Mower County, Minnesota

Building permits, zoning and septic rules in Austin, Minnesota

Austin, Minnesota requires building approval before starting a new home; the City Building Department handles the application and inspections.1 Austin administers its own zoning inside city limits in Mower County.2 Austin requires sewer connection under specified conditions; where a private wastewater system is needed, Mower County Environmental Services handles applicable septic permits.345

At a glance

Building permit
New-home application and approval through the city1
Zoning
City zoning districts apply inside Austin2
Sewer and septic
Required sewer connection where applicable; county septic approval for private systems34
Minimum lot size
R-1: 6,000 square feet; A-1: 200,000 square feet67
Tiny homes
State residential code and Austin zoning both apply8
Owner-builder
Conditional state contractor-license exemption; building approvals still apply9

Who to call

Building permits

City of Austin Building Department

Building permit applications and construction questions

507-437-9950

500 4th Avenue NE

Building permits

City of Austin Building Department — New Home Applications

New-home application requirements, plan review and inspections

507-437-9950

Zoning

City of Austin Planning & Zoning

Parcel zoning verification and city land-use questions

507-437-9952

Septic permits

Mower County Environmental Services

Applicable septic-system permitting and county sanitation questions

507-437-7718

[email protected]

1105 8th Ave NE

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Austin means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Austin, MN?

For a new home in Austin, apply through the City Building Department and obtain the Building Official’s approval before starting work.1 Minnesota’s State Building Code applies statewide to buildings of the types governed by the code, including construction, alterations and repairs.10 Austin’s new-home instructions require a site drainage plan for Engineering Department review and ask applicants to allow 15 working days for review of site drawings, plans and code compliance.1 Ask the city building counter to identify the application and inspections for your particular addition, remodel or outbuilding.11

Who handles building permits and zoning in Austin?

The City of Austin Building Department lists 507-437-9950 for building-permit information and questions.11 For official verification of an Austin parcel’s zoning, call City Planning & Zoning at 507-437-9952.12 Austin’s zoning districts are city-administered, so begin with the city when assessing a building site inside city limits.2 Private sewage-system permitting remains a separate question for Mower County Environmental Services.45 For land outside Austin city limits, use the Mower County guide for the county’s construction-or-placement zoning-permit requirement.13

Does Austin have zoning, lot-size rules and setbacks?

Austin has its own zoning districts, and dimensional requirements depend on the district rather than a single citywide lot standard.214 In Austin’s R-1 Single-Family Residence District, the minimum lot area is 6,000 square feet and minimum lot width is 60 feet.6 In Austin’s A-1 Agricultural District, the minimum lot area is 200,000 square feet and minimum width is 200 feet.7 Austin’s R-1 district limits lot coverage to 40% and building height to 30 feet.1516 Before choosing a house footprint, ask City Planning & Zoning to verify the district and explain the parcel’s setback and overlay requirements.1214

How do sewer connections and septic permits work in Austin?

Austin requires buildings used for human occupancy and other covered purposes to connect to public sanitary sewer when the property abuts a street, alley or right-of-way where that sewer is located or may be located; installation is due within 90 days after official notice.3 Where public sewer is unavailable, Austin requires a private wastewater system complying with the City/County Sanitation Code.3 Mower County requires a septic construction permit before covered installation, alteration, repair or extension, subject to the ordinance’s exceptions.4 Contact Mower County Environmental Services for that process.5 The published construction fee is $550 for Type I, II and III residential systems within the stated flow limit; ask the county for the full fee schedule for your design.17

Can you live in an RV or tiny home on land in Austin?

We could not confirm Austin’s rules for living in an RV or camping temporarily on a private residential parcel; ask City Planning & Zoning about the proposed use before relying on it during construction.12 Minnesota requires tiny houses used as dwellings to comply with the applicable residential code, while municipal zoning controls location, dimensions and other land-use details.8 We could not confirm Austin’s tiny-home occupancy or accessory-dwelling approval rules; take the proposed design and intended use to City Planning & Zoning.12 Austin does allow manufactured homes outside licensed manufactured-home parks conditionally, including required approvals, area regulations and foundation footings at least 42 inches below finished grade.18

Building a home in Austin: what are the steps, in order?

