Muskegon County, Michigan
Fruitland Township is a township in Muskegon County, Michigan. Fruitland Township adopts its own zoning, so inside its limits Fruitland Township’s rules apply, not the county’s. Septic permits inside Fruitland Township come from Muskegon County (Muskegon County Public Health Department – Environmental Health (Septic Permits & Evaluations) · 231-724-6208). 26 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Muskegon County page.
New construction, additions and remodels inside Fruitland township that need a township building permit.
after-the-fact permit fee: 50 USD (charged on permits pulled after the work has been done)
“every application for a building, occupancy, or use permit shall first obtain a zoning permit designating the existing or intended use of the building or occupancy or use”
Single-family dwelling work by the owner-occupant inside Fruitland township.
“all work must be done by licensed contractors whose current license are registered with fruitland township, except a single-family dwelling owner, occupant may do all their own work (a signed homeowner affidavit is required).”
Residential and other construction inside Fruitland township.
Michigan Building Code edition adopted: 2021
“fruitland township has adopted the michigan building code 2021”
Construction inside Fruitland township that has an issued building, electrical, mechanical or plumbing permit.
“all inspections are by appointment only after the appropriate permits are issued.”
Completed homes and buildings inside Fruitland township.
“a certificate of occupancy will not be issued until the home is complete and livable according to the building code.”
Land inside Fruitland township's limits: the township administers its own zoning ordinance (Articles I-XXIX, including Article IV RR, Article V LDR and others) through its zoning administrator.
“fruitland township is a zoned community. before proceeding with any building or home improvement project, property owners are advised that they need to check with fruitland township to see that they are in compliance with zoning ordinances and the building code.”
Zoning districts established by the Fruitland Township Zoning Ordinance inside the township.
“article iv – rural residential district (rr) article iva – agricultural overlay district (ag) article v – low density residential (ldr)”
Single-family dwellings in the Low Density Residential (LDR) district, Article V, inside Fruitland township.
minimum dwelling unit floor area: >= 1120 square feet gfa (960 square feet gfa on the ground floor)
“minimum dwelling unit floor area 1120 square feet gfa/ 960 square feet gfa on ground floor.”
“minimum dwelling unit floor 1,120 square feet gfa/960 square feet gfa on ground floor.”
Lots in the Low Density Residential (LDR) district, Article V, inside Fruitland township.
minimum lot area: >= 2.5 acres · minimum lot width: >= 165 feet
“minimum lot area two and a half (2 ½) acres. minimum lot width one hundred sixty-five (165) feet.”
“minimum lot area five (5) acres. minimum lot width two hundred thirty-five (235) feet.”
Principal buildings in the Rural Residential (RR) district, Article IV, inside Fruitland township.
rear yard setback: >= 50 feet · corner lot side setback facing street: >= 100 feet · front yard setback, arterial: >= 100 feet · front yard setback, residential street: >= 50 feet (or less if the average setback requirements apply)
“front yard setback one-hundred (100) feet on arterial and fifty (50) feet on residential streets or less if the average setback requirements apply.”
“one-hundred (100) feet on arterial streets on and fifty (50) feet on residential streets or less if the average setback requirements apply.”
Lots in the Low Density Residential (LDR) district, Article V, inside Fruitland township.
maximum lot coverage: <= 15 percent
“maximum building height fifty (50) feet except on lakefront lots then see general provisions (average setback lines). thirty-five (35) feet measured from the average finished grade. lot coverage fifteen (15%) percent.”
“maximum building height thirty-five (35) feet measured from the average grade. lot coverage fifteen (15%) percent.”
Principal buildings in the Rural Residential (RR) district, Article IV, inside Fruitland township.
maximum building height: <= 35 feet
“maximum building height thirty-five (35) feet measured from the average grade.”
Structures inside Fruitland township where no public sewer is available under R 10.06 through R 10.15.
“where a public sewer is not available under the provisions of section r 10.06 through section r 10.15, the building sewer shall be connected to private sewage disposal facilities complying with all requirements of the health department and mdeq.”
A structure inside Fruitland township where sewage originates, when a public sanitary sewer is available (located in a right-of-way, easement, highway, street or public way, and within 200 feet of the structure).
distance from structure to public sanitary sewer for mandatory connection: <= 200 feet (sewer must be located in a right-of-way, easement, highway, street or public way that crosses, adjoins or abuts the property)
“the owner of any structure in which sewage originates and for which there is available public sanitary sewer (a public sanitary sewer located in a right-of-way, easement, highway, street or public way, which crosses, adjoins or abuts, upon the property and passing not more than 200 feet at the nearest point from a structure in which sanitary sewage originates) is hereby required, at his or her expense, to install suitable toilet facilities therein, and to connect such facilities directly with the public sewer”
Platting of subdivisions inside Fruitland township under the township's regulatory ordinance Article R 15.
“preliminary plats shall be submitted and filed for final approval under sections 112 and 120 of the subdivision control act.”
New driveways serving each building site inside Fruitland township (zoning section 3.32).
driveway travel surface width: >= 12 feet
“all new driveways must have a travel surface of 12 foot wide constructed of gravel, concrete, asphalt, crushed limestone, crushed concrete, slag or combination of these or other materials as may be approved by the zoning administrator”
Township building, plumbing, electrical and mechanical permit fees for work inside Fruitland township.
plumbing base permit fee: 65 USD (does not include inspections) · single-family residence new construction fee: 170 USD (includes three inspections; plus $65 base fee)
“plumbing permit fees – a base fee is required at $65.00 and does not include inspections.”
Building, occupancy and use permits for land inside Fruitland township.
“every application for a building, occupancy, or use permit shall first obtain a zoning permit designating the existing or intended use of the building or occupancy or use (according to section 20.08) from the fruitland township zoning administrator.”
Fruitland Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Septic systems for new construction or new tank/drain field work on land inside Fruitland township, administered by the Muskegon County Health Department.
“septic permit and well permit – these are issued by the muskegon county health department located at 1903 marquette avenue in muskegon.”
New septic systems for new construction inside Fruitland township; also a new tank or drain field during remodel or addition work.
“septic permit if new tank or drain field is needed.”
Private water wells for new construction inside Fruitland township.
“septic permit and well permit – these are issued by the muskegon county health department located at 1903 marquette avenue in muskegon.”
We looked and could not find an official answer yet. Silence is not permission; ask Fruitland Township or Muskegon County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Fruitland Township publishes no rule on the point, not that none exists. Muskegon County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Fruitland Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.