Hazel Park, Michigan requires a building permit before constructing a building or structure, and the city Building Department receives building applications.12 Hazel Park administers its own zoning; Oakland County Health Division handles septic permits and inspections in Oakland County, including inside Hazel Park.34
At a glance
- Building permits
- Required before construction; apply through Hazel Park Building Department12
- Zoning
- City planning and zoning processes apply inside Hazel Park3
- Application fee
- $50 for building, electrical, mechanical, plumbing, right-of-way and sign applications5
- Septic permits
- Oakland County Health Division issues septic permits and conducts inspections4
- Owner-builder
- Michigan licensing exemption for a home erected for your own use and occupancy on your own property; building permits still apply6
- Water wells
- Oakland County issues permits for private water wells; ask city planning about local well restrictions73
- Moving in
- A new or altered building needs a Certificate of Occupancy before use or occupancy8
Who to call
Building permits
Hazel Park Building Department
Building and trade applications, right-of-way and sign applications
111 East Nine Mile Rd., Hazel Park, MI 48030
Planning & zoning
Hazel Park Planning & Economic Development Department
Zoning verifications, special land use, variances, rezoning and site plan reviews
111 E. Nine Mile Rd. | Hazel Park, MI | 48030
Septic permits
Oakland County Health Division, Environmental Health Services
Onsite sewage disposal permits and inspections
1200 N Telegraph Bldg. 34 East Pontiac, MI 48341
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Hazel Park means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Hazel Park, MI?
Hazel Park requires a written building-permit application before construction of a building or structure, and a building permit when a structure’s use or occupancy changes.1 Ordinary repairs are exempt, but structural work, changes to required exits and work affecting health or safety fall outside that ordinary-repair exception.1 Hazel Park homes are subject to Michigan construction requirements, with residential provisions in the Michigan Residential Code.9
Michigan’s owner-builder licensing exemption applies when a person erects a residential structure for their own use and occupancy on their own property; the exemption does not remove building-permit, inspection or zoning requirements.6 Ask Hazel Park Building Department how to document an owner-builder application.10
Who issues building permits in Hazel Park, and what are the fees?
Hazel Park Building Department receives building, electrical, mechanical, plumbing, right-of-way and sign applications to check building and zoning compliance.2 Use the city’s application forms and include an email address or a self-addressed stamped envelope to receive your building permit copy.2
Hazel Park lists a $50 application fee for each of those application categories and a $15 contractor-registration fee, effective March 31, 2026.5 The listed $50 charge is an application fee; ask the Building Department for the complete charges for your project.5 The department’s phone number and application-page link are in the office listing below.10
Does Hazel Park have zoning, lot-size rules and setbacks?
Hazel Park administers local zoning through its Planning & Economic Development Department, which handles zoning verifications, special land use requests, variances, rezoning and site plan reviews.3 Oakland County does not control local planning and zoning for its cities, villages or townships, so Hazel Park’s planning office is the appropriate starting point for a city parcel.113
Hazel Park publishes zoning-ordinance, zoning-map and use-table resources.12 Before committing to a lot, request a zoning verification and the applicable district’s minimum lot size, dwelling size, setbacks, coverage and height limits from city planning.3 We could not confirm those dimensional standards here; have city planning check the proposed home and site plan together.13
How do septic permits work inside Hazel Park?
Oakland County Health Division’s Environmental Health Services handles septic permits and construction and final inspections for onsite systems in Oakland County, including Hazel Park.4 A new residential onsite sewage disposal system requires a new-system permit application.14 County septic applications can be submitted through the Citizen Access Portal after registering an account, or at a county office.15 Required inspections appear on the septic permit; if no special inspection is listed, the county requires a final inspection before covering the system.16
For Hazel Park premises with plumbing fixtures or drainage piping, Michigan requires connection to a public sewer where available, or otherwise an approved private sewage disposal system.17 Ask city planning and the Building Department about service availability and local connection requirements before designing a septic system.1310
Can you live in an RV or tiny home in Hazel Park?
We could not confirm permission to occupy an RV, camp on private land, install a manufactured home or occupy a tiny home in Hazel Park; ask city planning about the proposed use at the exact address before buying.13 Hazel Park’s planning office handles zoning verifications and special land use requests, while the Building Department checks building and zoning compliance on construction applications.32
For a proposed small permanent home, ask city planning to confirm the district’s dwelling-size requirements and whether an accessory dwelling is allowed.13 A new or altered building subject to Michigan’s construction code cannot be used or occupied until the code official issues a Certificate of Occupancy.8
Building a home in Hazel Park: what are the steps?
- Ask Hazel Park city planning for zoning verification and a review of the proposed use and site layout.3
- Confirm public-sewer availability with the Building Department; Michigan requires public-sewer connection where available or an approved private sewage disposal system otherwise.1017 If a septic system is proposed, contact Oakland County Environmental Health Services for the septic application.4
- Submit the written building-permit application before construction, with scaled plans and a site plan showing existing and proposed structures.18
- Coordinate required construction inspections with the enforcing agency and septic inspections with the county when applicable.1916
- Complete the required work and final approvals, and obtain the Certificate of Occupancy before moving in.8
For a parcel outside Hazel Park, use the Oakland County guide and identify the municipality responsible for local zoning.20
Watch-outs
- Hazel Park’s $50 building application fee should not be treated as a complete project price; ask the Building Department for the project’s full fee calculation.5
- We could not confirm Hazel Park’s RV-occupancy or tiny-home permissions; request a parcel-specific zoning answer from city planning before relying on either housing option.13
- Oakland County issues private-well permits, but ask Hazel Park city planning about municipal well restrictions before arranging drilling.713
- Michigan prohibits new residential construction in a regulated floodway; ask city planning and EGLE to resolve floodplain questions before planning construction or fill.21
Sources
- Building Permit Information (Hazel Park), quoted and re-checked
- Building Department (Hazel Park), quoted and re-checked
- Planning Department (Hazel Park), quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Building Department fee notice (Hazel Park), quoted and re-checked
- Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
- Well and Water Services, quoted and re-checked
- Certificate of Occupancy Request (Michigan statewide rule), quoted and re-checked
- Michigan Building Code information (Hazel Park), quoted and re-checked
- Hazel Park Building Department (hazelpark.org)
- Local Community Planning & Zoning, quoted and re-checked
- Amendments to Zoning Map (Hazel Park), quoted and re-checked
- Hazel Park Planning & Economic Development Department (hazelpark.org)
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Oakland County Health Division, Environmental Health Services (oaklandcountymi.gov)
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Michigan Part 7 Plumbing Code Rules (Michigan statewide rule), quoted and re-checked
- Stille-DeRossett-Hale Single State Construction Code Act, MCL 125.1510 (Michigan statewide rule), quoted and re-checked
- courts.michigan.gov (Michigan statewide rule), quoted and re-checked
- Local Community Planning & Zoning, quoted and re-checked
- Floodplains (Michigan statewide rule), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.