1. Ask Austin Planning & Zoning to verify the parcel’s zoning and compare the proposed building with district requirements.1214 2. Establish whether Austin’s sewer-connection requirement applies; if sewer is unavailable, resolve private wastewater-system approval with Mower County Environmental Services.345 3. Prepare the new-home application materials, including the site drainage plan, and allow the city’s stated 15 working days for review.1 4. Obtain Building Official approval before starting construction and arrange the required final inspection before moving in.1 An Austin owner-builder may qualify for Minnesota’s contractor-license exemption when occupying the home or retaining it for rental, but the exemption does not waive building approvals or inspections.9

What should you check before buying land in Austin?

Ask Austin Planning & Zoning to verify the parcel’s zoning before committing to a site or intended use.12 Austin can disapprove subdivision development that violates the City Flood Plain Chapter.19 Minnesota also requires floodplain approval for covered construction or fill in regulated floodplain areas, and mapped floodways generally prohibit dwellings and enclosed structures.2021 A private well generally requires state notification and a filing fee before construction, subject to statutory exceptions; we could not confirm an Austin-specific well provision.22 A direct driveway connection to a Minnesota state highway requires MnDOT approval before construction or modification.23

Watch-outs

  • Austin’s manufactured-home allowance has foundation and approval conditions; we could not confirm permission to occupy an RV on a private lot.1812
  • Austin’s new-home final inspection must occur before the owner moves in.1
  • A sewer-served Austin parcel may be subject to mandatory connection rather than an elective private septic system.3

Sources

  1. City of Austin Building Department — New Home Applications (ci.austin.mn.us)
  2. § 11.020 Districts (Austin), quoted and re-checked
  3. § 3.30 Rules and Regulations Relating to Sewer Use and Service Charge (Austin), quoted and re-checked
  4. Mower County SSTS Ordinance, quoted and re-checked
  5. Mower County Environmental Services (co.mower.mn.us)
  6. § 11.023 District Regulations (Austin), quoted and re-checked
  7. § 11.023 District Regulations (Austin), quoted and re-checked
  8. Tiny Houses and the 2020 Minnesota Residential Code (Minnesota statewide rule), quoted and re-checked
  9. revisor.mn.gov (Minnesota statewide rule), quoted and re-checked
  10. 2025 Minnesota Statutes, section 326B.121 (Minnesota statewide rule), quoted and re-checked
  11. City of Austin Building Department (ci.austin.mn.us)
  12. City of Austin Planning & Zoning (ci.austin.mn.us)
  13. Zoning and Land Use Permits (2026 county census)
  14. § 11.020 Districts (Austin), quoted and re-checked
  15. § 11.023 District Regulations (Austin), quoted and re-checked
  16. § 11.023 District Regulations (Austin), quoted and re-checked
  17. Septic Systems (Austin), quoted and re-checked
  18. § 4.71 Manufactured (Mobile) Homes (Austin), quoted and re-checked
  19. codelibrary.amlegal.com (Austin), quoted and re-checked
  20. Floodplain Regulations (Minnesota statewide rule), quoted and re-checked
  21. Floodplain Regulations (Minnesota statewide rule), quoted and re-checked
  22. 2025 Minnesota Statutes, section 103I.205: Well Construction (Minnesota statewide rule), quoted and re-checked
  23. MnDOT Access Management Manual, Chapter 4 (Minnesota statewide rule), quoted and re-checked

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Austin

Austin’s own rules

  • Local zoningPresent

    Land inside Austin city limits; Austin city administers its own zoning districts and unified development regulations.

    “the city is hereby divided into zoning districts.”
  • Zoning districtsPublished

    Austin city zoning districts and dimensional regulations.

    • The code lists R-1, R-2, R-O, R-M, B-2, B-3, I-1, I-2, I-3, A-1, S-Z, and overlay/planned-development districts; district-specific standards and overlays may add requirements.
    “the city is hereby divided into zoning districts.”
  • Minimum lot sizeSpecified

    A-1 Agricultural District inside Austin city limits.

    • The dimensional table is in § 11.023 and was enacted by Ord. 699, passed 1-18-22.

    minimum lot area: >= 200000 square feet · minimum lot width: >= 200 feet

    “A-1 | 200,000 | 200 |   | 40 | 12/32 | 35 | 40%”
    One more reviewed finding on this topic
    • Specified — R-1 Single-Family Residence District inside Austin city limits.
      “R-1 | 6,000 | 60 | 25 | 5/10 | 20 | 30 | 40%”
  • Lot coverageSpecified

    A-1 Agricultural District inside Austin city limits.

    maximum lot coverage: 40 percent

    “A-1 | 200,000 | 200 |   | 40 | 12/32 | 35 | 40%”
    One more reviewed finding on this topic
    • Specified — R-1 Single-Family Residence District inside Austin city limits.
      “R-1 | 6,000 | 60 | 25 | 5/10 | 20 | 30 | 40%”
  • Building heightSpecified

    A-1 Agricultural District inside Austin city limits.

    maximum building height: 35 feet

    “A-1 | 200,000 | 200 |   | 40 | 12/32 | 35 | 40%”
    One more reviewed finding on this topic
    • Specified — R-1 Single-Family Residence District inside Austin city limits.
      “R-1 | 6,000 | 60 | 25 | 5/10 | 20 | 30 | 40%”
  • Manufactured homesAllowed (with conditions)

    Manufactured/mobile homes placed outside licensed manufactured-home parks inside Austin city limits.

    • All required permits must be obtained.
    • The home must comply with area regulations.
    • The foundation must use masonry, concrete, or treated wood with footings at least 42 inches below finished grade.
    • The home must conform to Minnesota Statutes and have manufacturer foundation-placement instructions available for inspection.

    minimum footing depth below finished grade: >= 42 inches

    “The city authorizes the placement of manufactured (mobile) homes outside licensed manufactured (mobile) home parks if the homes comply with the following conditions.”
  • Mandatory utility hookupConditional

    Buildings or properties used for human occupancy, employment, recreation, or other purposes inside Austin city limits.

    • Connection is required when the property abuts a street, alley, or right-of-way in which a public sanitary sewer is located or may be located.
    • The connection must be installed within 90 days after official notice.
    • If public sanitary sewer is unavailable, a private wastewater disposal system complying with the City/County Sanitation Code is required.

    connection deadline after official notice: 90 days

    “situated within the city [...] within 90 days after date of official notice”
  • Subdividing landRegulated (with conditions)

    Subdivisions inside Austin city limits.

    • No final plat may be approved unless the subdivider complies with the chapter's general principles and requirements.
    • Plans and specifications for required improvements must be approved by the appropriate public official.
    • Residential lots must meet zoning size, setback, and side-yard requirements.
    • Subdivision approval may be disapproved for violation of the Flood Plain Chapter.
    “No final plat of any subdivision shall be approved”
  • Driveway accessRequired

    Each street connection serving a subdivision inside Austin city limits.

    • The requirement applies to the subdivider and concerns driveway approaches for each connection to the street.
    “The subdivider shall install driveway approaches for each connection to the street.”
  • Building in a floodplainLimited

    Subdivision development inside Austin city limits that would violate the City Flood Plain Chapter.

    • The city reserves the right to disapprove a subdivision that would violate the Flood Plain Chapter.
    • This source does not establish the full floodplain-development permit or construction requirements.
    “in violation of the Flood Plain Chapter of the City Code.”
  • Permit feesPublished (with conditions)

    Sewage-treatment-system permitting for property inside Austin city limits where the Mower County SSTS process applies.

    • The page directs readers to the full fee schedule for the complete listing of SSTS permitting fees.
    • The displayed fee applies to Type I, II, and III residential systems up to 2500 gpd.

    permit to construct sewage treatment system: 550 USD (Type I, II, III residential, up to 2500 gpd)

    “Permit to Construct Sewage Treatment System $550.00*”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Austin or Mower County directly.

  • Building permit — General building permits for construction inside Austin city limits.
  • Owner-builder exemption — Owner-builders constructing inside Austin city limits.
  • Building code adopted — Building-code adoption inside Austin city limits.
  • Inspections — General building inspections inside Austin city limits.
  • Certificate of occupancy — Certificates of occupancy for buildings inside Austin city limits.
8 more unanswered
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Austin publishes no rule on the point, not that none exists. Mower County’s page lists the county offices to call.

← All of Mower County: county rules, score and offices