Berkley, Michigan requires city approval before building, with inspections during construction and after completion.1 Berkley administers its own zoning ordinance; Oakland County Health Division handles septic permits where city sewer rules allow an onsite system.23 Berkley generally prohibits septic tanks and other sewage-disposal facilities except as provided in its sewer article.4
At a glance
- Building permits
- City approval required before building; apply through Community Development1
- Zoning
- Berkley zoning applies inside city limits2
- Septic permits
- Oakland County Health Division, subject to Berkley sewer restrictions35
- Sewer connection
- Required after notice for qualifying properties with public sewer within 100 feet of the property line6
- Owner-builder
- Michigan own-use licensing exemption does not waive building permits or zoning7
- Occupancy approval
- Qualifying residential projects need approved as-built drawings before final occupancy certification8
Who to call
Building permits
Berkley Community Development Department — Building
City building and trade applications, construction inspections and utility connection permits
3338 Coolidge Highway Berkley, MI 48072
Zoning
Berkley Community Development Department — Planning and Zoning
City zoning, site-plan review, rezoning and development applications
3338 Coolidge Highway Berkley, MI 48072
Septic permits
Oakland County Health Division
County onsite sewage permits and construction and final inspections where a system is allowed
1200 N Telegraph Bldg. 34 East Pontiac, MI 48341
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Berkley means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Berkley, Michigan?
Berkley requires city approval before building and requires inspections while construction is underway and after completion.1 The city also requires permits for proposed construction or other development, including manufactured-home placement, so that floodprone locations can be identified.9
Start with Berkley Community Development for the building application and ask which trade applications accompany your plans.1 Michigan’s owner-builder licensing exception applies to a residential structure erected on your own property for your own use and occupancy; the exception does not remove building-permit, inspection, code or zoning requirements.7 Homeowners applying for trade permits must also complete the city’s homeowner affidavit.1
Who handles Berkley building applications and inspections?
Berkley Community Development accepts building application packages by email and in person at City Hall, and offers online applications through BSA Online.1 Send the application package to the building office rather than the county planning office.1 City staff will contact applicants about required building-permit fees and outstanding submission items.1
Berkley requires inspections during construction and after completion, so include inspection scheduling in your project plan.1 For new residential principal buildings and qualifying additions requiring a grading plan, final occupancy certification is withheld until the building official and/or city engineer approves the as-built drawings.8 A temporary certificate, when considered appropriate, requires a $1,000 cash bond and expires after 6 months.8
Does Berkley have zoning, and what about RVs and tiny homes?
Berkley has its own zoning ordinance, and the city states that all properties and uses within Berkley are governed by that ordinance.210 The city’s interactive zoning and land-use map identifies the applicable zoning district.10 Most non-single-family residential exterior construction work requires site-plan approval.10
We could not confirm a complete answer for residential RV use, tiny-home occupancy or accessory dwelling units in Berkley; ask Community Development whether your proposed dwelling and use are allowed in the parcel’s district.210 We also could not confirm the district-specific minimum lot size, dwelling size, setbacks, coverage or height limits; request the applicable dimensional requirements before committing to a design.10
How do septic permits and sewer connections work in Berkley?
Berkley prohibits constructing or maintaining privies, septic tanks, cesspools and other sewage-disposal facilities except as provided in the city sewer article.4 Qualifying occupied or used properties abutting a street, alley or right-of-way containing a public sanitary or combined sewer must connect at the owner’s expense within 90 days after official notice when the sewer is within 100 feet of the property line.6
Where an onsite system is legally allowed, Oakland County Health Division handles septic permitting; county approval does not remove Berkley’s sewer restrictions.35 New systems need a new septic application, and qualifying replacement, alteration or repair work needs a repair application.11 Required inspections are listed on the septic permit; when no special inspections are listed, a final before-covering inspection is required.12
What are the steps to building a home in Berkley?
First, identify the parcel’s zoning district on Berkley’s interactive map and discuss the proposed home with Community Development; the city encourages conceptual meetings for new construction and renovation.10 Next, resolve sewer service: Berkley’s connection requirement and restrictions on septic systems determine which sanitation proposal can proceed.64
Then submit the building application and supporting plans to the city building office, using email, City Hall or the available online application route.1 Arrange required construction inspections through the city before seeking occupancy approval.1 For residential projects covered by the grading-plan rule, obtain approval of as-built drawings before the final certificate of occupancy.8
What should you check before buying property in Berkley?
Ask Berkley Community Development about the intended use and the district’s dimensional requirements before purchasing property for a new home, tiny home or accessory dwelling; Berkley zoning governs city properties and uses.10 Confirm the proposed water and sewer work with the building office: Berkley requires utility permits for water or sewer connections and repairs.1 Driveway replacement or change requires a city zoning certificate.1
Floodprone development proposals receive city review for flood-damage reduction, utility placement and adequate drainage.13 For a private well proposal, Michigan requires a local-health-department permit or notification under the applicable county ordinance; ask Oakland County Health Division which requirement applies.14 If your search extends outside Berkley, consult the Oakland County guide for county responsibilities; local planning and zoning remain municipal functions.15
Watch-outs
- A county septic permit does not override Berkley’s restrictions on onsite sewage systems.54
- We could not confirm permission for tiny-home or accessory-dwelling occupancy in Berkley; ask city Community Development about the parcel’s zoning district.10
- A temporary occupancy certificate for a qualifying grading-plan project expires after 6 months.8
Sources
- Berkley Community Development Department — Building (berkleymi.gov)
- Code of Ordinances, § 18-63, Compliance with zoning and building codes (Berkley), quoted and re-checked
- Oakland County Sanitary Code, Article XI (Berkley), quoted and re-checked
- Code of Ordinances, § 126-44, Privies and septic tanks (Berkley), quoted and re-checked
- Oakland County Proposed Use of Septic (Berkley), quoted and re-checked
- Code of Ordinances, § 126-66, Sewer connection required (Berkley), quoted and re-checked
- Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
- Code of Ordinances, § 26-336, Grading plan (Berkley), quoted and re-checked
- Code of Ordinances, § 26-312, Permits required (Berkley), quoted and re-checked
- Berkley Community Development Department — Planning and Zoning (berkleymi.gov)
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Code of Ordinances, § 26-312, Permits required (Berkley), quoted and re-checked
- Before you start a well drilling business (Michigan statewide rule), quoted and re-checked
- Local Community Planning & Zoning (2026 county census)
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.