Big Stone County, Minnesota
Graceville is a city in Big Stone County, Minnesota. Graceville adopts its own zoning, so inside its limits Graceville’s rules apply, not the county’s. 14 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Big Stone County page.
Erecting, altering, or moving a building or structure inside Graceville city limits when the cost exceeds $500.
project-cost threshold: > 500 USD (Applies to erecting, altering, or moving a building or structure.)
“No person shall hereafter erect, alter or move any building or structure, the cost of which exceeds $500.00 without first obtaining a building permit.”
Vacant land and structures constructed, reconstructed, relocated, or structurally altered inside Graceville city limits.
issuance period after completion and approval: <= 10 days (Applies to structures constructed, reconstructed, relocated, or structurally altered.)
“From and after the effective date of this ordinance, no vacant land and no structure hereafter constructed, reconstructed, relocated or structurally altered with the city shall be occupied or used for any purpose other than agricultural purposes unless a certificate of occupancy is first obtained from the zoning administrator.”
Land inside Graceville city limits.
“This Ordinance shall be known as the “Zoning Ordinance of the City of Graceville, Minnesota,” except as referred to herein, where it shall be known as “this Ordinance.””
Zoning districts inside Graceville city limits.
districts: A-O Agricultural-Open Space; R-1 Low Density Residential; R-2 Medium Density Residential; C-1 Commercial
“The following zoning districts are hereby established within the City. A-O, Agricultural-Open Space District R-l, Low Density Residential District R-2, Medium Density Residential District C-1, Commercial”
Certificate-of-occupancy requirement for land and structures inside Graceville city limits used for agricultural purposes.
“From and after the effective date of this ordinance, no vacant land and no structure hereafter constructed, reconstructed, relocated or structurally altered with the city shall be occupied or used for any purpose other than agricultural purposes unless a certificate of occupancy is first obtained from the zoning administrator.”
Building permits and listed zoning applications inside Graceville city limits.
single-family housing development fee: 50 USD · driveway permit fee: 10 USD
“The fees to be paid for building permit shall be as follows: 1. Single Family Housing Development $50.00”
Building-permit applications inside Graceville city limits.
“Applications for a permit shall be made to the zoning administrator on forms provided by the city. Each application shall comply with the building code and shall be accompanied by a plan drawn to scale showing the dimensions of the lot or parcel on which the structure is or is to be located; the legal description of the lot or parcel, size and location of the structure and accessory structures if any, to be constructed, reconstructed or structurally altered on the lot or parcel, and such other information as may be deemed necessary by the zoning administrator for the proper enforcement of this ordinance.”
Graceville does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Buildings inside Graceville city limits that are governed by the Minnesota State Building Code.
“The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, and use of buildings and other structures of the type governed by the code.”
Dwellings in the R-1 Low Density Residential District inside Graceville city limits.
minimum dwelling width: > 22 feet · minimum dwelling length: > 28 feet
“Dwellings shall exceed twenty-two (22) feet in width and shall be over twenty-eight (28) feet in length.”
Single-family dwellings in the R-1 Low Density Residential District inside Graceville city limits.
minimum lot area: >= 11700 square feet (Single-family dwelling.) · minimum width at front-yard setback line: >= 100 feet (One- or two-family dwelling lot.) · minimum lot depth: >= 117 feet (One- or two-family dwelling lot.)
“A lot area of not less than eleven thousand seven hundred (11,700) square feet is required for single family dwelling and a minimum lot area of twenty-one thousand (21,000) square feet is required for every two family dwelling hereinafter erected, enlarged, or moved.”
Lots in the R-1 Low Density Residential District inside Graceville city limits.
front yard: >= 35 feet · side yard: >= 10 feet (Or ten percent of front-yard width, whichever is less.) · rear yard: >= 20 feet
“Front Yards. A front yard of not less than thirty-five (35) feet is required. B. Side Yards. Two (2) side yards are required, each with a width of not less than ten feet or ten percent (10%) of the front yard width, whichever is less.”
Lots in the R-1 Low Density Residential District inside Graceville city limits.
maximum building or structure lot coverage: <= 35 percent
“No more than thirty-five (35) percent of the lot area shall be occupied by buildings or structures.”
Buildings in the R-1 Low Density Residential District inside Graceville city limits.
maximum building height: <= 35 feet
“Maximum Building Heights. Building heights shall not exceed thirty-five (35) feet.”
Apartments within existing single-family dwellings in the R-1 Low Density Residential District inside Graceville city limits.
“Apartments within existing single family dwellings.”
We looked and could not find an official answer yet. Silence is not permission; ask Graceville or Big Stone County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Graceville publishes no rule on the point, not that none exists. Big Stone County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Graceville means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.