Bloomfield Hills, Michigan requires building permits for construction and changes in use or occupancy; the city’s Building Safety department enforces construction codes.12 Bloomfield Hills administers its own zoning, while Oakland County Health Division handles septic permits and inspections.34 RVs parked or stored on residential lots cannot be used for living, sleeping or housekeeping.5
At a glance
- Building permits
- Required for construction and changes in use or occupancy; contact city Building Safety12
- Zoning
- City zoning controls structure location, size, height and uses36
- Septic permits
- Oakland County Health Division issues septic permits and conducts inspections4
- RV living
- Living, sleeping and housekeeping in RVs on residential lots are prohibited5
- Owner-builder
- Michigan’s own-use licensing exemption does not waive building permits or zoning7
- Private wells
- Ask Oakland County Environmental Health about the applicable permit or notification requirement before drilling8
Who to call
Building permits
Bloomfield Hills Department of Building Safety
City construction-code enforcement; city staff connect applicants with the planning team
45 E Long Lake Road
Zoning
Bloomfield Hills Zoning / Zoning Board of Appeals
City zoning questions and zoning variances
45 E Long Lake Road
Building permits
Bloomfield Hills Building Department — Inspections
Building and trade inspection requests
45 East Long Lake Road
Septic permits
Oakland County Health Division, Environmental Health Services
Septic permits, site evaluations and septic construction inspections
1200 N Telegraph Bldg. 34 East
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Bloomfield Hills means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Bloomfield Hills, MI?
Bloomfield Hills construction requires a written building-permit application before work begins, and a change in a structure’s use or occupancy also requires a building permit.1 Ordinary repairs are exempt, but that exception excludes structural changes, changes to required egress and work affecting health or general safety, including specified wiring, piping and mechanical work.1 Michigan’s owner-builder licensing exception applies to a residential structure built on your own property for your own use and occupancy; the exception does not remove building-permit, inspection or zoning requirements.7
Who handles building permits and inspections in Bloomfield Hills?
Contact Bloomfield Hills Department of Building Safety through City Hall at 248-644-1520 for construction-code questions; the department enforces city and state codes for construction, remodeling, alteration, repair and demolition within the city.2 City staff also connect applicants with the city’s planning team.2 For building and trade inspections, call the Building Department at 248-644-1520; inspection requests must be made by 4 p.m. the business day before the requested date.9 Septic inspections are a separate responsibility of Oakland County Health Division, rather than the city building counter.4
Does Bloomfield Hills have zoning, lot-size and setback rules?
Bloomfield Hills has its own zoning ordinance controlling the location, size and height of buildings, garages and home additions, as well as what uses are allowed in different parts of the city.36 Ask the city zoning office to identify the parcel’s district and provide its current lot-size, setback, height, coverage and dwelling-size requirements; we could not confirm the complete numeric schedule.10 A zoning variance requires approval from the Bloomfield Hills Zoning Board of Appeals.10 City zoning also allows access drives in required front or side yards to reach rear yards or accessory or attached structures, but that provision does not establish a driveway-permit exemption.11
How do septic permits work inside Bloomfield Hills?
Oakland County Health Division handles septic permits for Bloomfield Hills properties, including new systems and qualifying replacement, alteration or repair work.412 A new residential septic permit on vacant land costs $325, while the residential repair permit costs $221.13 Applications can be submitted through the county’s Citizen Access Portal or at a county office; first-time portal users must register.14 Follow the inspections listed on the septic permit, and arrange the final inspection before covering the system when no special inspections are listed.15 Where municipal sewer infrastructure is absent, onsite sewage disposal remains subject to county permits and inspections.16
Can you live in an RV or tiny home in Bloomfield Hills?
Bloomfield Hills prohibits using an RV parked or stored on a residential lot for living, sleeping or housekeeping, and prohibits connecting that RV to sanitary facilities.5 RV storage generally must be inside an enclosed garage, with a driveway or rear-yard loading and unloading exception lasting no more than 24 hours.5 The city manager can issue a temporary rear-yard permit for no more than 1 week under extraordinary circumstances; that parking exception does not authorize RV occupancy.5 We could not confirm permission for tiny-home occupancy, an independent accessory dwelling or temporary camping; ask the Bloomfield Hills planning team how the proposed use would be classified before buying a structure.2
What are the steps to build a home in Bloomfield Hills?
- Ask Bloomfield Hills city staff to connect you with the planning team and confirm the parcel’s zoning and proposed home location, size and height.23
- Establish whether the property uses municipal sewer or needs onsite sewage disposal, then apply to Oakland County Health Division for the applicable septic permit if needed.1612
- Submit the written building-permit application before construction, including when building for your own use under Michigan’s licensing exemption.17
- Arrange city building inspections and county septic inspections through their respective offices, keeping the septic system uncovered for the required final inspection.915
What stays with Oakland County when buying in Bloomfield Hills?
Septic permits and septic construction inspections stay with Oakland County Health Division even though Bloomfield Hills controls its own zoning and construction-code enforcement.432 For a proposed private well, ask Oakland County Environmental Health about the applicable county permit or notification requirement before drilling; Michigan’s statewide guidance allows either requirement depending on the county ordinance.8 We could not confirm the city’s own floodplain-development procedure, so ask the city planning team before designing work near a watercourse.2 For land outside Bloomfield Hills, use the Oakland County guide to orient the county-office questions; the city’s zoning ordinance applies within Bloomfield Hills.3
Watch-outs
- Bloomfield Hills’ temporary RV parking exceptions do not allow living, sleeping or housekeeping in the RV on a residential lot.5
- We could not confirm the numeric minimum-lot-size and minimum-dwelling-size schedule; ask the Bloomfield Hills zoning office for the parcel’s district requirements.10
- Bloomfield Hills site condominium projects require city approval, while Oakland County Environmental Health also reviews proposed subdivisions and site condominiums.1718
Sources
- Building Permit Information (Bloomfield Hills), quoted and re-checked
- Bloomfield Hills Department of Building Safety (bloomfieldhills.gov)
- Zoning Ordinance (Bloomfield Hills), quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Sec. 24-243. Parking and storage of recreational vehicles in residential districts (Bloomfield Hills), quoted and re-checked
- Zoning Ordinance (Bloomfield Hills), quoted and re-checked
- Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
- Before you start a well drilling business (Michigan statewide rule), quoted and re-checked
- Bloomfield Hills Building Department — Inspections (bloomfieldhills.gov)
- Bloomfield Hills Zoning / Zoning Board of Appeals (bloomfieldhills.gov)
- Sec. 24-239. Access through yards (Bloomfield Hills), quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Onsite Sewage Disposal System (Septic) — applications and fees, quoted and re-checked
- Onsite Sewage Disposal System (Septic) — applications and fees, quoted and re-checked
- Onsite Sewage Disposal System (Septic) (Bloomfield Hills), quoted and re-checked
- Onsite Sewage Disposal System (Septic) (Bloomfield Hills), quoted and re-checked
- Sec. 24-245. Site condominium projects (Bloomfield Hills), quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.