Carver County, Minnesota
Cologne is a city in Carver County, Minnesota. 7 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Carver County page.
Building code in force inside Cologne city limits (Chapter 150, Building Regulations).
“the minnesota state building code, established pursuant to m.s. §§ 16b.59 through 16b.75, as they may be amended from time to time, is hereby adopted as the building code for this municipality.”
Zoning districts inside Cologne city limits under Code § 153.030 (A Agriculture, R-1, R-2, R-3, PUD, C-1, C-2, C-3, I-1, P/I, downtown and shoreland overlays).
“for the purposes of this chapter, the city of cologne is hereby divided into the following zoning districts: (a) a agriculture; (b) r-1 single-family detached residential district; (c) r-2 single-family attached residential district;”
R-1 single-family detached residential district, Cologne city: new single-family subdivisions (minimum lot width for part of the lots).
minimum lot width (for at least 25% of new single-family detached lots): >= 120 feet (corner lots meeting this requirement must be at least 135 feet in width)
“each new development must provide at least 25% of the total number of single-family detached dwelling lots with a minimum lot width of 120 feet (corner lots meeting this requirement must be at least 135 feet in width.)”
All zoning districts inside Cologne city limits (numeric setbacks for R-1 and A are in § 153.043, not retrieved).
“structure setback requirements and dimensional standards for all zoning districts are illustrated in § 153.043.”
New homes or buildings on land inside Cologne city limits.
“all new homes or buildings shall connect to the municipal water system if water is available to the property.”
Land divisions inside Cologne city limits.
“chapter 150: building regulations chapter 151: swimming pools chapter 152: subdivision regulations chapter 153: zoning code”
Zoning actions and permit applications inside Cologne city limits that require site plan review.
“(b) review requirements. (1) applicants shall submit 12 sets of site plans with a required application form to the city clerk for distribution.”
We looked and could not find an official answer yet. Silence is not permission; ask Cologne or Carver County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Cologne publishes no rule on the point, not that none exists. Carver County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Cologne means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.