Southfield, Michigan requires building permits for construction and many alterations, and the city administers its own zoning.12 Oakland County Health Division handles septic permits, while Southfield separately requires recurring inspections of private septic systems.34 Using an RV or similar portable dwelling as a home is prohibited except in qualifying existing trailer camps or tourist-cabin enterprises.5
At a glance
- Building permits
- Required for construction and many alterations; separate trade permits may be needed1
- Zoning
- City zoning with district-specific requirements2
- Septic permits
- Oakland County Health Division; city septic inspection every 3 years34
- RV living
- Portable dwellings prohibited as homes except in qualifying existing camps5
- Minimum home size
- R A district: 1,000 square feet of usable floor area per dwelling unit6
- Minimum lot size
- R A district: 7,500 square feet and 65 feet of width7
- Owner-builder
- Homeowner can obtain a building permit; licensed contractors must obtain residential trade permits8
Who to call
Building permits
Southfield Building Department
Building permits and construction inspections inside Southfield
26000 Evergreen Road, Southfield, MI 48076
Planning & zoning
Southfield Planning Department
City zoning and planning questions
26000 Evergreen Road Southfield, MI 48076
Septic permits
Oakland County Health Division, Environmental Health Services
Septic permits and installation inspections
1200 N Telegraph Bldg. 34 East Pontiac, MI 48341
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Southfield means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Southfield, MI?
Southfield requires a building permit to construct, enlarge, alter, repair, move, demolish or change the use group of a building or structure.1 The city’s permit guidance also covers accessory buildings, decks, fences, generators, roofs, windows and other common home projects; electrical, plumbing and mechanical work may require separate trade permits.1
A Southfield homeowner may obtain a building permit without a builder’s license and perform the work personally, but subcontracted work must use licensed trades and residential trade permits must be obtained by licensed contractors.8 Southfield also requires a certificate of occupancy before building occupancy.9
Who issues building permits in Southfield, and where do you apply?
The Southfield Building Department is the city office for new construction, renovations and building expansion; call (248) 796-4100 about the proposed project.10 Southfield’s Building Department links to online building permit applications and inspection requests through BS&A Online.10
For zoning questions, contact the Southfield Planning Department at (248) 796-4150 or [email protected], at 26000 Evergreen Road Southfield, MI 48076.11 Building approval and wastewater approval have separate authorities: Oakland County Health Division issues septic permits and conducts installation inspections, including for applicable properties inside Southfield.312
Does Southfield have zoning, lot-size and home-size requirements?
Southfield has city zoning with residential and nonresidential districts, so the parcel’s district determines the applicable development rules.2 In Southfield’s R A district, required lot area is 7,500 square feet and minimum lot width is 65 feet.7 The R A district also requires 1,000 square feet of usable floor area per dwelling unit and limits lot coverage to 30%.613 Maximum building height in R A is 25 feet and 2 stories.14
These R A dimensions are district-specific rather than citywide defaults; ask the Southfield Planning Department to identify the parcel’s district and applicable setbacks before choosing a house plan.211
How do septic permits work inside Southfield?
Oakland County Health Division administers septic permits and construction inspections for onsite sewage disposal systems, while Southfield requires property owners with private septic systems to arrange inspection by a Certified Inspector every 3 years.34 If a Southfield septic system fails, the owner may connect to city sewer or repair the system under local and state guidelines.4
Oakland County requires a new septic permit application for a new system and a repair application for qualifying replacements, alterations or repairs.15 The county lists a $325 new residential septic permit fee for vacant land and $221 for residential repair or replacement.16 Follow the inspections listed on the septic permit; absent special inspections, a final inspection before covering is required.17
Can you live in an RV or tiny home on Southfield land?
Southfield prohibits using automobile trailers, tourist cabins, similar portable dwellings or tents as dwellings unless they are part of qualifying trailer camps or tourist-cabin businesses already established and operating when the ordinance took effect.5 Buying a residential parcel in Southfield therefore does not provide permission to use an RV as a home while constructing a house.5
We could not confirm a separate Southfield tiny-home occupancy rule; ask the Planning Department to review the proposed structure and use before purchase.11 A small permanent dwelling still faces Southfield’s building permit requirement and applicable zoning, including the 1,000-square-foot usable-floor-area minimum in R A.126
What are the steps for building a home in Southfield?
Southfield’s new-home process involves the Planning, Engineering, Building and Water & Sewerage departments, and the city encourages simultaneous submission of complete plans to speed review.18
- Identify the zoning district and review the proposed use and house dimensions with Southfield Planning.211
- Submit plans for the city department reviews; if wetlands or flood plains exist on the site, apply for boundary determination.18
- Obtain Oakland County septic approval when an onsite system is proposed, along with the Southfield building permit and applicable trade permits.151
- Wait for initial approvals from all city review departments before beginning building or site construction.18
- Complete final electrical, plumbing and HVAC inspections before the final building inspection, and obtain the certificate of occupancy before moving in.189
What stays with Oakland County, and what should you check before buying in Southfield?
Southfield’s city building and zoning rules apply inside city limits, while Oakland County Health Division retains the septic role for applicable Southfield properties.1212 For a parcel outside Southfield, use the Oakland County guide to understand the separate municipal planning and county health responsibilities.193
Before committing to a private well, contact Oakland County Health Division: Michigan county ordinances require a local health department well permit or notification before drilling, and the precise requirement varies by county.20 Ask Southfield Planning about wetlands and floodplain boundaries on the proposed homesite, and ask the city to confirm driveway access and any proposed accessory dwelling; we could not confirm complete Southfield rules for those uses.1811
Watch-outs
- Southfield septic inspection every 3 years is separate from Oakland County’s installation inspections; budget for both obligations when applicable.417
- An owner-builder building permit does not authorize unlicensed residential electrical, plumbing or mechanical permit applications in Southfield.8
- We could not confirm a general temporary-camping or off-grid-sanitation rule for Southfield; ask the Planning Department about the proposed use and Oakland County Health Division about wastewater approval.1121
Sources
- City of Southfield Guide to Development (Southfield), quoted and re-checked
- Code of Ordinances, Sec. 5.62. Uses permitted (Southfield), quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Sewer & Septic Systems (Southfield), quoted and re-checked
- Code of Ordinances, Sec. 5.26. Automobile trailer camp (Southfield), quoted and re-checked
- Code of Ordinances, Sec. 5.193. Residential zoning districts (Southfield), quoted and re-checked
- Code of Ordinances, Sec. 5.193. Residential zoning districts (Southfield), quoted and re-checked
- Residential Permitting Process (Southfield), quoted and re-checked
- Building Department FAQ (Southfield), quoted and re-checked
- Southfield Building Department (cityofsouthfield.com)
- Southfield Planning Department (cityofsouthfield.com)
- Oakland County Sanitary Code (Southfield), quoted and re-checked
- Code of Ordinances, Sec. 5.193. Residential zoning districts (Southfield), quoted and re-checked
- Code of Ordinances, Sec. 5.193. Residential zoning districts (Southfield), quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Onsite Sewage Disposal System (Septic) — applications and fees, quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Southfield residential construction review (cityofsouthfield.com)
- Local Community Planning & Zoning (2026 county census)
- Before you start a well drilling business (Michigan statewide rule), quoted and re-checked
- Oakland County Health Division, Environmental Health Services (oaklandcountymi.gov)
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.