Roscommon County, Michigan
Lake Township is a township in Roscommon County, Michigan. Lake Township adopts its own zoning, so inside its limits Lake Township’s rules apply, not the county’s. 10 rules below are quoted from official sources and independently re-checked, most recently on November 11, 2026. Rules for unincorporated land are on the Roscommon County page.
Erecting or altering structures, or starting excavation, inside Lake Township
land use permit issue time: <= 5 business days
“no structure shall be erected, altered, or excavation started until a land use permit is issued by the ordinance enforcement officer and a building permit is issued by the houghton lake building agency.”
Lake Township; state construction code enforced through the Houghton Lake Building Agency
“lake township hereby assumes responsibility for the administration and enforcement of the state construction code within the township pursuant to the act”
Use of new, changed, converted or enlarged buildings inside Lake Township
occupancy permit decision time: <= 30 days
“such occupancy permits shall be granted or denied within thirty (30) days from the date that a written application is filed with the building inspector or ordinance enforcement officer.”
Land inside Lake Township, Roscommon County, MI
“the township of lake shall be divided into zoning districts, as hereafter described”
R-2 district in Lake Township
single-family lot area, R-2: >= 7200 sq ft · two-family lot area, R-2: >= 12000 sq ft
“single-family dwellings in the r-2 district shall have a minimum lot area of 7,200 square feet. minimum lot area for two-family dwellings in the r-2 district is 12,000 square feet.”
R-1 single-family residential district in Lake Township
R-1 side yard: >= 5 ft (10 ft where abutting canal/river)
“in the r-1 district, the side yard setback for dwellings and structures, including patios, decks and sheds, shall be five (5) feet from adjacent lot lines. if the side yard abuts a canal/river, the setback shall be ten (10) feet.”
C-W, C-1 and C-2 commercial districts in Lake Township
max height with special land use permit: <= 55 ft (requires special land use permit)
“for structures in the c-w, c-1 and c-2 districts, maximum building height can be increased to fifty five (55) feet with a special land use permit.”
Structures where sanitary sewer originates inside Lake Township
“to require structures in which sanitary sewer originates and which are in the township to connect to the public sewer system”
Land use permits, building permits and certificates of occupancy in Lake Township
“as shall be determined by resolution of the township board.”
Land use permits in Lake Township
land use permit issue time after satisfactory application: <= 5 business days
“within five (5) business days, upon receipt of an application for a land use permit, which is in satisfactory form, the ordinance enforcement officer shall issue such permit”
We looked and could not find an official answer yet. Silence is not permission; ask Lake Township or Roscommon County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Lake Township publishes no rule on the point, not that none exists. Roscommon County’s page lists the county offices to call.