New-home construction in the Village of Bingham Farms, Michigan requires a building-permit application under state law, subject to code exceptions.1 Bingham Farms contracts with Southfield for building services, and new-home plans need village engineering and planning review as well as Southfield Building Department approval.2 Bingham Farms has village zoning; Oakland County Health Division handles septic permits inside the village.34
At a glance
- Building permits
- State law requires an application before construction, subject to code exceptions; Southfield provides contracted building services.12
- Zoning
- Village zoning ordinance applies inside Bingham Farms.3
- New-home review
- Village engineering and planning consultants and Southfield Building Department must approve plans before construction.2
- Septic permits
- Oakland County Health Division issues septic permits and inspects installations.45
- Owner-builder
- Michigan has an own-property, own-use and occupancy licensing exemption; building and zoning requirements still apply.6
- Sewage disposal
- Buildings with plumbing fixtures must connect to available public sewer or an approved private sewage disposal system.7
Who to call
Zoning
Village of Bingham Farms Office
Guidance on exterior improvements and village engineering and planning review for new homes; coordinates with contracted Southfield building services.
24255 Thirteen Mile Road, Suite 190 Bingham Farms, MI 48025
Building permits
City of Southfield Building Department
Building services contracted by Bingham Farms; contact the department for the village project’s application and inspection route.
Septic permits
Oakland County Health Division, Environmental Health Services
Septic permit applications, soil evaluations and installation inspections inside Bingham Farms.
1200 N Telegraph Rd Bldg. 34 East Pontiac, MI 48341
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Village of Bingham Farms means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Village of Bingham Farms, MI?
Michigan law requires a written building-permit application before construction of a building or structure in Bingham Farms, except as otherwise provided in the code.1 The application includes plans, specifications, a site plan and the enforcing agency’s fee.1 Bingham Farms contracts with Southfield for building services, and most building-service permits are issued there.2 An owner building a home for personal use and occupancy on the owner’s property may qualify for Michigan’s residential-builder licensing exemption, but that exemption does not remove building-permit, inspection or zoning requirements.6
Who handles building applications in Village of Bingham Farms?
Start a Bingham Farms new-home or exterior-improvement project with the Village Office for guidance before work begins.2 New-home plans must receive approval from village engineering and planning consultants and Southfield Building Department before construction starts.2 Reach the Village Office at (248) 644-0044 and Southfield Building Department at (248) 796-4100.28 Southfield’s building page links online building-permit applications and inspection requests; ask the department how to submit a Bingham Farms project.8 For a parcel created by division or partition, the village’s required land-division approvals must precede building or occupancy permits.9
Does Village of Bingham Farms have zoning, lot-size and setback rules?
Bingham Farms has a village zoning ordinance incorporated into its code by reference.3 The village’s Planning page links the zoning ordinance and describes illustrated zoning requirements and standards.10 We could not confirm the applicable district names, minimum lot sizes, setbacks, lot coverage or minimum dwelling sizes; ask the Village Office to identify the parcel’s district and review the proposed home and site layout.102 For a divided parcel, obtain the village’s required land-division approvals before seeking building or occupancy permits; subdivision-related fees are set by Village Council resolution.911
How do septic permits work inside Village of Bingham Farms?
Oakland County Health Division handles onsite sewage disposal systems inside Bingham Farms, including septic permits and construction and final inspections.45 A new residential system requires a new septic-permit application; qualifying replacement, alteration or repair work uses a repair application.12 The published vacant-land residential septic-permit fee is $325, and the residential repair fee is $221.13 Applications can be submitted online or at county offices.14 A Health Division sanitarian must be present for the soil evaluation, and acceptable soils, water table and space are conditions for issuance.15 Follow the inspections listed on the septic permit; where no special inspections are listed, the final inspection occurs before covering the system.16
Can you live in an RV or tiny home in Village of Bingham Farms?
We could not confirm permission to occupy an RV, tiny home, manufactured home or accessory dwelling on a private Bingham Farms parcel; ask the Village Office to review the proposed use under village zoning before buying land for that purpose.32 Michigan’s sewage requirements still matter: sanitary sewage must go to municipal sanitary sewer or an onsite septic system.17 Buildings with plumbing fixtures must connect to public sewer where available, or otherwise to an approved private sewage disposal system.7 A new or altered building subject to Michigan’s construction code cannot be occupied until the code official issues a certificate of occupancy.18
Building a home in Village of Bingham Farms: what comes first?
Use this approval sequence for a proposed Bingham Farms home.
- Ask the Village Office to review the project and coordinate village engineering and planning consultant approval with Southfield Building Department approval before construction.2
- For a divided or partitioned parcel, resolve the required village land-division approvals before building or occupancy permits can issue.9
- Establish sewer availability or an approved private sewage disposal plan; apply to Oakland County Health Division if the home needs septic.74
- Submit the building-permit application and plans before construction, subject to code exceptions, and arrange required construction inspections.119
- Obtain the certificate of occupancy before using a new or altered building covered by the construction code.18
What stays with Oakland County, and what should Bingham Farms buyers check?
Septic permitting stays with Oakland County Health Division even for property inside Bingham Farms; village zoning and contracted building services follow the municipal route.432 If a private well is proposed, ask the Health Division which local well-permit or notification requirements apply before drilling under Michigan’s county-ordinance framework.20 Do not assume village utility-connection thresholds or driveway and floodplain approval procedures: we could not confirm those local details, so start with the Village Office for the parcel review.2 For land outside village limits, use the Oakland County guide for the county septic application route.14
Watch-outs
- Bingham Farms new-home plans need village consultant approval and Southfield Building Department approval before construction; contact the Village Office before starting exterior improvements.2
- Building or occupancy permits cannot issue for a divided or partitioned Bingham Farms parcel until the required village land-division approvals are in place.9
- We could not confirm private-land RV or tiny-home occupancy permission in Bingham Farms; ask the Village Office to review the specific use under village zoning.32
Sources
- Stille-DeRossett-Hale Single State Construction Code Act, MCL 125.1510 (Michigan statewide rule), quoted and re-checked
- Village of Bingham Farms Office (binghamfarms.org)
- § 157.01 ZONING ORDINANCE INCORPORATED BY REFERENCE. (Village of Bingham Farms), quoted and re-checked
- Onsite Sewage Disposal System (Septic) (Village of Bingham Farms), quoted and re-checked
- Onsite Sewage Disposal System (Septic) (Village of Bingham Farms), quoted and re-checked
- Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
- Michigan Part 7 Plumbing Code Rules (Michigan statewide rule), quoted and re-checked
- City of Southfield Building Department (cityofsouthfield.com)
- § 156.28 PERMITS AND FEES. (Village of Bingham Farms), quoted and re-checked
- Planning (Village of Bingham Farms), quoted and re-checked
- § 156.28 PERMITS AND FEES. (Village of Bingham Farms), quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Onsite Sewage Disposal System (Septic) — applications and fees, quoted and re-checked
- Onsite Sewage Disposal System (Septic) — applications and fees, quoted and re-checked
- Oakland County Health Division, Environmental Health Services (oaklandcountymi.gov)
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Disposal of residential wastewater such as swimming pool water (Michigan statewide rule), quoted and re-checked
- Certificate of Occupancy Request (Michigan statewide rule), quoted and re-checked
- MCL 125.1512, Inspection of construction (Michigan statewide rule), quoted and re-checked
- Before you start a well drilling business (Michigan statewide rule), quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.