Wells, Minnesota requires building permits for most construction projects, with applications available at City Hall.1 Wells administers city zoning, while Faribault County zoning applies outside incorporated city limits.23 Where public sewer is unavailable inside Wells, private wastewater construction requires a written city permit and compliance with Minnesota standards.45
At a glance
- Building permits
- Required for most construction; obtain applications at City Hall1
- Zoning
- City zoning; confirm the parcel’s district2
- Private wastewater
- Written city permit before construction where public sewer is unavailable4
- RV living
- We could not confirm permission; ask Wells City Hall6
- Tiny homes
- State dwelling standards apply; Wells zoning permission remains unconfirmed7
- Lot size
- R-2 single-family use: minimum 7,000 square feet8
- Sewer connection
- City connection permit and sufficient downstream capacity required9
Who to call
Building permits
City building-permit applications and construction review
125 South Broadway Wells MN 56097
Planning & zoning
Wells Planning & Zoning Commission
City land-use approvals, variances, conditional uses, rezoning and subdivision applications
125 South Broadway Wells MN 56097
Septic permits
Starting contact for the city private-wastewater permit and sewer-connection review
125 South Broadway Wells MN 56097
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Wells means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Wells, MN?
Wells requires building permits for most construction projects, and many projects also need zoning approval.1 Obtain the building-permit application at Wells City Hall and ask the Building Official to identify the approvals your specific work needs before construction begins.1 The Wells Building Official reviews proposed work against state building-code and city-code provisions; a decision may be appealed to the City Council.10
Wells sets building-permit fees through its city fee schedule, and the full fee is due when you apply.11 Wells says building permits are not valid until paid for and doubles the building-permit fee when the permit is issued after construction has begun.1
Who handles building permits and zoning applications in Wells?
Contact the Wells Building Official through City Hall at 507-553-6371; the city lists [email protected] for building correspondence.1 Wells City Hall is at 125 South Broadway, Wells MN 56097.1 Use the city building-inspection page for construction applications and the Planning & Zoning Commission page for land-use applications.16
The Wells Planning & Zoning Commission page directs applicants to print and return completed forms to City Hall.6 Wells zoning inspections check land-use compliance as part of the building-inspection process.12 For a private wastewater system within Wells, start with City Hall for the written city permit rather than assuming a building application also approves septic construction.413
Does Wells have zoning, lot-size rules and setbacks?
Wells has city zoning, and land uses must conform to the parcel’s zoning district and the other zoning-code requirements.2 Wells districts include general residential, multi-family residential, central business, general business, general industrial and agricultural zones.14 Ask Wells City Hall to confirm the district before choosing a house plan or buying a lot.6
In Wells’s R-2 Multi-Family Residential District, single-family use requires a minimum lot area of 7,000 square feet.8 For that same R-2 single-family use, the front and corner-side yards are 20 feet, the rear yard is 35 feet, and the interior-side yard is 10 feet.15 Those dimensions are district- and use-specific; the R-2 table gives different requirements for other uses.15
How do septic permits and sewer connections work inside Wells?
Where public sewer is unavailable inside Wells, private wastewater construction requires a written permit signed by the city before work starts.4 The application uses a city form and may require plans, specifications and other information.4 A private system must comply with Minnesota standards, and additional Minnesota Pollution Control Agency or Department of Health requirements may apply.5
Wells may inspect private wastewater work at any stage; the permit holder must notify the city for final inspection before underground portions are covered, with inspection within 72 hours after notice.16 When public sewer becomes available to property served by a private system, Wells requires connection within 30 days.9 A public-sewer connection also requires a written city permit and sufficient downstream capacity.9 Ask City Hall about sewer availability before budgeting for a private system.13
Can you live in an RV or tiny home on land in Wells?
We could not confirm whether Wells allows residential RV occupancy, temporary camping while building, or a tiny home on a particular lot; ask Wells City Hall about the proposed use and zoning district before buying.6 Minnesota’s tiny-house rules require dwelling units to meet residential building standards, while municipal zoning controls matters such as location, foundation type and building size.7 State tiny-house construction standards therefore do not establish permission for residential occupancy on a Wells parcel.7
Wells’s R-2 rules allow approved manufactured homes subject to R-1 design standards, approved skirting when no permanent foundation is used, and the manufactured-home-park provisions.17 That manufactured-home provision does not answer the separate RV or tiny-home question; request the city’s decision on the actual dwelling you propose.176
Building a home in Wells: what are the steps, in order?
- Confirm the Wells zoning district and whether the proposed residential use complies with city zoning before finalizing the layout.2
- Ask City Hall whether public sewer is available; obtain the appropriate city sewer-connection or private-wastewater permit.94
- Submit the building application through Wells City Hall and pay the full city building-permit fee at application.111
- Allow time for review: Wells asks for new-construction building applications at least 14 days before work starts and remodeling applications at least 7 days beforehand.1
- Arrange required land-use inspections and, for a private wastewater system, notify the city before covering underground work.1216
For land outside Wells city limits, consult the Faribault County guide: county zoning review applies outside incorporated cities.3 Direct driveway connections to a Minnesota state highway require a MnDOT access permit before construction or modification.18
Watch-outs
- Wells doubles the building-permit fee for building permits issued after construction has begun.1
- R-2 single-family lot dimensions are not a citywide standard for every Wells district or use.815
- We could not confirm Wells’s local certificate-of-occupancy or private-well procedures; ask the Building Official and City Hall before scheduling a move or well work.113
Sources
- Wells Building Official (cityofwellsmn.gov)
- Chapter 152: Zoning Code (Wells), quoted and re-checked
- Administrative Split/Combine Information & Form, quoted and re-checked
- § 50.18 Private Wastewater Disposal (Wells), quoted and re-checked
- § 50.18 Private Wastewater Disposal (Wells), quoted and re-checked
- Wells Planning & Zoning Commission (cityofwellsmn.gov)
- Tiny Houses and the 2020 Minnesota Residential Code (Minnesota statewide rule), quoted and re-checked
- codelibrary.amlegal.com (Wells), quoted and re-checked
- § 50.19 Building Sewers and Connections (Wells), quoted and re-checked
- § 152.137 Building Permits (Wells), quoted and re-checked
- § 152.137 Building Permits (Wells), quoted and re-checked
- § 152.155 Zoning Administrator (Wells), quoted and re-checked
- Wells City Hall (cityofwellsmn.gov)
- § 152.020 Classification of Zones (Wells), quoted and re-checked
- codelibrary.amlegal.com (Wells), quoted and re-checked
- § 50.18 Private Wastewater Disposal (Wells), quoted and re-checked
- § 152.053 Performance Standards (Wells), quoted and re-checked
- MnDOT Access Management Manual, Chapter 4 (Minnesota statewide rule), quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.