Blumfield Township is a township in Saginaw County, Michigan. Blumfield Township adopts its own zoning, so inside its limits Blumfield Township’s rules apply, not the county’s. Septic permits inside Blumfield Township come from Saginaw County (Saginaw County Health Department – Environmental Health Division · 989-758-3800). 7 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Saginaw County page.
Land inside Blumfield township limits (Saginaw County, MI). The township administers its own zoning ordinance through a zoning administrator, zoning board of appeals and township zoning permits.
permit fee multiplier if work starts before approval: 2 x permit fee
“zoning permits are required for all building, fencing, and deck related projects, including agricultural.”
Township zoning permit applications for projects inside Blumfield township.
“all applications must include a site plan at the time of submission.”
Blumfield Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Building, electrical, mechanical and plumbing permits for work inside Blumfield township, processed by the Construction Code Group at Frankenmuth City Hall.
“building/electrical/mechanical/plumbing permits are handled by the construction code group, located at frankenmuth city hall.”
Onsite wastewater (septic) systems on land inside Blumfield township that is not served by public sewer, administered by the Saginaw County Health Department under the Saginaw County Environmental Health Code.
“onsite wastewater treatment and disposal (septic) systems and onsite water wells are covered under the saginaw county environmental health code.”
Building or replacing a septic system at a site inside Blumfield township that is not served by public water and sewage disposal.
septic permit validity: 2 years
“you are required to obtain a well permit and/or a wastewater disposal permit from this office.”
New or replacement septic systems at sites inside Blumfield township not served by public sewer.
“each site must be evaluated by a department of public health representative to accurately determine the characteristics of the soil layers which exist below the land surface and other features of the area, such as the water table level and surface drainage patterns.”
Building or replacing a water well at a site inside Blumfield township that is not served by a public water supply.
“you are required to obtain a well permit and/or a wastewater disposal permit from this office.”
We looked and could not find an official answer yet. Silence is not permission; ask Blumfield Township or Saginaw County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Blumfield Township publishes no rule on the point, not that none exists. Saginaw County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Blumfield Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.