Grant County, Minnesota
Ashby is a city in Grant County, Minnesota. Ashby adopts its own zoning, so inside its limits Ashby’s rules apply, not the county’s. 11 rules below are quoted from official sources and independently re-checked, most recently on November 4, 2026. Rules for unincorporated land are on the Grant County page.
New residential or commercial construction, accessory structures, residential remodeling changing a structure's size, and commercial remodeling inside Ashby city limits.
“No structure shall be constructed until a land use permit has been obtained from the City Clerk. Land Use Permits will be required for all new construction, whether it is residential or commercial; including, but not limited to accessory structures.”
Land inside Ashby city limits, Grant County, Minnesota.
“City of Ashby, County of Grant, State of Minnesota Ordinance 151 An Ordinance Establishing a Zoning Code This Ordinance shall replace Ordinance 5A “An Ordinance Establishing a Zoning Code for the City of Ashby and Providing for the Administration Thereof.””
Zoning districts inside Ashby city limits.
“ZONING DISTRICTS 151.20 CLASSIFICATION OF ZONING DISTRICTS. (A) R-1 Single Family Residential District (B) R-2 Multi-Family Residential District (C) Industrial and Commercial Business Districts (D) Ag/Residential”
Private wells inside Ashby city limits where municipal water is available and a municipal-water connection is made.
“Private wells, to provide water for other than human consumption, may be constructed, maintained and continued in use after connection is made to the water system; provided, there is no means of cross-connection between the private well and municipal water supply at any time.”
New homes or buildings inside Ashby city limits where municipal water is available to the property.
“All new homes or buildings shall connect to the municipal water system if water is available to the property.”
Applications for city site plans, conditional-use permits, land-use permits, variances, other city approvals, and zoning amendments inside Ashby city limits.
initial final-action period: <= 60 days (unless application is not accepted under Ordinance 151.50) · one-time extension: <= 60 days (unless applicant approves a longer extension in writing)
“Notwithstanding anything to the contrary in this ordinance, all applications for any site plan, conditional use permit, land use permit, variance, or for any other city approval required by this ordinance, or to amend this ordinance, shall be made in writing on a form provided by the city to the City Clerk.”
Ashby does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
R-1 Single-Family Residential District inside Ashby city limits.
minimum lot area: 10000 square feet (100 x 100) · minimum lot width: 75 feet
“Lot requirements and setbacks. The following minimum requirements shall be observed in an R-1 District, subject to additional requirements, exceptions and modifications set forth in this ordinance: (1) Lot area. 10,000 square feet (100 x 100).”
R-1 Single-Family Residential District inside Ashby city limits.
front yard: >= 30 feet (existing structures use the in-line setback of existing structures on the same street) · side yard: >= 6 feet (one side; measured from outer edge of eaves to lot line) · side yard: >= 8 feet (other side; measured from outer edge of eaves to lot line) · rear yard: >= 15 feet
“Front yards. Not less than 30 feet; except in the case of existing structures, the front set-back will be determined to be in-line with those existing structures on that same street.”
C-1 Commercial Business District inside Ashby city limits.
maximum building height: <= 45 feet (or 3 stories, whichever is less; excludes specified grain elevators and grain-storage facilities) · maximum stories: <= 3 stories (or 45 feet, whichever is less; excludes specified grain elevators and grain-storage facilities)
“Building requirements; height. No structure shall exceed 3 stories or 45 feet, whichever is less. This requirement would not apply to grain elevators ors grain storage facilities which have no outside access.”
Agricultural uses in the Ag/Residential District inside Ashby city limits.
“Lot requirements, setbacks, and building requirements– There are no lot requirements, setbacks, and building requirements if it is used for agricultural purposes. If the land is used for residential purposed, it will follow the same guidelines as R-1 Single-Family Residential District.”
Lots in the R-1 Single-Family Residential District inside Ashby city limits.
“Access. All lots shall front on and have ingress and egress by means of a public right-of-way.”
We looked and could not find an official answer yet. Silence is not permission; ask Ashby or Grant County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Ashby publishes no rule on the point, not that none exists. Grant County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Ashby means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.