The Village of Paw Paw, Michigan requires a building permit before new construction, building excavation, relocation, or changes to building dimensions or use.1 In Van Buren County, Paw Paw administers village zoning and coordinates contract building services through Community Development; septic approval comes from the Van Buren/Cass District Health Department where public sewer is unavailable.234 Paw Paw prohibits using a parked RV as a dwelling in residential districts.5
At a glance
- Building permits
- Required before construction, excavation and listed building alterations1
- Zoning
- Village zoning; Community Development handles inquiries23
- RV living
- Parked RVs cannot be dwellings in residential districts5
- Minimum home size
- One-story dwellings: R-1 requires 1,000 sq ft; R-2 requires 800 sq ft67
- Sewer and septic
- Village sewer connection rules apply; district health approval needed where sewer is unavailable84
- Owner-builder
- State licensing exemption for own use and occupancy on own property; building requirements still apply9
- Move-in approval
- Building inspector must issue a certificate of occupancy for a new principal building or dwelling10
Who to call
Building permits
Village of Paw Paw Community Development Department
Planning and zoning inquiries, code inspections and coordination with contract building department services; phone is the village main number.
111 E. Michigan Ave. | P.O. Box 179 Paw Paw, MI 49079-0179
Septic permits
Van Buren/Cass District Health Department, Environmental Health
Septic system permitting and well services for village properties using private systems.
260 South Street Lawrence, MI 49064
Also useful
Village of Paw Paw Department of Public Services
Village water and sanitary sewer services and street maintenance; ask about service availability and proposed access.
110 Harry L. Bush Blvd. P.O. Box 179 Paw Paw, MI 49079
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Village of Paw Paw means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in the Village of Paw Paw, MI?
Paw Paw requires a building permit before a building is erected, relocated, altered in exterior or interior dimensions or use, or excavated for; eligibility depends on compliance with village zoning and other village regulations.1 A new principal building or dwelling in Paw Paw cannot be occupied until the building inspector issues a certificate of occupancy.10 Michigan enforcing agencies periodically inspect construction performed under their building permits for compliance with the permit, code and applicable laws.11 Michigan’s owner-builder licensing exemption covers construction for the individual’s own use and occupancy on their own property, but does not remove building permit, inspection, zoning or utility requirements.9
Who handles building permits and zoning in the Village of Paw Paw?
The Village of Paw Paw Community Development Department handles planning and zoning inquiries and serves as liaison with the village’s contract building department services.12 Start with Community Development to identify the application route and the building service responsible for your project.3 The department also handles rental, property-maintenance and code inspections.12 Septic system approval inside Paw Paw remains with the Van Buren/Cass District Health Department, rather than moving to the village building counter.13 We could not confirm the operative village building or zoning fee schedule; ask Community Development for the current charges and required application materials.3
Does the Village of Paw Paw have zoning, lot sizes and setbacks?
Paw Paw has village zoning with district-specific dimensional standards.2 In Paw Paw’s R-1 district, the minimum lot area per unit is 10,000 square feet; in R-2, the minimum is 8,700 square feet.1415 The R-1 schedule gives a 30-foot front yard and 25-foot rear yard, with footnotes that can modify front and side setbacks.16 Paw Paw’s R-2 schedule also gives a 30-foot front yard and 25-foot rear yard, subject to its footnotes.17 Ask Community Development to confirm the parcel’s district and interpret the applicable setback footnotes before positioning a house or addition.3
Can you live in an RV or tiny home in the Village of Paw Paw?
A recreational vehicle parked in a Paw Paw residential district cannot be used as a dwelling; parking an RV does not authorize residential occupancy.5 Paw Paw’s minimum floor area for a one-story single-family dwelling is 1,000 square feet in R-1 and 800 square feet in R-2.67 Those floor-area calculations exclude basements, breezeways, unenclosed porches, terraces, attached garages and attached sheds.67 We could not confirm separate Paw Paw tiny-home, accessory-dwelling or temporary private-land camping rules; ask Community Development about the exact structure and intended occupancy before buying it.3
How do sewer connections and septic permits work inside Paw Paw?
