Ottawa County, Michigan
Tallmadge Township is a charter township in Ottawa County, Michigan. Tallmadge Township adopts its own zoning, so inside its limits Tallmadge Township’s rules apply, not the county’s. Septic permits inside Tallmadge Township come from Ottawa County (Ottawa County Department of Public Health, Environmental Health Division · 616-396-5266). 14 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Ottawa County page.
Land in Tallmadge Charter Township subject to the Township zoning ordinance.
“The Charter Township of Tallmadge is hereby divided into the following zoning districts:”
Land governed by the Tallmadge Charter Township Zoning Ordinance.
“The location and boundaries of the zoning districts are shown on a map adopted by the Township Board.”
Each dwelling unit in Tallmadge Charter Township, except migratory housing for temporary occupancy.
one-story dwelling, two bedrooms or less: >= 960 square feet · one-story dwelling, three or more bedrooms: >= 1120 square feet · one-and-one-half-story dwelling: >= 1260 square feet (First floor must be at least 840 square feet.) · dwelling over one-and-one-half stories: >= 1400 square feet (First floor must be at least 780 square feet.)
“Each dwelling unit, except for migratory housing for temporary occupancy, shall have the following minimum floor areas:”
Building-permit applications inside Tallmadge Charter Township.
“All completed Building applications must first be turned into the Tallmadge Township office for zoning review. All other permits may be submitted directly to PCI.”
Tallmadge Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction, alterations, repairs, moves, demolition, occupancy changes, and regulated electrical, gas, mechanical, and plumbing work inside Tallmadge Charter Township.
“shall first make application to the building official and obtain the required permit.”
Single-family dwellings in the R-1 and R-2 districts in Tallmadge Charter Township.
minimum lot area: >= 22500 square feet (Single-family dwellings and non-residential uses in R-1/R-2; different standard applies if not served with public water and sewer.) · minimum lot width: >= 100 feet (Single-family dwellings and non-residential uses in R-1/R-2.) · minimum lot area without public water and sanitary sewer: >= 1 acre (All cases in R-1/R-2.)
“For single family dwellings and non-residential uses, the minimum lot area shall be twenty-two thousand five hundred (22,500) square feet, with a minimum lot width of one hundred (100) feet.”
Buildings and structures in the R-1 and R-2 districts in Tallmadge Charter Township.
front yard: >= 50 feet · side yard: >= 10 feet (A corner-lot side yard adjacent to a street must be at least 50 feet.) · rear yard: >= 50 feet
“There shall be a front yard of not less than fifty (50) feet.”
Lots and parcels in the R-1 and R-2 districts in Tallmadge Charter Township.
maximum building and structure coverage: <= 35 percent
“No more than thirty-five percent (35%) of the total land area of a lot or parcel of land shall be covered with buildings or structures.”
Buildings and structures in the R-1 and R-2 districts in Tallmadge Charter Township.
maximum height: <= 35 feet (Also may not exceed two and one-half stories; whichever is less.)
“No building or structure shall exceed two and one-half (2-1/2) stories or thirty-five (35) feet in height, whichever is less.”
Mobile homes in the R-4 Mobile Home District in Tallmadge Charter Township.
“No trailer, recreational vehicle, or dwelling other than a mobile home shall be permitted to be used as a dwelling in a mobile home park.”
New and repair on-site sewage-disposal systems inside Tallmadge Charter Township.
“Permits are required for the installation of all new and repair sewage disposal (septic) systems.”
Existing septic systems inside Tallmadge Charter Township when property ownership is transferred.
“Before transferring ownership, a septic system and/or water supply system evaluation must be done.”
New and repair on-site water wells inside Tallmadge Charter Township.
“Permits are required for the installation of all new and repair on site water wells.”
We looked and could not find an official answer yet. Silence is not permission; ask Tallmadge Township or Ottawa County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Tallmadge Township publishes no rule on the point, not that none exists. Ottawa County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Tallmadge Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.