Carver County, Minnesota
New Germany is a city in Carver County, Minnesota. New Germany adopts its own zoning, so inside its limits New Germany’s rules apply, not the county’s. Septic permits inside New Germany come from New Germany. 11 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Carver County page.
Land within New Germany city limits.
“The City has an adopted Zoning Map shown on Figure 7.1 and a Zoning Ordinance and Subdivision Ordinance to implement the Comprehensive Plan.”
Zoning districts within New Germany city limits.
“R-1 | Table 7.1 – City of New Germany Zoning Districts None | Single Family Residential | 10,000 square feet | R-2 | Table 7.1 – City of New Germany Zoning Districts None | Multiple Family Residential | 16 dwelling units/acre maximum | A | Table 7.1 – City of New Germany Zoning Districts None | Agricultural | 2 acres | B | Table 7.1 – City of New Germany Zoning Districts None | Business/Commercial | Not applicable | I | Table 7.1 – City of New Germany Zoning Districts None | Industrial | 30,000 square feet | P | Table 7.1 – City of New Germany Zoning Districts None | Parks/Open Space | Not applicable |”
Subsurface sewage treatment systems and municipal sewer service within New Germany city limits.
“The City prohibits the construction of these systems within their jurisdiction and requires connection of all residences and businesses within proximity to the sewer system.”
Use or construction of subsurface sewage treatment systems within New Germany city limits.
“The City prohibits the construction of these systems within their jurisdiction and requires connection of all residences and businesses within proximity to the sewer system. All homes and businesses within proximity of the sewer system are connected. However, there are three farmsteads located in the southwest portion of the city that are served by private individual sewage treatment systems.”
New development and residences or businesses within proximity to the municipal sewer system inside New Germany city limits.
“2. Connection of all new development to municipal sanitary sewer and water systems.”
Subdivision development within New Germany city limits.
“In addition to the above, the City has adopted a Planned Unit Development subdivision process that allows variations of the dimensional requirements of the Zoning and Subdivision Ordinances for projects that meet other community goals and objectives.”
Lots within New Germany city limits obtaining access from a minor arterial or collector roadway.
maximum access points per lot: <= 1 access (Lots obtaining access from a minor arterial or collector roadway)
“The following standards apply to lots that obtain access from a minor arterial or collector roadway: [...] A maximum of one access per lot shall be permitted. [...] The driveway shall have a turn-around area to prevent backing onto the roadway. [...] An access permit shall be required from the County or MnDOT, as appropriate.”
City planning, variance, ordinance-amendment, and special-use-permit matters within New Germany city limits.
“The City of New Germany has directed its Planning Commission to review and make recommendations to the City Council on the Comprehensive Plan, zoning ordinances, requests for variances, ordinance amendments, and special use permits.”
New Germany does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
A Agricultural District within New Germany city limits.
minimum lot area: 2 acres
“A | Table 7.1 – City of New Germany Zoning Districts None | Agricultural | 2 acres |”
“R-1 | Table 7.1 – City of New Germany Zoning Districts None | Single Family Residential | 10,000 square feet |”
Fences in the R-1 and R-2 zoning districts within New Germany city limits.
fence setback from property line: >= 2 feet
“R1/R2 Zoning District Limitations [...] b. A fence shall be setback at least (two) 2 feet from the property lines.”
We looked and could not find an official answer yet. Silence is not permission; ask New Germany or Carver County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that New Germany publishes no rule on the point, not that none exists. Carver County’s page lists the county offices to call.
Off-grid gear
Going off-grid in New Germany means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.