits.
“All lots shall front on and have ingress and egress bymeans of a public right-of-way.”
We looked and could not find an official answer yet. Silence is not permission; ask Sturgeon Lake or Pine County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Sturgeon Lake publishes no rule on the point, not that none exists. Pine County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Sturgeon Lake means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.