Faribault County, Minnesota
Bricelyn is a city in Faribault County, Minnesota. Septic permits inside Bricelyn come from Faribault County (Faribault County Septic Systems · 507-526-2388). 6 rules below are quoted from official sources and independently re-checked, most recently on November 4, 2026. Rules for unincorporated land are on the Faribault County page.
Bricelyn does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction inside Bricelyn city limits that is governed by the Minnesota State Building Code.
“The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, and repair of buildings and other structures of the type governed by the code, except as provided in Minnesota Statutes, section 326B.121.”
Buildings or structures inside Bricelyn city limits subject to State Building Code administration.
“No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building, structure, or portion of a building or structure shall be made until the building official has issued a certificate of occupancy for the building or structure under this part.”
SSTS inside Bricelyn city limits when Bricelyn does not administer a conforming SSTS ordinance.
“All counties with SSTS ordinances must permit and inspect SSTS within cities and townships that do not administer an SSTS ordinance that complies with these rules.”
New or replacement SSTS inside Bricelyn city limits, through the locally responsible SSTS program.
“Permits must be required for all new construction and replacement. A local unit of government is authorized to require permits for all or certain types of SSTS repairs.”
New-construction and replacement SSTS inside Bricelyn city limits, through the locally responsible SSTS program.
“Local units of government must adopt and implement a construction inspection program for new construction and replacement SSTS to enforce requirements under this chapter.”
Monitoring wells and bored geothermal heat exchangers inside Bricelyn city limits.
“Note: For some other types of wells or borings, such as monitoring wells or bored geothermal heat exchangers, construction permits are required. Permit applications must be submitted to MDH for review and written approval prior to start of work.”
We looked and could not find an official answer yet. Silence is not permission; ask Bricelyn or Faribault County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Bricelyn publishes no rule on the point, not that none exists. Faribault County’s page lists the county offices to call.