Morrison County, Minnesota
Motley is a city in Morrison County, Minnesota. Motley adopts its own zoning, so inside its limits Motley’s rules apply, not the county’s. Septic permits inside Motley come from Motley. 11 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Morrison County page.
New structures and structure assembly, installation, repair, remodeling, removal, or construction inside Motley city limits.
“No person shall assemble, install, repair, remodel, remove or construct any structure prior to applying for and receiving a Zoning Permit.”
Land inside Motley city limits.
“This Ordinance shall be referred to and cited as the Motley Land Use, Zoning and Subdivision Ordinance, except herein where it shall be cited as the "Ordinance".”
Recreational vehicles inside Motley city limits.
“No recreational vehicle shall be used as a year-round living dwelling or living quarters for a period of time in violation of this ordinance.”
Manufactured-housing developments inside Motley city limits.
“Manufactured housing development shall be administered as a Conditional Use in the zoning district where said use is allowed.”
Construction or repair of sewage systems inside Motley city limits.
“Zoning Permits shall be issued for all new structures and any change in structure exterior, plumbing or number of bedrooms, any construction or repair of a sewage system and any grading and filling in shoreland not exempted by this ordinance.”
Construction or repair of a sewage system inside Motley city limits.
“Zoning Permits shall be issued for all new structures and any change in structure exterior, plumbing or number of bedrooms, any construction or repair of a sewage system and any grading and filling in shoreland not exempted by this ordinance.”
Onsite or cluster onsite sewage systems proposed in subdivisions inside Motley city limits.
treatment sites for drain fields: 2 sites (Onsite systems or cluster onsite systems in subdivisions)
“Onsite systems or cluster onsite systems shall conform to Minnesota Pollution Control Agency Standards, Individual Sewage Treatment Systems Standard, Chapter 7080, and provide for two (2) treatment sites for drain fields.”
Subdivision proposals inside Motley city limits.
“SECTION VI - SUBDIVISION STANDARDS 6.1 Sketch Plan. A sketch plan shall contain the following data: 1. Existing Conditions”
Planning and zoning permits and land-use applications inside Motley city limits.
recreational vehicle fee: 35 USD · variance fee: 300 USD · conditional use fee: 300 USD · interim use fee: 300 USD
“Sign $45.00 Fence $45.00 Keeping of Hen Chickens $35.00 Recreational Vehicle $35.00 Variance* $300.00 Conditional Use* $300.00 Conditional Use Permit Escrow for Residential Projects $500.00”
City zoning permits inside Motley city limits.
permit inactivity period before void unless extended: 12 months (Extended by Zoning Administrator) · exterior-work completion period: 18 months (May be extended for good cause; second extension decided by Planning Commission)
“Where a proposed use requires action of the Board of Adjustment, Planning Commission or Council or posting of financial security, said action shall occur and the Conditional Use Permit, Variance, Zoning District change, final plat plan approval, approval of metes and bound division shall be issued or security posted before the Zoning Permit is issued.”
Motley does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Development inside Motley’s Floodway, Flood Fringe, and General Floodplain Districts.
“The following uses and activities may be allowed with a permit, subject to the standards in Section 5.2:”
We looked and could not find an official answer yet. Silence is not permission; ask Motley or Morrison County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Motley publishes no rule on the point, not that none exists. Morrison County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Motley means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.