Paw Paw requires qualifying occupied or used properties abutting a village public sewer to connect at the owner’s expense when the sewer is within 100 feet of the nearest property line, within 90 days after official notice.8 Ask Public Services about sewer availability before budgeting for private wastewater disposal.18 Where public sewer is unavailable, Paw Paw cannot issue a new-construction building permit or allow construction until district health approval or a sewage disposal permit is obtained.4 Septic construction, installation, alteration, repair or extension requires written application and permit confirmation, with specified exceptions for line replacement and tank repairs.4 A permitted septic tank or tile disposal installation cannot be backfilled until district inspection and approval.19
Building a home in the Village of Paw Paw: what comes first?
- Ask Community Development to confirm zoning and coordinate the contract building department application route.3
- Ask Public Services about sewer service; where public sewer is unavailable, obtain district health approval before the village building permit or construction.184
- Obtain the building permit before excavation or construction and arrange required construction inspections with the enforcing agency.111
- Obtain the building inspector’s certificate of occupancy before using a new principal building or dwelling.10
For land outside village limits, consult the Van Buren County guide: zoning is administered by the relevant city, village or township.20
What should you check before buying land in the Village of Paw Paw?
Paw Paw’s wastewater ordinance prohibits privies, septic tanks, cesspools and other wastewater disposal facilities except as provided in the sewer division; an off-grid sanitation plan needs to satisfy those exceptions and sewer connection rules.21 New or replacement private wells in Van Buren County go through district health permit issuance and final inspection.22 The district health code also bars a disposal field in the 100-year floodplain.23 Michigan prohibits new residential construction in regulated floodways, and EGLE floodplain approval can apply to regulated rivers, streams and drains.24 Ask Community Development about village floodplain review and Public Services about proposed driveway access; we could not confirm Paw Paw’s specific floodplain or curb-cut requirements.318
Watch-outs
- Paw Paw’s residential RV dwelling prohibition applies even though RV parking and dwelling use are separate questions.5
- Where public sewer is unavailable in Paw Paw, district health approval must precede the new-construction building permit or commencement of construction.4
- A resident property owner may perform permitted sewage-system construction, repair or extension, but the written septic permit requirement remains.25
Sources
- Code of Ordinances, § 42-361 General regulations (Village of Paw Paw), quoted and re-checked
- Code of Ordinances, § 42-401 Schedule of district regulations (Village of Paw Paw), quoted and re-checked
- Community Development and Codes (Village of Paw Paw), quoted and re-checked
- Van Buren/Cass District Environmental Health Code (Village of Paw Paw), quoted and re-checked
- Code of Ordinances, § 42-401 footnote a (Village of Paw Paw), quoted and re-checked
- Code of Ordinances, § 42-401 Schedule of district regulations (Village of Paw Paw), quoted and re-checked
- Code of Ordinances, § 42-401 Schedule of district regulations (Village of Paw Paw), quoted and re-checked
- Code of Ordinances, § 38-103 Use of public sewers required (Village of Paw Paw), quoted and re-checked
- Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
- Code of Ordinances, § 42-361 General regulations (Village of Paw Paw), quoted and re-checked
- MCL 125.1512, Inspection of construction (Michigan statewide rule), quoted and re-checked
- Village of Paw Paw Community Development Department (pawpaw.net)
- Van Buren/Cass District Environmental Health Code (Village of Paw Paw), quoted and re-checked
- Code of Ordinances, § 42-401 Schedule of district regulations (Village of Paw Paw), quoted and re-checked
- Code of Ordinances, § 42-401 Schedule of district regulations (Village of Paw Paw), quoted and re-checked
- Code of Ordinances, § 42-401 Schedule of district regulations (Village of Paw Paw), quoted and re-checked
- Code of Ordinances, § 42-401 Schedule of district regulations (Village of Paw Paw), quoted and re-checked
- Village of Paw Paw Department of Public Services (pawpaw.net)
- Van Buren/Cass District Environmental Health Code (Village of Paw Paw), quoted and re-checked
- PROPERTY: What is the zoning on my parcel?, quoted and re-checked
- Code of Ordinances, § 38-103 Use of public sewers required (Village of Paw Paw), quoted and re-checked
- Well, Septic, and Short-Term Rental Services, quoted and re-checked
- Environmental Health Code 2025, quoted and re-checked
- Floodplains (Michigan statewide rule), quoted and re-checked
- Van Buren/Cass District Environmental Health Code (Village of Paw Paw), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.