Zoning, building permits and septic rules in Barry Township, Minnesota

Barry Township is a township in Pine County, Minnesota. Barry Township adopts its own zoning, so inside its limits Barry Township’s rules apply, not the county’s. Septic permits inside Barry Township come from Pine County. 3 rules below are quoted from official sources and independently re-checked, most recently on November 11, 2026. Rules for unincorporated land are on the Pine County page.

Answers from the rulebook for Barry Township

Barry Township’s own rules

  • Building permitRequired

    Homes, buildings and structures built inside Barry township (township building site permit)

    • Movable or portable structures 250 square feet or less do not require a building site permit but must meet setbacks
    • Building site permit is not issued until the county issues the on-site sewage system permit, when required
    • Parcel must be surveyed/subdivided under the Pine County subdivision ordinance or created consistent with rules at the time

    exempt portable structure size: <= 250 square feet (must meet setbacks)

    “a "building site permit" shall be obtained from the township zoning officer for all homes, buildings and structures to be constructed within the township.”
  • Local zoningPresent (with conditions)

    Land inside Barry township, Pine County, Minnesota

    • Zone 1 (agricultural, residential, recreational): 5-acre minimum lot with at least 2.5 contiguous buildable acres
    • Zone 2 (sections 18, 19, 30; commercial, industrial, residential): 2.5-acre minimum lot, all buildable
    • Zone 3 airport
    • Conditional and interim use permits required for listed uses
    • Ordinance text retrieved is the April 2026 revisions PDF on the township site; the township page names a signed 2026 ordinance as current, whose PDF could not be opened

    Zone 1 minimum lot: >= 5 acres (at least 2.5 contiguous buildable acres) · Zone 2 minimum lot: >= 2.5 acres (all must be buildable land) · setback from road centerline: >= 100 feet · setback from property lines: >= 16.5 feet

    “the 2026 barry township ordinance is the township's most current ordinance.”

Rules another office applies inside Barry Township

Barry Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty (with conditions)

    Individual sewage treatment systems inside Barry township; permits approved by Pine County Planning and Zoning Department

    • Township building site permit is withheld until the county sewage permit has been issued, when required
    • Non-conforming lots need two septic locations approved by the county
    “a "building site permit" shall not be issued by the township until an individual on-site sewage system permit, when required, has been issued by the county.”

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.