Washtenaw County, Michigan

Zoning, building permits and septic rules in Scio Township, Michigan

Scio Township is a township in Washtenaw County, Michigan. 9 rules below are quoted from official sources and independently re-checked, most recently on October 18, 2026. Rules for unincorporated land are on the Washtenaw County page.

Answers from the rulebook for Scio Township

Scio Township’s own rules

  • Building permitRequired

    Dwelling-unit construction inside Scio Township.

    • Construction may commence only after a building permit is obtained under applicable Michigan State Construction Code requirements.
    “All construction shall be commenced only after a building permit has been obtained in accordance with the applicable Michigan State Construction Code provisions and requirements.”
  • Building code adoptedAdopted (with conditions)

    State-construction-code responsibilities within Scio Township corporate limits.

    • Washtenaw County Building Department is the designated enforcing agency under the intergovernmental agreement.
    “The Washtenaw County Building Department through said intergovernmental agreement assumes responsibility for the administration and enforcement of said act throughout the corporate limits of Scio Township.”
  • Camping on your landProhibited

    Temporary campgrounds inside Scio Township.

    • This claim addresses temporary campgrounds, not all individual private camping activity.
    “Temporary campgrounds are strictly prohibited.”
  • Manufactured homesLimited

    Mobile homes used as dwelling units inside Scio Township, except a mobile home in a licensed mobile-home park as stated in the ordinance.

    • Mobile homes must be installed under manufacturer instructions, secured by compliant anchoring, and have the specified perimeter wall.
    • The listed dwelling standards do not apply to a mobile home in a licensed mobile-home park except as required by state or federal law or a Township park ordinance.
    “If the dwelling is a mobile home, as defined herein, such dwelling and any addition shall be installed pursuant to the manufacturer's instructions and shall be secured to the premises by an anchoring system or device complying with the rules and regulations of the state mobile home commission and shall have a perimeter wall as required above.”
  • Off-grid sanitationLimited

    Dwelling units inside Scio Township using on-site water or sanitary sewerage facilities.

    • On-site facilities must have County Health Department approval.
    “Each dwelling unit shall be connected to public water and sanitary sewer lines, or to on-site water and sanitary sewerage facilities approved by the county health department.”
  • Mandatory utility hookupWater (with conditions)

    A premises abutting the Township water system inside Scio Township.

    • Connection is required for a new structure except sheds, residential garages, and additions to existing structures with existing private wells.
    • Connection is also required when an abutting premises' private well becomes inoperative or contaminated.
    “Each premises abutting the system within the township whose private water well becomes inoperative and/or contaminated, or each new structure, other than sheds, residential garages, and/or additions to existing structures with existing private water wells, shall be required to connect to the system by the provisions of this article.”
  • Subdividing landRegulated (with conditions)

    Subdivision plats inside Scio Township.

    • A preliminary-plat applicant must submit six copies, a completed application, plat-review fees, and required information to the Township Clerk at least 30 days before the relevant Planning Commission meeting.

    preliminary plat filing lead time: >= 30 days (before the regular Planning Commission meeting at which the plat is considered)

    “The proprietor shall file six copies of the preliminary plat together with a completed application form, plat review fees, and the required information with the township clerk at least 30 days prior to the regular planning commission meeting at which the plat is to be considered.”
  • Permit processPartial

    Subdivision preliminary-plat process inside Scio Township.

    • This is a published subdivision process, not a complete process for every building-permit type.

    preliminary plat copies: 6 copies

    “The proprietor shall file six copies of the preliminary plat together with a completed application form, plat review fees, and the required information with the township clerk at least 30 days prior to the regular planning commission meeting at which the plat is to be considered.”

Rules another office applies inside Scio Township

Scio Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Accessory dwellingsAllowed (with conditions)

    Accessory dwelling units in the R-C, A-1, E-R, R-1, R-2, and R-3 zoning districts inside Scio Township.

    • Maximum unit area is 1,000 square feet.
    • Only one ADU per lot or parcel; property owners must reside on site; district setback and lot-coverage rules apply; one additional off-street parking space is required.

    maximum ADU area: <= 1000 square feet · ADUs per lot or parcel: 1

    “Accessory dwelling units shall be a permitted land use in the R-C, A-1, E-R, R-1, R-2 and R-3 zoning districts.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Scio Township or Washtenaw County directly.

  • Owner-builder exemption — Owner-built residences inside Scio Township.
  • Inspections — Residential building work inside Scio Township.
  • Certificate of occupancy — New or altered residential buildings inside Scio Township.
  • Minimum lot size — Residential districts inside Scio Township.
  • Setbacks — Principal single-family dwellings in Scio Township residential districts.
11 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Tiny homes
  • Septic permit
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Scio Township publishes no rule on the point, not that none exists. Washtenaw County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Scio Township means bringing your own water and power. The kit we’d start with: