Bolthole Index

Ottawa County, Michigan

Zoning, building permits and septic rules in Spring Lake Township, Michigan

Spring Lake Township is a township in Ottawa County, Michigan. Spring Lake Township adopts its own zoning, so inside its limits Spring Lake Township’s rules apply, not the county’s. Septic permits inside Spring Lake Township come from Ottawa County (Ottawa County Department of Public Health, Environmental Health Division · 616-396-5266). 13 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Ottawa County page.

Answers from the rulebook for Spring Lake Township

Spring Lake Township’s own rules

  • Building permitRequired

    New residences inside Spring Lake Township limits: township zoning permit (separate from the building permit)

    • Zoning permit comes from Spring Lake Township; building, electrical, mechanical and plumbing permits come from Michigan Township Services, Muskegon.
    • Construction may proceed only after the permit is issued.
    “all new homes require a zoning permit from spring lake township.”
  • Local zoningPresent (with conditions)

    Land inside Spring Lake Township limits (not the Village of Spring Lake, which is a separate municipality)

    • Township page refers to a township Zoning Ordinance with its own sections (for example section 303c and article 10 site plan review).
    • Full zoning ordinance text was not opened within the research budget; the complete-text PDF found by search returned HTTP 404 at the URL tried.
    “see section 303c of the zoning ordinance for complete information.”
  • SetbacksSpecified

    Residential and other lots inside Spring Lake Township limits (district-by-district numbers not extracted)

    • Page confirms setback requirements exist under the township zoning ordinance; numeric setbacks per district not extracted.
    • Main single-family district and any agricultural or rural-residential district values need the zoning ordinance text.
    “there will be setback requirements, height requirements, and use requirements.”
  • Building heightSpecified

    Buildings inside Spring Lake Township limits (district-by-district numbers not extracted)

    • Page confirms height requirements exist under the township zoning ordinance; numeric limits per district not extracted.
    “there will be setback requirements, height requirements, and use requirements.”
  • Mandatory utility hookupConditional

    New homes inside Spring Lake Township limits where water and sewer service is needed

    • Connection fees must be paid before the zoning permit application where water and sewer are needed.
    • Whether connection is mandatory when public water or sewer is available was not verified on an opened page.
    “if you need water and sewer, you will need to pay the connection fees prior to applying for your zoning permit.”
  • Subdividing landRegulated (with conditions)

    Land divisions, combinations and lot line adjustments inside Spring Lake Township limits

    • Township provides a land division application with a fee; the fee and review standards were not opened.
    “land divisions, combinations and lot line adjustments”
  • Short-term rentalsLimited

    Short-term rentals inside Spring Lake Township limits

    • Allowed only in the township short-term rental overlay district (overlay map linked from the township page).
    • Registration required; valid 3 years and must be renewed; township drives past the rental before approval.

    short-term rental registration fee: 100 USD (new or renewed registrations)

    “short-term rentals are only allowed in the overlay district.”
  • Permit feesPublished (with conditions)

    Township zoning permit for additions inside Spring Lake Township limits

    • Site plan and special use review: $750 fee plus $1180 escrow deposit, per the same page.
    • Accessory building, deck and fence zoning permits: $50 fee each, per the same page.
    • Building, electrical, mechanical and plumbing permit fees are set separately by Michigan Township Services, Muskegon and were not extracted.

    zoning permit fee for additions: 50 USD

    “the zoning permit fee for additions is $50.”
  • Permit processPartial

    Projects inside Spring Lake Township limits

    • Township publishes a zoning-permit step (application, site plan, fee) and states building permits are issued by Michigan Township Services, Muskegon.
    • Township page does not publish a full end-to-end sequence or the Muskegon permit application fees.
    “the basic site plan is subject to zoning administrator review.”

Rules another office applies inside Spring Lake Township

Spring Lake Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty (with conditions)

    Private septic systems inside Spring Lake Township limits, administered by Ottawa County Department of Public Health (county service area that includes the township)

    • Township page lists well and septic permits as Ottawa County permits that may be required.
    • County page says it issues well and septic permits through its online application.
    “easily apply for well & septic permits, water testing, real estate evaluations, and vacant land evaluations.”
  • Septic inspectionLimited

    Private septic systems inside Spring Lake Township limits, only at property transfer (real estate transfer evaluation)

    • Evaluation is required of sellers before transfer of ownership, under the county environmental health code, per the county page.
    • No construction-phase septic inspection was found on an opened page.
    “since 1984, the ottawa county environmental health code has required sellers to evaluate the condition of private well and septic systems before transferring property ownership.”
  • Driveway accessLimited

    Driveway access onto property inside Spring Lake Township limits (Ottawa County driveway permit)

    • Township page lists a driveway permit among Ottawa County permits that may be required, in addition to township permits.
    • Driveway standards (township or county) were not verified; the township page's driveway text was cut off in the opened page.
    “in addition to township permits, ottawa county permits may be required: soil erosion permit driveway permit well and septic permits”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Spring Lake Township or Ottawa County directly.

  • Owner-builder exemption — Owner-builder permit exemption inside Spring Lake Township limits
  • Building code adopted — Building code adopted for construction inside Spring Lake Township limits
  • Inspections — Building inspections for new homes inside Spring Lake Township limits
  • Certificate of occupancy — Certificate of occupancy for new homes inside Spring Lake Township limits
  • Zoning districts — Zoning district map and classifications inside Spring Lake Township limits
11 more unanswered
  • Minimum dwelling size
  • Minimum lot size
  • Lot coverage
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Off-grid sanitation
  • Agricultural exemption
  • Building in a floodplain

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Spring Lake Township publishes no rule on the point, not that none exists. Ottawa County’s page lists the county offices to call.

← All of Ottawa County: county rules, score and offices