Case Township is a township in Presque Isle County, Michigan. Septic permits inside Case Township come from Case Township. 7 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Presque Isle County page.
Case Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New residential construction, additions and alterations inside Case township, handled by the Presque Isle County Building and Zoning Department (no township building department was located)
residential permit application plan sets: 2 sets
“1.1.2.1 residential construction. permit applications for all new residential construction, additions, and alterations, including but not limited to, rearranging of walls, enlarging windows and door openings and decks shall be submitted with two (2) sets of plans or drawings.”
Building construction inside Case township, Presque Isle County, Michigan
“no building permits shall be issued until all of the following items are submitted in accordance with pa 230, the michigan building code, and the presque isle county ordinances.”
Permitted construction inside Case township, under the Presque Isle County Building and Zoning Department
“4.1 all inspections will be conducted by inspectors licensed by the state of michigan in their skilled trade.”
Septic systems for additions with bedrooms, new single-family homes and premanufactured units inside Case township; the county building department names District Health Department #4 as the septic/well authority
“1.1.4.4 any additions that include bedrooms, new single-family homes, or premanufactured units will require well and/or septic field evaluations and permits from district health department #4 prior to any permit issuance.”
Additions with bedrooms, new single-family homes and premanufactured units inside Case township
“1.1.4.4 any additions that include bedrooms, new single-family homes, or premanufactured units will require well and/or septic field evaluations and permits from district health department #4 prior to any permit issuance.”
Well evaluations and permits for additions with bedrooms, new single-family homes and premanufactured units inside Case township
“1.1.4.4 any additions that include bedrooms, new single-family homes, or premanufactured units will require well and/or septic field evaluations and permits from district health department #4 prior to any permit issuance.”
Building permit application process for work inside Case township, through the county building department
typical plan review turnaround: <= 5 business days (typical, not a guarantee; see section 1.3 for statutory limits)
“1.1.1 a complete application for permitting will be submitted to the building department for review.”
We looked and could not find an official answer yet. Silence is not permission; ask Case Township or Presque Isle County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Case Township publishes no rule on the point, not that none exists. Presque Isle County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Case Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
← All of Presque Isle County: county rules, score and offices