Cass County, Minnesota
Remer is a city in Cass County, Minnesota. Remer adopts its own zoning, so inside its limits Remer’s rules apply, not the county’s. 20 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Cass County page.
All new structures inside Remer city limits, under the City's zoning-permit program.
“Zoning Permits are required for all new structures and any change in structure dimensions, structural components, number of bedrooms”
Existing structures or uses in Remer city subject to approval conditions for a variance, conditional use permit, or other land-use application.
certificate deadline: <= 12 months (unless an extension is granted under Section 11.6)
“Any existing structure or use of property subject to conditions of approval for a Variance, Conditional Use Permit or other land use application must have a Land Use Certificate of Compliance issued within twelve (12) months of the approval, unless an extension is granted under Section 11.6.”
All property within Remer city municipal limits.
“The jurisdiction of this Ordinance shall include all property within the City of Remer municipal limits.”
All property within Remer city municipal limits.
districts: Forest Preservation (FP); Forest Residential (FR); Neighborhood Residential (NR); Rural Preservation (RP); Downtown Mixed-Use (DM); Commercial Transition/Light Industrial (CT); Recreation (REC)
“Zoning Districts. The following Districts are hereby established: Forest Preservation [...] Forest Residential [...] Neighborhood Residential [...] Rural Preservation [...] Downtown Mixed-Use [...] Commercial Transition/Light Industrial [...] Recreation”
Individual units in a manufactured-housing development inside Remer city limits.
minimum unit size: >= 640 square feet (manufactured-housing development)
“Each unit shall be a minimum of 640 square feet.”
Forest Residential (FR) district inside Remer city limits.
minimum buildable lot area: >= 5 acres (Forest Residential district) · minimum lot width: >= 400 feet (Forest Residential district)
“Lot width – feet, minimum 400 Buildable lot area– acres 5”
Forest Residential (FR) district inside Remer city limits.
city-road right-of-way setback: >= 30 feet (Forest Residential district) · county-or-state-road right-of-way setback: >= 50 feet (Forest Residential district) · side-yard setback: >= 30 feet (Forest Residential district) · rear-yard setback: >= 30 feet (Forest Residential district)
“Setback, right of way, City road- feet, minimum 30 Setback, right of way, County or State road - feet, minimum 50 Setback, side yard – feet, minimum 30 Setback, rear yard – feet, minimum 30”
Forest Residential (FR) district inside Remer city limits.
maximum impervious coverage: <= 10 percent (Forest Residential district)
“Impervious coverage - percent maximum 10%”
Forest Residential (FR) district inside Remer city limits.
maximum dwelling height: <= 25 feet (Forest Residential district) · maximum accessory-structure height: <= 25 feet (Forest Residential district)
“Building height, dwelling – feet, maximum 25 Building height, accessory structure – feet, maximum 25”
Camping units, including recreational vehicles, on property inside Remer city limits.
maximum use with principal structure: <= 14 days within 60 days (individual camping unit)
“No camping unit may be permanently placed or skirted. [...] All camping units must be able to be moved readily.”
Camping units on property inside Remer city limits.
maximum units: <= 4 units (at any one time) · permit-free duration without principal structure: <= 14 days per calendar year (individual camping unit)
“There shall be a maximum of four units allowed at any one time. [...] Each individual camping unit is allowed for 14 days in any one calendar year without a permit.”
Manufactured-housing developments inside Remer city limits.
minimum development parcel: >= 20 acres (manufactured-housing development) · minimum unit size: >= 640 square feet (manufactured-housing development)
“Manufactured housing development shall be considered a form of P.U.D. and administered as a Conditional Use in the zoning district where said use is allowed. [...] A Minnesota Department of Health Permit shall be required.”
Construction or repair of a sewage system inside Remer city limits.
“Zoning Permits are required for all new structures and any change in structure dimensions, structural components, number of bedrooms, any construction or repair of a sewage system”
Camping units on Remer city property without a principal structure that are established more than 14 days in a calendar year.
permit-free camping period: <= 14 days per calendar year (property without a principal structure) · maximum individual-unit establishment: <= 9 months per calendar year (property without a principal structure)
“A permit is required for camping units established for more than 14 days in any one calendar year. [...] A permit for a camping unit requires installation of a permanent sewage treatment system.”
Subdivision of property inside Remer city limits.
metes-and-bounds approval threshold: < 10 acres (if either resulting parcel is less than 10 acres or 500 feet of width) · metes-and-bounds split frequency: <= 1 split per three years (split into two parcels)
“Subdivision by Plat or Condominium Plat shall be in accordance with Section IX and shall be approved by the Planning Commission and City Council. Subdivision by metes and bounds shall be subject to approval by the Planning Commission in accordance with Section IX if either of the resulting parcels is less than 10 acres or 500 feet of width and shall be limited to no more than one split of a parcel into two parcels in a three year period of time.”
Rural Conservation Subdivision development inside Remer city limits.
“Areas identified as being environmentally sensitive include, but are not limited to: i. All areas designated as 100-year floodplain by the Federal Emergency Management Agency (FEMA).”
Residentially zoned property rented or leased more than once within three months inside Remer city limits.
minimum period between rentals: >= 7 days (property may not be rented more than one time in the period) · maximum rental frequency: <= 6 times per twelve months (registered rental property)
“All property owners seeking to or renting or leasing residentially-zoned property within the City of Remer more than one time within three months must annually register the property with the Planning and Zoning office.”
City building-permit applications in Remer.
building permit fee basis: project valuation (collected when the application is turned in)
“Building permit fees are based on the valuation of the project and collected when the application is turned in.”
City land-use applications and zoning permits inside Remer city limits.
“It shall be the applicant's responsibility to submit a completed application packet, which shall by definition include the application forms approved by the City, site plan with all information required by this ordinance and remit proper fees for the land use application.”
Remer does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Plumbing systems in buildings inside Remer city limits where public sewer is available and feasible or public water is accessible.
“If a public sewer is available in a street or alley to a building or premises and the connection is feasible, liquid waste from any plumbing system in that building shall be discharged into the public sewer unless otherwise prohibited by this code or a local ordinance. If a public water supply is accessible, the water distribution system shall be connected to it unless otherwise permitted by the Authority Having Jurisdiction.”
We looked and could not find an official answer yet. Silence is not permission; ask Remer or Cass County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Remer publishes no rule on the point, not that none exists. Cass County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Remer means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.