Village of Millington, Michigan requires village zoning approval before building permits through Tuscola County Building Codes.1 The village regulates land use; Tuscola County Health Department handles private septic systems and wells.23 RV dwelling use requires a temporary-use permit from the village Planning Commission.4
At a glance
- Building permits
- Village zoning approval first; building permits through Tuscola County Building Codes1
- Zoning
- Village ordinance regulates land use and development2
- Septic
- County health permit before private-system construction where public sewer is unavailable5
- RV living
- Dwelling use requires Planning Commission temporary-use authorization4
- Dwelling size
- Efficiency minimum: 350 square feet; apartment minimums vary by bedroom count6
- Private wells
- Health Department permit before construction, then final inspection and sampling7
- Owner-builder
- State licensing exemption for own use and occupancy on own property; approvals still apply8
Who to call
Zoning
Village of Millington Zoning Administrator
Village zoning approval, development review and zoning applications
P.O. Box 261, Millington, MI 48746
Building permits
SAFEbuilt (Tuscola County building department services)
Building, electrical, mechanical, plumbing, and soil-erosion permitting, inspection, and plan review, except in Tuscola Township and Arbela Township
141 S. Almer St. Caro, MI 48723
Septic permits
Tuscola County Health Department Environmental Health
Well and sewage permit applications
1309 Cleaver Road Ste B, Caro, MI 48723
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Village of Millington means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Village of Millington, MI?
Village of Millington building projects require village zoning approval before the building-permit stage, with building permits obtained through Tuscola County Building Codes.1 The village zoning permit must be presented to the county building-code authority to obtain the applicable building, electrical, plumbing and mechanical permits.9 Michigan requires a written application to the enforcing agency before construction, subject to code exemptions.10
An owner building a residential structure for the owner’s own use and occupancy on the owner’s property can qualify for Michigan’s residential-builder licensing exemption, but the exemption does not remove building permits, inspections, zoning or utility requirements.8
Who handles Village of Millington building permits and zoning approval?
Contact the Village of Millington Zoning Administrator for project-specific zoning requirements and approvals.11 Building permits then go through Tuscola County Building Codes, rather than the village zoning office.1 Tuscola County identifies SAFEbuilt as its provider for building, electrical, mechanical, plumbing and soil-erosion permitting, inspection and plan review.12
Use the county’s current SAFEbuilt contact listed below when arranging building review.12 Village zoning and site-plan fees are due at submission; ask the village office for the current fee schedule for the proposed work.13 Private sewage and well applications remain with Tuscola County Health Department Environmental Health.3
Does Village of Millington have zoning, lot-size and dwelling-size rules?
Village of Millington’s zoning ordinance regulates land uses and development throughout the village.2 New lots must have public-street frontage meeting the applicable zoning district’s minimum lot width, with a conditional frontage exception for cul-de-sac or curvilinear streets.14 We could not confirm the complete district lot-size and setback table; ask the Village Zoning Administrator for the parcel’s district requirements.
Millington’s dwelling-unit floor-area schedule specifies 350 square feet for an efficiency, 500 for a one-bedroom apartment, 700 for a two-bedroom apartment, 800 for a three-bedroom apartment and 880 for a four-bedroom apartment.6 Basements, utility rooms, breezeways, porches and attached garages are excluded from those minimum floor-area calculations.6
How do septic permits and private wells work inside Village of Millington?
Where public sewer is unavailable in Village of Millington, private sewage-system construction requires a written permit signed by the county health department sanitarian.5 A subsurface soil-absorption system cannot be permitted on a lot smaller than 12,000 square feet.5 The applicant must notify the county sanitarian for final inspection before underground portions are covered.15
Tuscola County Health Department’s fee sheet effective October 2025 lists a sewage permit at $447 and a well permit at $301; commercial fees require contacting the office.16 A private well requires a permit before construction, followed by Health Department notification for final inspection and sampling, with water clear of chlorine before sampling.7 Public sewer availability matters: Michigan requires connection to public sewer where available, otherwise to an approved private sewage system.17
Can you live in an RV or tiny home in Village of Millington?
