Zoning, building permits and septic rules in Troy, Michigan

Troy is a city in Oakland County, Michigan. Troy adopts its own zoning, so inside its limits Troy’s rules apply, not the county’s. Septic permits inside Troy come from the county and state together. 9 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Oakland County page.

Answers from the rulebook for Troy

Troy’s own rules

  • Building permitRequired

    Erection, relocation or structural alteration of a one- or two-family dwelling on an individual lot inside Troy city

    • Quoted sentence is in the site plan review exemption for one- or two-family dwellings; zoning compliance permit is also required.
    • Construction may proceed only after permit issuance.
    “however, other applicable approvals are still required such as a zoning compliance permit and building permits.”
  • Local zoningPresent (with conditions)

    All land inside Troy city limits (Oakland County, MI), administered by the city's Planning / Community Development department

    • City zoning ordinance divides the city into R-1a to R-1e one-family, RT, MF, UR, MHP, CF, EP, CB, GB, IB, OM, RC, PV and P districts plus form-based BB, MR and NN districts, per the city's guide.
    • Zoning ordinance text itself was not opened (official PDF exceeds the fetch size limit); the district list comes from the city guide dated January 2020.
    “the zoning ordinance is the law that regulates land use in the city of troy.”
  • Zoning districtsPublished

    Zoning district list for land inside Troy city

    • Guide lists R-1a to R-1e, RT, MF, UR, MHP, CF, EP, CB, GB, IB, OM, RC, PV, P, and form-based BB, MR and NN districts; the guide links an interactive zoning map on troymi.gov.
    • Guide dated January 2020; district list may have changed.
    “the city of troy is divided into the following districts:”
  • Who permits septicMixed (with conditions)

    Private on-site sewage disposal systems (septic) for structures inside Troy city not connected to public sewer

    • Chapter 19 makes the city responsible for sewer connections and defers septic compliance to state and county rules.
    • Chapter 19 names MDEQ (the state environmental agency, since renamed EGLE) and the Oakland County Health Department as the regulators.
    “unless a structure in which sanitary sewage originates is connected to a public sanitary sewer or combined sewer under the provisions of this chapter, the building sewer shall be connected with a private on-site sewage disposal system complying with the regulations and orders of the mdeq and the oakland county health department”
  • Septic inspectionRequired

    Owners of structures inside Troy city served by a private on-site septic system (not connected to public sewer)

    • Applies only while the structure is not connected to public sewer; Chapter 19 also requires septic abandonment once a direct connection to public sewer is made.
    • Inspection is performed by city staff or the Oakland County Health Department.

    inspection interval: 4 years

    “having a fixed interval inspection and evaluation performed by city staff or the oakland county health department every four (4) years”
  • Off-grid sanitationAllowed (with conditions)

    Structures inside Troy city with no public sanitary sewer connection

    • Allowed only where the system complies with state and Oakland County Health Department rules and with city building regulations (Chapter 79).
    • Public sewer connection overrides this where available.
    “unless a structure in which sanitary sewage originates is connected to a public sanitary sewer or combined sewer under the provisions of this chapter, the building sewer shall be connected with a private on-site sewage disposal system complying with the regulations and orders of the mdeq and the oakland county health department”
  • Subdividing landRegulated (with conditions)

    Subdividing land inside Troy city

    • Planning Commission recommends and City Council approves preliminary plats; the guide lists preliminary and final plat fees under Chapter 41.
    • Subdivision ordinance text itself was not opened.
    “the recommendation of approval to city council of all preliminary plats subdividing land, planned unit developments, and any amendments or alterations thereof.”
  • Permit feesPublished (with conditions)

    Planning department development application fees inside Troy city

    • Fee schedule shown in the city guide is marked effective April 1, 2009 (rev. 02/16/09); it may be superseded by the city fee schedule on troymi.gov, which was not opened.
    • Building permit fees are not in the guide.

    subdivision tentative preliminary plat application fee: 1000 USD (plus $10.00 per lot; escrow fee $1,500)

    “effective april 1, 2009 planning department fees (chapter 41) subdivision tentative preliminary plat: application fee $1,000 plus $10.00 per lot”
  • Permit processPartial

    Building permit submittals for Troy city construction

    • Guide covers planning steps (site plan, special use, rezoning) and says building permit submittals go to the Building Department; the building permit review steps are not described.
    • Chapter 79 building permit procedure not opened.
    “all submittals of building permits shall be directed to the city of troy, building department, 500 w. big beaver road, troy, mi 48084-5285.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Troy or Oakland County directly.

  • Owner-builder exemption — Owner-builder permit exemption for owner-occupied homes inside Troy city
  • Inspections — Building inspections for construction inside Troy city
  • Certificate of occupancy — Certificate of occupancy for new homes inside Troy city
  • Minimum dwelling size — Minimum dwelling size in R-1a through R-1e single-family districts inside Troy city
  • Minimum lot size — Minimum lot size in the main single-family R-1a through R-1e districts inside Troy city (no agricultural district is listed in the city guide)
14 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic permit
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Troy publishes no rule on the point, not that none exists. Oakland County’s page lists the county offices to call.