Ogemaw County, Michigan
West Branch is a city in Ogemaw County, Michigan. West Branch adopts its own zoning, so inside its limits West Branch’s rules apply, not the county’s. 20 rules below are quoted from official sources and independently re-checked, most recently on November 11, 2026. Rules for unincorporated land are on the Ogemaw County page.
Building permits for construction inside West Branch city; the city's code refers to permits issued by the county building department
“A zoning permit is required prior to the issuance of a building permit.”
West Branch city
“The city adopts the most recent version of the state construction codes”
Occupancy of basements or partially completed structures inside West Branch city; certificate issued by the county per the city's code
“unless a temporary certificate of occupancy has been issued by the county”
Land inside West Branch city
“the owner thereof shall first obtain a zoning permit from the zoning administrator.”
Zoning districts in West Branch city (R-1, R-M, MU and others in Article II)
“r-1 single-family residential district r-m multiple-family district mu mixed use district o-s office service district cbd central business district g-b general business district ind industrial district”
R-1 Single-Family Residential District, West Branch city
minimum dwelling unit size: >= 1200 sq ft (planning commission may approve less) · minimum dwelling dimension: >= 24 ft
“the planning commission shall have the authority to approve principal dwelling units less than the minimum dwelling unit size or dimension. no public hearing shall be required. 1,200 sq. ft. dwelling unit dimension (min.) 24 ft.”
R-1 Single-Family Residential District, West Branch city
lot area: >= 7200 sq ft · lot width: >= 60 ft
“table 15-363 lot and structure standards lot area 7,200 sq. ft. lot width (min.) 60 ft.”
R-1 Single-Family Residential District, West Branch city
front: >= 15 ft · rear: >= 15 ft · side: >= 8 ft · side street corner: >= 15 ft
“setbacks front (min.) 15 ft. rear (min.) 15 ft. side (min.) 8 ft. side - street - corner lot (min.) 15 ft.”
R-1 Single-Family Residential District, West Branch city
max lot coverage of structures: <= 60 percent
“Lot coverage of structures (max.) 60% Setbacks Front (min.) 15 ft.”
R-1 Single-Family Residential District, West Branch city
max building height: <= 45 ft
“Building height (max.) 45 ft. Dwelling unit size (min.)”
RVs on residential lots inside West Branch city
max RV camping: <= 30 days per six months
“and at no time shall same be used for permanent living, lodging or housekeeping purposes in any zoning district.”
Overnight camping in an RV inside West Branch city
max camping: <= 30 days per six months
“Overnight camping in a recreation vehicle shall be limited to no more than 30 days in any six-month period.”
Manufactured homes on lots inside West Branch city
“each manufactured home must bear an approved HUD certification label.”
Accessory dwelling units in R-1 and MU districts, West Branch city
ADUs per lot: <= 1 unit
“one accessory dwelling unit is allowed per lot.”
Privies, septic tanks, cesspools inside West Branch city
“except as hereinafter provided, it is unlawful to construct or maintain any privy, privy vault, septic tank, cesspool or other facility intended or used for the disposal of sewage.”
Properties served by a private sewage disposal system inside West Branch city when public sewer becomes available
“a direct connection shall be made to the public sewer”
Plats and subdivisions inside West Branch city
“the proprietor shall deposit a review fee with the city clerk”
Short-term rental homes in the R-1 district, West Branch city
“Roominghouses/boardinghouses P Short-term rental homes P Commercial, Services and Retail”
Zoning permit and application fees, West Branch city
“Applications and petitions filed pursuant to the provisions of this chapter shall be accompanied by the filing fees as specified by the city council.”
Zoning permit process inside West Branch city
“On submission of an application, the city manager and zoning administrator will review the application material to determine review process”
We looked and could not find an official answer yet. Silence is not permission; ask West Branch or Ogemaw County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that West Branch publishes no rule on the point, not that none exists. Ogemaw County’s page lists the county offices to call.
Off-grid gear
Going off-grid in West Branch means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.