James Township is a township in Saginaw County, Michigan. James Township adopts its own zoning, so inside its limits James Township’s rules apply, not the county’s. Septic permits inside James Township come from Saginaw County (Saginaw County Health Department – Environmental Health Division · 989-758-3800). 10 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Saginaw County page.
New residential construction inside James township limits
“a building permit will not be issued for new construction until the following (check list) information is provided and returned with building permit application.”
Permitted construction inside James township limits; building, electrical, mechanical and plumbing inspections by the township
“there are a number of inspections required in each of the four codes (building, electrical, mechanical, and plumbing); therefore, you must call us when you are ready for each type of inspection.”
Land inside James township limits: the township administers its own zoning ordinance (the 10 Nov. 2008 James Township Zoning Ordinance, per a third-party host, not an official township page) through its zoning board of appeals.
“the current zoning ordinance allows for one horse on 5 acres.”
Building permit process for new construction inside James township
“plans must be submitted with an application for plan examination and the appropriate fee before a permit can be issued, except as listed below.”
James Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Onsite sewage disposal for new homes inside James township limits where no public sewer is available
“(1) septic system permit: (for new house) must be issued by the saginaw county health dept.”
New home sites inside James township not served by public water and sewage disposal
permit validity: 2 years
“if you own property and are planning to build or need to replace a well or septic system at a site which is not served by a public water supply and sewage disposal system, you are required to obtain a well permit and/or a wastewater disposal permit from this office.”
Onsite septic systems installed for new homes inside James township
“make a complete inspection of the completed onsite wastewater treatment and disposal system prior to covering to ensure that the system has been properly installed”
New or replacement wells on property inside James township not served by public water
“a permit is required to install a new or replacement well on your property.”
New driveway access to a new house inside James township
“driveway permit: must be issued by the saginaw county road commission. (ph. 989-752-6140).”
Development on land inside James township that is in a regulated floodplain
“(5) (egle) fill permit: is required by the department of environment, great lakes, and energy (ph. 989 280-1632) if property is in the floodplain.”
We looked and could not find an official answer yet. Silence is not permission; ask James Township or Saginaw County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that James Township publishes no rule on the point, not that none exists. Saginaw County’s page lists the county offices to call.
Off-grid gear
Going off-grid in James Township means bringing your own water and power. The kit we’d start with: