Lake Wilson is a city in Murray County, Minnesota. 5 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Murray County page.

Answers from the rulebook for Lake Wilson

Lake Wilson’s own rules

  • Permit processPublished (with conditions)

    Building-permit application process for work inside Lake Wilson city limits.

    • The published form is an application to the City Council and asks the applicant to identify the proposed work, construction dimensions, lot, address, cost, and owner signature.
    • The form says compliance with submitted plans and applicable city ordinances is required if a permit is granted.
    • The form does not state which projects require a permit, approval timing, inspections, or fees.
    “APPLICATION FOR BUILDING PERMIT – LAKE WILSON To the City Council of the City of Lake Wilson in the County of Murray, State of Minnesota:”

Rules another office applies inside Lake Wilson

Lake Wilson does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted (with conditions)

    Buildings and structures governed by the State Building Code inside Lake Wilson city limits.

    • The code does not apply to agricultural buildings except for state inspections or rulemaking authorized by Minnesota Statutes §§ 103F.141, 216C.19, subdivision 9, and 326B.36, and except that translucent panels or skylights without raised curbs must have equivalent load-bearing capacity.
    • The official city site does not establish whether Lake Wilson itself administers or enforces the code.
    “The State Building Code is the standard that applies statewide”
  • Septic inspectionRequired

    New construction or replacement of a subsurface sewage treatment system serving property inside Lake Wilson city limits.

    • The manner and timing of inspection are determined by the applicable local ordinance.
    • For an addition of a bedroom on property served by a system, a building permit or variance may not issue unless the system is inspected and supported by a certificate of compliance or notice of noncompliance.
    • The November 1 through April 30 temporary waiver applies only where the local unit has a building-permit ordinance for bedroom additions; inspection must occur by the following June 1 and the applicant must submit the certificate or notice within 15 days.
    “An inspection shall be required for all new construction or replacement of a system”
  • Well permitLimited

    Well and boring construction inside Lake Wilson city limits.

    • The state program uses notifications for water-supply and dewatering wells and permits for some other well or boring types.
    • For emergency construction, the property owner, agent, or contractor must make the required report; the written notification or permit application and fee are due within five working days.
    • This finding does not establish a Lake Wilson-specific well permit.
    “A permit or notification is not required for installation of a pump, pumping equipment, pitless unit, pitless adapter, screen”
  • Agricultural exemptionConditional

    Application of the State Building Code to agricultural buildings inside Lake Wilson city limits.

    • The State Building Code does not apply to agricultural buildings except for state inspections or rulemaking authorized by Minnesota Statutes §§ 103F.141, 216C.19, subdivision 9, and 326B.36, and except that translucent panels or skylights without raised curbs must have equivalent load-bearing capacity.
    • This finding concerns only the State Building Code and does not establish an exemption from locally adopted permits, utility rules, land-use rules, or other requirements.
    “The State Building Code does not apply to agricultural buildings except:”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Lake Wilson or Murray County directly.

  • Building permit — Building work inside Lake Wilson city limits.
  • Owner-builder exemption — Owner-built residences inside Lake Wilson city limits.
  • Inspections — Building work inside Lake Wilson city limits.
  • Certificate of occupancy — Occupancy of buildings inside Lake Wilson city limits.
  • Local zoning — Land inside Lake Wilson city limits.
19 more unanswered
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic permit
  • Off-grid sanitation
  • Mandatory utility hookup
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Lake Wilson publishes no rule on the point, not that none exists. Murray County’s page lists the county offices to call.

← All of Murray County: county rules, score and offices