Benton County, Minnesota
Rice is a city in Benton County, Minnesota. Rice adopts its own zoning, so inside its limits Rice’s rules apply, not the county’s. Septic permits inside Rice come from the county and state together. 7 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Benton County page.
Land inside Rice city limits, Rice, Minnesota.
“The role of the Planning Commission is to prepare and periodically review the Comprehensive Plan and then putting that plan into action through zoning/subdivision regulations, zoning map, and a capital improvement program.”
Zoning district mapping inside Rice city limits.
“The role of the Planning Commission is to prepare and periodically review the Comprehensive Plan and then putting that plan into action through zoning/subdivision regulations, zoning map, and a capital improvement program.”
Subdivision of land inside Rice city limits.
“The role of the Planning Commission is to prepare and periodically review the Comprehensive Plan and then putting that plan into action through zoning/subdivision regulations, zoning map, and a capital improvement program.”
Land-use planning and subdivision review inside Rice city limits.
“The Planning Commission is a recommending commission to the City Council. The role of the Planning Commission is to prepare and periodically review the Comprehensive Plan and then putting that plan into action through zoning/subdivision regulations, zoning map, and a capital improvement program.”
Rice does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Individual subsurface sewage treatment systems inside Rice city limits, where a property uses such a system rather than municipal sewer.
“These environmental protection standards shall be adopted countywide and administered and enforced by local units of government as directed by chapter 7082 and Minnesota Statutes, section 115.55.”
Hand-carried-water graywater disposal inside Rice city limits.
“Graywater that originated from hand-carried water must not be discharged directly to surface waters, drainageways, or poorly drained soils; in a manner or volume harmful to the environment or public health; or in a manner that creates a public health nuisance as determined by the local unit of government.”
Water-supply-well construction inside Rice city limits.
notification validity: 18 months
“The owner of the property where a water-supply well is to be located, the property owner's agent, a licensed well contractor, or for a drive-point water-supply well, a limited drive-point well or dug well/boring contractor must submit notification of construction of the proposed water-supply well to the commissioner according to this part.”
We looked and could not find an official answer yet. Silence is not permission; ask Rice or Benton County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Rice publishes no rule on the point, not that none exists. Benton County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Rice means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.