Muskegon County, Michigan
Village of Fruitport is a village in Muskegon County, Michigan. Village of Fruitport adopts its own zoning, so inside its limits Village of Fruitport’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Muskegon County page.
All land inside Fruitport village limits; the village administers its own Land Use Zoning Ordinance.
“village of fruitport land use zoning ordinance adopted november 18th, 2019. latest revision august 2024”
Official zoning districts for land inside Fruitport village.
“section 7.03 lot, yard and building requirements requirement r-1 r-2”
Single-family or townhouse dwelling units in the residential district table of section 7.03 inside Fruitport village.
minimum living space per single-family or townhouse unit: >= 860 sq ft (efficiency 500 sq ft; duplex 860 sq ft per dwelling)
“minimum dwelling unit living space (per unit) single family or townhouse - 860 sq. ft.”
Lots in the R-2 residential (multiple-family) district inside Fruitport village (section 7.03 table, r-2 column).
minimum lot size for first dwelling unit: >= 10000 sq ft · additional minimum lot area per dwelling unit after the first: >= 3000 sq ft (applies to each additional dwelling unit)
“minimum lot size 6,000 sq. ft. 10,000 sq. ft. for the first dwelling unit then 3,000 sq. ft. for each additional dwelling unit thereafter”
“minimum lot size 6,000 sq. ft. 10,000 sq. ft. for the first dwelling unit then 3,000 sq. ft. for each additional dwelling unit thereafter”
Residential uses on lots in the R-1 district inside Fruitport village (section 7.03 table, r-1 column).
side setback: 6 ft · rear setback: 25 ft · waterfront setback: 50 ft (measured from ordinary high-water mark)
“setbacks (residential uses) front: shall align or average with neighbors waterfront*: 50 ft. side: 6 ft. rear: 25 ft.”
“front: shall align or average with neighbors waterfront*: 50 feet side: 10 ft. rear: 20 ft.”
Buildings on lots in the R-1 district inside Fruitport village (section 7.03 table, r-1 column).
maximum building height: <= 35 ft (section 3.07 height exceptions not reviewed)
“maximum height 35 feet 35 feet min. open space for developments 15% 15%”
“maximum height 35 feet 35 feet min. open space for developments 15% 15%”
Recreational vehicles stored outdoors on residential-district lots inside Fruitport village.
occupancy of stored RV: <= 7 days (in any 90-day period)
“recreational vehicles may be stored in the rear yard. such equipment may also be occupied for up to seven (7) days in a ninety (90) day period.”
“f. no person shall use or permit the use of any temporary dwelling, camper, recreational vehicle or trailer as a principal or seasonal or short term dwelling on any site, lot, field, parcel or tract of land, except as part of a campground licensed by the michigan department of public health and/or county department of health.”
Temporary dwellings, campers and recreational vehicles used as dwellings outside a licensed campground in Fruitport village.
“f. no person shall use or permit the use of any temporary dwelling, camper, recreational vehicle or trailer as a principal or seasonal or short term dwelling on any site, lot, field, parcel or tract of land, except as part of a campground licensed by the michigan department of public health and/or county department of health.”
Manufactured homes on individual lots inside Fruitport village, outside manufactured home parks (section 3.17).
“any one-family dwelling, whether constructed and erected on a lot, or a manufactured home outside a manufactured home park, may be permitted only if it complies with all of the following requirements:”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Fruitport or Muskegon County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Fruitport publishes no rule on the point, not that none exists. Muskegon County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Fruitport means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.