Biscay is a city in McLeod County, Minnesota. 6 rules below are quoted from official sources and independently re-checked, most recently on November 4, 2026. Rules for unincorporated land are on the McLeod County page.
Biscay does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Code-regulated construction inside Biscay city limits.
“An owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any gas, mechanical, electrical, plumbing system, or other equipment, the installation of which is regulated by the code; or cause any such work to be done, shall first make application to the building official and obtain the required permit.”
State Building Code requirements apply to code-governed construction inside Biscay city limits.
“The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, and repair of buildings and other structures of the type governed by the code, except as provided in Minnesota Statutes, section 326B.121. The State Building Code supersedes the building code of any municipality.”
New or replacement SSTS inside Biscay city limits.
“Permits must be required for all new construction and replacement. A local unit of government is authorized to require permits for all or certain types of SSTS repairs.”
New or replacement SSTS inside Biscay city limits.
“A compliance inspection for all new construction or replacement must be conducted:”
Agricultural buildings inside Biscay city limits.
“The State Building Code does not apply to agricultural buildings except with respect to state inspections required or rulemaking authorized by Minnesota Statutes, sections 103F.141, 326B.36, and 326B.121, subdivision 1, paragraph (c), clause (2).”
SSTS construction inside Biscay city limits.
“SSTS permit applications must require the submittal of exhibits necessary for issuing a permit as described in this chapter, along with general requirements for identifying the property and owners, a site evaluation report, a design report, a management plan, and any other information requested by the local unit of government pertinent to this process.”
We looked and could not find an official answer yet. Silence is not permission; ask Biscay or McLeod County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Biscay publishes no rule on the point, not that none exists. McLeod County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Biscay means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.