Oakland County, Michigan
Royal Oak Township is a charter township in Oakland County, Michigan. Royal Oak Township adopts its own zoning, so inside its limits Royal Oak Township’s rules apply, not the county’s. 12 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Oakland County page.
Building work inside Royal Oak Charter Township.
“No work may be started before the approval of this permit.”
Building work inside Royal Oak Charter Township.
“adoption and enforcement of the most current building, electrical, plumbing and other codes”
Permitted building work inside Royal Oak Charter Township.
inspection notice: 24 hours
“24 Hour notice is required for inspections”
Commercial businesses seeking re-use or re-occupancy inside Royal Oak Charter Township.
“DO NOT OCCUPY THE BUILDING OR OPEN FOR BUSINESS UNTIL BOTH THE CERTIFICATE OF OCCUPANCY AND THE BUSINESS LICENSE HAVE BEEN ISSUED.”
Land inside Royal Oak Charter Township.
“The Planning Department is responsible for reviewing and administering Zoning Ordinance. Our department also helps residents, business owners, developers, and City officials understand the Zoning Ordinance and how it affects them.”
Detached accessory buildings inside Royal Oak Charter Township.
required or nonrequired rear-yard coverage: <= 40 percent (Detached accessory buildings) · total accessory-building coverage: <= 625 square feet (All accessory buildings relating to a principal structure)
“Detached accessory buildings may occupy up to 40 percent of any required or nonrequired rear yard, provided that the total of all accessory buildings that relate to a principal structure shall not exceed a coverage of 625 square feet.”
Detached accessory buildings in residential districts inside Royal Oak Charter Township.
maximum stories: <= 1 story (Detached accessory buildings in residential districts) · maximum height: <= 14 feet (Detached accessory buildings in residential districts)
“Detached accessory buildings in residential districts shall not exceed one story and 14 feet in height (as defined in this chapter).”
Manufactured dwellings not located in licensed mobile home parks inside Royal Oak Charter Township.
“Residential structures. Any residential structure, including manufactured dwellings not located in licensed mobile home parks, shall be erected or constructed only in compliance with the residential design standards contained in this section.”
Division or sale of zoning lots inside Royal Oak Charter Township.
“No zoning lot shall hereafter be divided into two or more zoning lots and no portion of any zoning lot shall be sold, unless all zoning lots resulting from each such division or sale conform with all regulations of the zoning district in which the property is located.”
Planning and zoning applications inside Royal Oak Charter Township.
subdivision preliminary plat review base fee: 850 USD (Plus $10 per lot plus 10% administrative fee) · residential variance request base fee: per 200 USD (Per variance plus 10% administrative fee)
“$850.00 plus $10.00 per lot plus 10% admin fee”
Royal Oak Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New residential structures in the applicable Township zoning district.
“Area and bulk regulations. A residential structure shall comply with the height, setback, and minimum floor area requirements specified for the zoning district in which the structure is located and as follows:”
Lots for new residential structures in the applicable Township zoning district.
maximum lot width created through combination or subdivision: <= 60 feet (For construction of a new residential structure)
“New residential structures shall be constructed on lots which comply with the requirements of section 32-599, schedule of regulations, for the zoning district within which they are constructed. However, in no case shall lots be combined and/or subdivided to achieve a lot width of greater than 60 feet for construction of a new residential structure.”
We looked and could not find an official answer yet. Silence is not permission; ask Royal Oak Township or Oakland County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Royal Oak Township publishes no rule on the point, not that none exists. Oakland County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Royal Oak Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.