Bolthole Index

Oakland County, Michigan

Zoning, building permits and septic rules in Independence Township, Michigan

Independence Township is a charter township in Oakland County, Michigan. Independence Township adopts its own zoning, so inside its limits Independence Township’s rules apply, not the county’s. 9 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Oakland County page.

Answers from the rulebook for Independence Township

Independence Township’s own rules

  • Building permitRequired

    Excavation, construction, structural changes or repairs, building moves, grading, topsoil stripping, and road construction inside Independence Charter Township.

    • A permit must be obtained from the Building Official before covered work begins.
    • An approved application showing compliance with the zoning ordinance, applicable ordinances, statutes, regulations, and state construction code is required.
    “It shall be unlawful for any person to commence excavation for or construction of any building or structure, to make structural changes or repairs of or in any existing building or structure, to move an existing building or structure or to engage in grading, stripping of topsoil, excavation or road construction activities without first obtaining a permit from the Building Official.”
  • InspectionsRequired

    Work authorized by a Township building permit inside Independence Charter Township.

    • The permit recipient must notify the Building Official immediately upon completion of authorized work for final inspection.
    “The recipient of any building permit for the erection, construction, alteration, repair or moving of any building, structure or part thereof, shall notify the Building Official immediately upon the completion of the work authorized by such permit, for a final inspection.”
  • Certificate of occupancyRequired

    Land, buildings, and structures for which a permit is required inside Independence Charter Township.

    • Use may not begin until the Building Official issues a certificate stating ordinance compliance.
    • Temporary certificates may be issued after inspection; they may not remain in force more than 90 days or more than five days after the building is fully completed and ready for occupancy.

    temporary certificate maximum duration: <= 90 days (Also may not remain more than five days after full completion and readiness for occupancy.)

    “certificates of temporary occupancy may be issued for a part of a building or structure prior to the occupancy of the entire building or structure, if after inspection it is found that there has been compliance with all provisions of this ordinance and all other applicable ordinances, statutes and regulations, and provided that such certificate of temporary occupancy shall not remain in force more than ninety (90) days, nor more than five (5) days after the building or structure is fully completed and ready for occupancy.”
  • Local zoningPresent (with conditions)

    Land inside Independence Charter Township.

    • District regulations and the Official Zoning Map govern use and dimensional requirements.
    “the township is hereby divided into zones or districts as shown on the official zoning map and shall include the following:”
  • Permit feesPublished (with conditions)

    Zoning and building permits, certificates of occupancy, appeals, and related Township matters.

    • The Township Board establishes the fee schedule, charges, expenses, and collection procedure.
    • The schedule is available at the Clerk's Office and Building Department.
    “The Township Board shall establish a schedule of fees, charges, and expenses, and a collection procedure, for all applications for zoning and building permits, Certificates of Occupancy, appeals, and other matters pertaining to the Zoning Ordinance.”
  • Permit processPublished (with conditions)

    Township zoning/building permit applications inside Independence Charter Township.

    • The application must be submitted and approved by the Building Official.
    • The application includes grading and building-permit applications, a written statement on Building Department forms, and a plot plan.
    “As a condition to the issuance of a building permit, and prior to undertaking any grading, stripping of topsoil, excavation, change of principal use, moving of buildings, road construction or modification by a private person or entity, and/or any construction requiring a building permit, an application shall be submitted to and approved by the Building Official in accordance with this Article.”

Rules another office applies inside Independence Township

Independence Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted (with conditions)

    State construction-code work within Independence Charter Township.

    • The Township administers and enforces the state construction code within Township boundaries.
    “The township assumes and shall be responsible for administering and enforcing the state construction code within the boundaries of the township.”
  • Building heightDistrict specific (with conditions)

    R-1A Single-Family Residential District inside Independence Charter Township.

    maximum building height: <= 35 feet (Maximum of two stories.)

    “35 feet & 2 stories maximum building height”
    One more reviewed finding on this topic
    • District specific (with conditions) — R-1R Rural Residential District inside Independence Charter Township.
      “35 feet & 2 stories maximum building height”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Independence Township or Oakland County directly.

  • Owner-builder exemption — Owner-built residential construction inside Independence Charter Township.
  • Minimum dwelling size — Single-family dwellings in Independence Charter Township residential districts.
  • Lot coverage — Residential districts inside Independence Charter Township.
  • Living in an RV — Long-term recreational-vehicle occupancy on private land inside Independence Charter Township.
  • Camping on your land — Temporary camping on private land inside Independence Charter Township.
13 more unanswered
  • Tiny homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Independence Township publishes no rule on the point, not that none exists. Oakland County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Independence Township means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Oakland County: county rules, score and offices