Village of Millington prohibits using a camper, travel trailer, recreational vehicle, tent or other listed substandard structure as a dwelling unless the Planning Commission authorizes a temporary-use permit.4 The same provision covers a mobile home not installed according to the village ordinance’s requirements.4 Ask the Village Zoning Administrator about Planning Commission authorization before planning RV occupancy during construction.11
For a proposed tiny dwelling, ask the village to identify the applicable dwelling classification and district requirements; Millington publishes minimum dwelling-unit floor areas rather than a blanket tiny-home permission.6 Sewage still must go to a municipal sanitary sewer or an approved onsite septic system, so a small dwelling does not bypass sanitation approval.18
Building a home in Village of Millington: what are the steps?
- Start with the Village Zoning Administrator to establish project-specific requirements and obtain village zoning approval.111
- Confirm whether site-plan review applies: single-family and duplex residences on individual parcels and their accessory structures are exempt from that review, while applicable submissions must be complete and arrive 21 days before the Planning Commission meeting.19
- Resolve public sewer service or county health approval for a private sewage system, and obtain any private-well permit before drilling.57
- Present the approved zoning permit to Tuscola County Building Codes for the applicable construction permits.9
- Arrange required construction inspections and request a certificate of occupancy after completion; new or altered buildings cannot be occupied until the certificate is issued.2021
What should you check before buying in Village of Millington?
Confirm the village zoning district and the intended dwelling use with the Village Zoning Administrator before committing to a parcel.11 For a new lot, public-street frontage must satisfy the district minimum, subject to the ordinance’s conditional frontage exception.14 The village also lists a driveway-permit application, and driveway questions go to the Village Office or Zoning Administrator.22
Michigan’s floodplain rules prohibit new residential construction in the floodway; we could not confirm an additional village floodplain-development rule.23 Ask the village about local floodplain review before selecting a building site. For land outside village limits, use the Tuscola County guide and identify the applicable local zoning administrator before submitting a building-permit application.24
Watch-outs
- The Village of Millington site-plan exemption for single-family and duplex residences does not remove the village zoning approval required before building permits.191
- Village of Millington RV dwelling use needs Planning Commission temporary-use authorization; do not assume owning the lot authorizes occupancy.4
- Village of Millington private sewage systems require final county-sanitarian inspection before underground portions are covered.15
- We could not confirm Village of Millington agricultural exemptions or short-term-rental rules; ask the Village Zoning Administrator before relying on either use.11
Sources
- Zoning (Village of Millington), quoted and re-checked
- Zoning (Village of Millington), quoted and re-checked
- Wells and Septic, quoted and re-checked
- Sec. 36-303. Zoning of vacated areas; Table of Uses (Village of Millington), quoted and re-checked
- Sec. 34-177. Private sewage disposal (Village of Millington), quoted and re-checked
- Sec. 36-304. Schedule of regulations (Village of Millington), quoted and re-checked
- Directions When Applying for a Sewage Disposal Permit and/or Water Supply Permit (Village of Millington), quoted and re-checked
- Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
- Village of Millington Zoning Permit (Village of Millington), quoted and re-checked
- Stille-DeRossett-Hale Single State Construction Code Act, MCL 125.1510 (Michigan statewide rule), quoted and re-checked
- Village of Millington Zoning Administrator (millingtonvillage.org)
- SAFEbuilt (Tuscola County building department services) (tuscolacounty.org)
- Zoning and development review process (Village of Millington), quoted and re-checked
- Sec. 36-414. Lot frontage (Village of Millington), quoted and re-checked
- Sec. 34-177. Private sewage disposal (Village of Millington), quoted and re-checked
- tchd.us, quoted and re-checked
- Michigan Part 7 Plumbing Code Rules (Michigan statewide rule), quoted and re-checked
- Disposal of residential wastewater such as swimming pool water (Michigan statewide rule), quoted and re-checked
- Zoning and development review process (Village of Millington), quoted and re-checked
- courts.michigan.gov (Michigan statewide rule), quoted and re-checked
- Certificate of Occupancy Request (Village of Millington), quoted and re-checked
- Sec. 36-600. Parking (Village of Millington), quoted and re-checked
- Floodplains (Michigan statewide rule), quoted and re-checked
- Building Codes - Tuscola County, quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.