Auburn Hills, Michigan requires building permits for construction and changes to buildings and building systems; Community Development handles building services and the city sets zoning.12 Oakland County Health Division handles septic permits inside Auburn Hills.3 One-family dwellings must connect to public water and sewer when available, with county-approved private facilities allowed when public systems are unavailable.4
At a glance
- Building permits
- Required for construction and changes to buildings and building systems; contact city Community Development12
- Zoning
- City zoning controls land use and building location, size and height2
- Septic permits
- Oakland County Health Division issues septic permits and inspects systems3
- Water and sewer
- Public connections required for one-family dwellings when available; otherwise county-approved private facilities4
- Small homes in R-1
- Minimum floor area per unit: 1,200 square feet; first-floor and basement conditions also apply5
- Owner-builder
- Own-property, own-use and own-occupancy licensing exemption; building permits still apply6
Who to call
Building permits
Auburn Hills Community Development / Building Services
City building services, trade building permits, inspection scheduling and zoning questions
Zoning
Auburn Hills Community Development Department
Parcel zoning identification and lot-split questions
Septic permits
Oakland County Health Division, Environmental Health Services
Septic permits and construction and final inspections inside Auburn Hills
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Auburn Hills means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Auburn Hills, MI?
Auburn Hills requires a permit for construction, alterations, repairs or changes to buildings and electrical, gas, mechanical or plumbing systems, and building work cannot begin before the city issues the permit.1 Michigan’s owner-builder licensing exemption applies when a person erects a residential structure on their own property for their own use and occupancy; the exemption does not remove building-permit, inspection or zoning requirements.6 Auburn Hills also recognizes a homeowner electrical contractor-license exception for work in an owned and occupied, or intended-to-be-occupied, single-family home and accompanying outbuildings, subject to other applicable requirements.7
Who issues building permits in Auburn Hills, and how do you apply?
Contact Auburn Hills Community Development / Building Services for city building services, online permit access and inspection scheduling through BSAonline.2 Auburn Hills says residential and commercial building permits can take 2 to 4 weeks to process, so allow for review before arranging a construction start.2 Ask Community Development for the submittal requirements for your particular home project.2 Auburn Hills requires a certificate of occupancy before any building or portion of a building is occupied; construction must meet applicable codes and all inspections must be approved before the certificate is issued.8
Does Auburn Hills have zoning, lot-size rules and setbacks?
Auburn Hills has its own zoning ordinance and map, and city zoning controls land use and building location, size and height.92 Call Community Development with the address or parcel number to identify the zoning before choosing a house plan.10 In the R-1 One Family Residential District, the schedule lists a minimum lot area of 8,400 square feet and a minimum width of 70 feet.11 Ordinary R-1 setbacks are 25 feet front, 35 feet rear, at least 5 feet on one side and 10 feet total across both sides; street-side and existing-front-yard footnotes may modify those minimums.12 New subdivisions or parcel splits without connection or access to public water and sewer require at least 43,560 square feet.13
How do septic permits and water connections work inside Auburn Hills?
Auburn Hills requires one-family dwellings to connect to public water and public sewer when available; when unavailable, private facilities need Oakland County Health Department approval.4 A septic plan therefore depends on public utility availability as well as county approval.4 Oakland County Health Division issues septic permits and conducts construction and final inspections, including for systems inside Auburn Hills.3 New residential systems need a new permit application, while qualifying replacement, alteration or repair work uses a repair application.14 Oakland County lists a new residential septic permit on vacant land at $325 and a residential repair permit at $221.15 Follow the inspections noted on the septic permit; when no special inspections are noted, the final before-covering inspection is required.16
Can you live in an RV or tiny home in Auburn Hills?
We could not confirm permission to occupy an RV as a dwelling in Auburn Hills; ask Community Development about the proposed occupancy and parcel before relying on an RV for housing.10 For a small permanent home in Auburn Hills’ R-1 district, the minimum floor area per unit is 1,200 square feet, and the first floor must be at least 850 square feet, with an additional 100 square feet required when the home has no basement.5 Those requirements are district-specific, so ask the city which district applies to the parcel.510 We also could not confirm whether a separate accessory dwelling is allowed; take that proposal to Community Development.10
What are the steps to building a home in Auburn Hills?
Start with Auburn Hills Community Development to identify the parcel’s zoning and check the proposed home against the applicable district requirements.109 Next, establish whether public water and sewer are available; a one-family dwelling must connect when available, otherwise private facilities require county health approval.4 For a septic-served project, obtain the appropriate Oakland County septic permit and arrange the inspections specified on that permit.1416 Obtain the city building permit before building work begins, then complete construction and approved inspections before obtaining the certificate of occupancy.18 For land outside Auburn Hills, consult the Oakland County guide; local planning and zoning remain municipal functions rather than county zoning approvals.17
What should you check before buying land in Auburn Hills?
For an Auburn Hills parcel, ask Community Development to identify the district and review any intended parcel split, because lot splits depend on zoning and other factors.10 Check public water and sewer availability before budgeting for private facilities, since the city’s one-family dwelling rule requires public connections when available.4 Michigan prohibits new residential construction in the floodway, and state floodplain review can apply to alterations along qualifying rivers, streams and drains.18 We could not confirm a general Auburn Hills driveway-access rule or an agricultural construction exemption; ask Community Development about access and any proposed farm building before committing to the project.2
Watch-outs
- Public water and sewer availability can rule out a private utility plan for a one-family dwelling in Auburn Hills.4
- R-1 minimum dwelling size and setbacks apply to that district; identify the parcel’s district with Auburn Hills Community Development before designing.51210
- Auburn Hills requires a certificate of occupancy before occupying a building or part of a building.8
Sources
- Community Development FAQ (Auburn Hills), quoted and re-checked
- Auburn Hills Community Development / Building Services (auburnhills.org)
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Article IV. One Family Residential Districts (Auburn Hills), quoted and re-checked
- Article XVII. Schedule of Regulations (Auburn Hills), quoted and re-checked
- Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
- Sec. 18-176. Contractor's requirements; exceptions (Auburn Hills), quoted and re-checked
- Building - Auburn Hills (Auburn Hills), quoted and re-checked
- Zoning Ordinance and Map - Auburn Hills (Auburn Hills), quoted and re-checked
- Auburn Hills Community Development Department (auburnhills.org)
- Article XVII. Schedule of Regulations (Auburn Hills), quoted and re-checked
- Article XVII. Schedule of Regulations (Auburn Hills), quoted and re-checked
- Article XVII. Schedule of Regulations (Auburn Hills), quoted and re-checked
- Proposed Use of Septic (Auburn Hills), quoted and re-checked
- Onsite Sewage Disposal System (Septic) — applications and fees, quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Local Community Planning & Zoning (2026 county census)
- Floodplains (Michigan statewide rule), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.