Huntington Woods, Michigan requires a building permit before home construction, with applications submitted to the city Building Department.12 Huntington Woods administers its own zoning in Oakland County and prohibits septic tanks and other private sewage-disposal facilities inside city limits.34 Oakland County Health Division handles the county’s onsite sewage program, but that role does not override the city prohibition.54
At a glance
- Building permits
- Apply to the city Building Department before construction12
- Zoning
- City zoning applies inside Huntington Woods3
- Septic tanks
- Construction or maintenance prohibited inside the city4
- RV occupancy
- At most 7 days, no more often than once in six months; prior public-safety permission required on residential lots6
- Minimum home size
- District-specific: 1,400 sq ft in R-1A; 1,100 sq ft in R-1E78
- Owner-builder
- Own-use residential-builder licensing exemption does not waive building permits9
Who to call
Building permits
Huntington Woods Building Department
City building-permit applications and inspection scheduling
Zoning
Huntington Woods Planning and Zoning Department
City zoning administration and development review
Septic permits
Oakland County Health Division, Environmental Health Services
County onsite sewage program; city sanitation restrictions still apply
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Huntington Woods means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Huntington Woods, MI?
Huntington Woods home construction requires a written building-permit application before work begins; Michigan law directs the application to the appropriate enforcing agency.1 In Huntington Woods, submit construction documents, building-permit applications and fees to the Building Department in City Hall.2
Huntington Woods approved building permits receive rough and final inspections, scheduled through the Building Department.10 The city issues a certificate of occupancy upon request after final inspection approval and returns the bond upon successful project completion.11 Keep inspection scheduling and the certificate request in your construction plan.1011
Who handles Huntington Woods building permits and zoning?
Contact the Huntington Woods Building Department at 248.581.2633 for inspection scheduling; building-permit applications are submitted to that department in City Hall.12 The city’s development guide directs readers to building applications and the fee schedule under City Services on the municipal website.12
For Huntington Woods zoning and development review, contact the Planning and Zoning Department at 248.581.2637.13 The city asks prospective builders to meet with the Zoning Administrator to determine whether site plan review is needed, and lists new single-family dwellings among projects requiring Planning Commission site plan review.13 Oakland County’s onsite sewage office has a separate role; city law still prohibits private sewage-disposal facilities.144
Does Huntington Woods have zoning, lot-size rules and setbacks?
Huntington Woods administers a zoning ordinance regulating land use and development inside city limits.3 The city’s one-family districts have different dimensional requirements, so identify the parcel’s district before sizing a home or dividing land.1516
In Huntington Woods R-1A, minimum lot area is 30,000 square feet and minimum lot width is 160 feet; in R-1E, the corresponding minimums are 5,000 square feet and 40 feet.1718 R-1A lists a 40-foot front setback, 20-foot least side yard, 40-foot second side yard and 60-foot rear setback, with footnotes modifying front and corner-lot requirements.19 Huntington Woods lot divisions must produce parcels conforming to city ordinances, with public-street or permanent-easement access and necessary utilities available.16
Can you live in an RV or tiny home in Huntington Woods?
Huntington Woods allows living, sleeping or housekeeping in recreational equipment only for a period of no more than 7 days, no more often than once in six months on the same property.6 On residential lots, permission from the director of public safety must be obtained before that occupancy.6 That limited exception does not support treating an RV as housing throughout a home-building project.6
Huntington Woods minimum dwelling floor area is 1,400 square feet in R-1A, 1,300 in R-1B and R-1C, 1,200 in R-1D and 1,100 in R-1E.72021228 We could not confirm a separate tiny-home or accessory-dwelling allowance; ask the city Planning and Zoning Department about the proposed dwelling and its district.
How do septic and water rules work inside Huntington Woods?
