St. Joseph County, Michigan
Village of Colon is a village in St. Joseph County, Michigan. Village of Colon adopts its own zoning, so inside its limits Village of Colon’s rules apply, not the county’s. Septic permits inside Village of Colon come from St. Joseph County (Branch-Hillsdale-St. Joseph Community Health Agency, Environmental Health Division (St. Joseph County office) · 269-273-2161). 9 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the St. Joseph County page.
Construction of new buildings, additions and renovations inside Village of Colon limits; building permits are handled through the village building official.
zoning application with building permit: 50 USD (fee schedule line; the zoning-only application is $25)
“commencement of your project may not start until you have received your permits.”
“plumbing permit needed in order to change or add plumbing to any building within the village boundaries.”
Land inside Village of Colon limits (St. Joseph County, MI): the village administers a zoning ordinance through its zoning administrator.
“the excavation for or erection of a building or structure prior to the issuance of a zoning permit is a violation of the zoning ordinance.”
New home construction inside Village of Colon where municipal water or sewer is available.
“(water and sewer permit if such property is located where municipal water or sewer is available, approval from the municipality must be issued and submitted with application).”
Village of Colon zoning and building application fees
zoning application (no building permit required): 25 USD · zoning application (building permit required): 50 USD
“zoning application (no building permit required) $25.00 zoning application (building permit required) $50.00”
Zoning and building permit application process in Village of Colon
“a minimum of 1 copy of this completed application, along with the same number of copies of supporting documents described below, must be submitted to the zoning administrator.”
Village of Colon does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Private on-site sewage disposal (septic) inside Village of Colon, administered by the St. Joseph County health department under the county environmental health code.
“well and septic permits obtained from the st. joseph county health department, 269-273-2161.”
Septic system installation or change in use for a parcel inside Village of Colon.
“well and septic permits obtained from the st. joseph county health department, 269-273-2161.”
Private water well for a parcel inside Village of Colon, permitted by St. Joseph County health department.
“well and septic permits obtained from the st. joseph county health department, 269-273-2161.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Colon or St. Joseph County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Colon publishes no rule on the point, not that none exists. St. Joseph County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Colon means bringing your own water and power. The kit we’d start with: