Marshall County, Minnesota
Warren is a city in Marshall County, Minnesota. Warren adopts its own zoning, so inside its limits Warren’s rules apply, not the county’s. Septic permits inside Warren come from Warren. 15 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Marshall County page.
Construction in Warren city limits.
“The City of Warren requires building permits in the city limits.”
Buildings in Warren city.
“confirmed as the Building Code of the city”
Fences installed in Warren city.
“Once fence is installed you will need to call Building Inspector”
New, altered, or nonconforming uses in Warren floodplain districts.
“It shall be unlawful to use, occupy or permit the use or occupancy of any building or premises or part thereof hereafter created, erected, changed, converted, altered or enlarged in its use or structure until a certificate of zoning compliance shall have been issued by the Zoning Administrator stating that the use of the building or land conforms to the requirements of this chapter.”
Land inside Warren city limits.
“The city is hereby divided into zoning districts”
Land inside Warren city limits.
“The city is hereby divided into zoning districts as shown on the official zoning district map dated December 1972, and filed in the office of the City Administrator/Clerk-Treasurer. The map and all explanatory matter thereon are hereby made a part of this chapter.”
Manufactured homes constructed in or moved into Farm Residential and Residential areas of Warren.
minimum roof pitch: 3:12 (Flat roofs or shed roofs are not permitted.) · minimum dwelling width: >= 24 feet · minimum floor area: >= 960 square feet
“Dwellings, including manufactured homes, shall be constructed in or moved into areas of the city zoned farm residential and residential only if they meet the following minimum standards.”
On-site sewage treatment in Warren floodplain districts where public utilities are not provided.
“Where public utilities are not provided: [...] New or replacement on-site sewage treatment systems must be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters and they shall not be subject to impairment or contamination during times of flooding.”
Construction of an on-site septic system within Warren floodplain districts.
“prior to the construction of a dam, fence or on-site septic system”
On-site sanitation in Warren floodplain districts where public utilities are not provided.
“Any sewage treatment system designed in accordance with the state=s current statewide standards for on-site sewage treatment systems shall be determined to be in compliance with this section.”
Dwellings, including manufactured homes, constructed in or moved into Farm Residential and Residential areas of Warren.
“Dwellings, including manufactured homes, shall be constructed in or moved into areas of the city zoned farm residential and residential only if they meet the following minimum standards. [...] The dwelling shall be connected to all city utilities.”
Subdivisions within Warren floodplain districts.
“No land shall be subdivided which is unsuitable for the reason of flooding, inadequate drainage, water supply or sewage treatment facilities.”
New structures with required off-street automobile storage or standing space in Warren city.
“Off-street automobile storage or standing space shall be provided on every lot on which any new structures are hereafter established; such space shall be provided with vehicular access to a street or alley and shall be deemed to be required open space associated with the permitted use and shall not thereafter be reduced or encroached upon in any manner.”
Development and listed activities within Warren floodplain districts.
“A permit issued by the Zoning Administrator in conformity with the provisions of this chapter shall be secured prior to the erection, addition, modification, rehabilitation (including normal maintenance and repair), or alteration of any building, structure or portion thereof; prior to the use or change of use of a building, structure or land; prior to the construction of a dam, fence or on-site septic system; prior to the change or extension of a non-conforming use; prior to the repair of a structure that has been damaged by flood, fire, tornado or any other source; and prior to the placement of fill, excavation of materials or the storage of materials or equipment within the floodplain.”
Floodplain permit applications in Warren city.
“Application for a permit shall be made in duplicate to the Zoning Administrator on forms furnished by the Zoning Administrator and shall include the following where applicable: plans in duplicate drawn to scale, showing the nature, location, dimensions and elevations of the lot: existing or proposed structures, fill or storage of materials; and the location of the foregoing in relation to the stream channel.”
We looked and could not find an official answer yet. Silence is not permission; ask Warren or Marshall County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Warren publishes no rule on the point, not that none exists. Marshall County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Warren means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.