Huntington Woods prohibits constructing or maintaining a privy, privy vault, septic tank, cesspool or other facility intended or used for sewage disposal inside the city.4 A buyer should therefore not plan a Huntington Woods home around a private septic system.4 Michigan plumbing rules require public-sewer connection where available and a plumbing permit before plumbing work begins.23
Oakland County Health Division administers onsite sewage permits and inspections, but county septic approval does not remove Huntington Woods’ prohibition.144 For land outside city limits, consult the Oakland County guide for the county’s septic-permit process.24 We could not confirm a Huntington Woods-specific private-well requirement; ask Oakland County Environmental Health Services and the city about the proposed water supply.
What are the steps to build a home in Huntington Woods?
- Meet with the Huntington Woods Zoning Administrator about the parcel’s district and whether the project needs site plan review; new single-family dwellings are listed for Planning Commission review.13
- Submit construction documents, building-permit applications and fees to the Huntington Woods Building Department in City Hall; the city accepts cash, check or credit card.2
- Arrange rough and final inspections with the Building Department as construction proceeds.10
- Request the Huntington Woods certificate of occupancy after final inspection approval; the city returns the bond after successful completion.11
Michigan’s residential-builder licensing exemption covers a person erecting a home on their own property for their own use and occupancy, while building-permit, inspection and zoning requirements remain applicable.9 Huntington Woods also has a specific homeowner electrical contractor-license exemption for qualifying owner-occupied or intended-to-be-occupied single-family homes and accompanying outbuildings; that is not a general building-permit exemption.25
Watch-outs
- Huntington Woods prohibits septic tanks inside city limits even though Oakland County operates a septic-permit program.414
- Huntington Woods temporary RV occupancy on residential lots needs prior permission from the director of public safety.6
- We could not confirm Huntington Woods rules specifically allowing tiny homes, accessory dwellings or manufactured-home occupancy; ask the city Planning and Zoning Department before buying for that use.13
Sources
- Stille-DeRossett-Hale Single State Construction Code Act, MCL 125.1510 (Michigan statewide rule), quoted and re-checked
- Huntington Woods Development Guide (Huntington Woods), quoted and re-checked
- Huntington Woods Development Guide (Huntington Woods), quoted and re-checked
- library.municode.com (Huntington Woods), quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Section 42-1 - Parking and storage of recreational equipment (Huntington Woods), quoted and re-checked
- Section 40-4.03 - R-1A through R-1E: One-Family Districts (Huntington Woods), quoted and re-checked
- Section 40-4.03 - R-1A through R-1E: One-Family Districts (Huntington Woods), quoted and re-checked
- Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
- Huntington Woods Development Guide (Huntington Woods), quoted and re-checked
- Huntington Woods Development Guide (Huntington Woods), quoted and re-checked
- Huntington Woods Building Department (cms9files.revize.com)
- Huntington Woods Planning and Zoning Department (cms9files.revize.com)
- Oakland County Health Division, Environmental Health Services (oaklandcountymi.gov)
- Huntington Woods Development Guide (Huntington Woods), quoted and re-checked
- Chapter 20 - Land Divisions and Subdivisions (Huntington Woods), quoted and re-checked
- Section 40-4.03 - R-1A through R-1E: One-Family Districts (Huntington Woods), quoted and re-checked
- Section 40-4.03 - R-1A through R-1E: One-Family Districts (Huntington Woods), quoted and re-checked
- Section 40-4.03 - R-1A through R-1E: One-Family Districts (Huntington Woods), quoted and re-checked
- Section 40-4.03 - R-1A through R-1E: One-Family Districts (Huntington Woods), quoted and re-checked
- Section 40-4.03 - R-1A through R-1E: One-Family Districts (Huntington Woods), quoted and re-checked
- Section 40-4.03 - R-1A through R-1E: One-Family Districts (Huntington Woods), quoted and re-checked
- Michigan Part 7 Plumbing Code Rules (Michigan statewide rule), quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Section 6-108 - Contractor's license (Huntington Woods), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.