Monroe County, Michigan
Summerfield Township is a township in Monroe County, Michigan. Summerfield Township adopts its own zoning, so inside its limits Summerfield Township’s rules apply, not the county’s. 10 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Monroe County page.
Land inside Summerfield township limits, administered by the township under its own zoning ordinance
“summerfield township is hereby divided into the following zoning districts to be known as, and have the following names and symbols”
All land inside Summerfield township limits
“summerfield township is hereby divided into the following zoning districts to be known as, and have the following names and symbols”
Single-family dwelling in the R-1 single-family rural residential district of Summerfield township
minimum floor area per dwelling unit: 1100 sq ft
“minimum floor area(d) percent lot coverage per unit (sq. ft.) per unit maximum 1100 35”
Single-family dwelling lot in the R-1 single-family rural residential district of Summerfield township
minimum lot area: >= 43560 sq ft (1 acre) · minimum lot width: >= 200 ft
“side total of side two front smallest (min) rear 1 43,560 200 2 25 80 10 25 (g) 25”
“side total of side two front smallest (min) rear.5 21,780 100 2 25 60 10 25 (g) 25”
“side total of side two front smallest (min) rear 20 871,200 400 2 25 80 (e) 25 50 50”
“side total of side two front smallest (min) rear 2.5 108,910 250 2 25 80 (e) 25 50 50”
Mobile home used as a temporary dwelling on a lot where a permanent dwelling is uninhabitable, inside Summerfield township
performance bond: 2500 USD · maximum temporary occupancy period: <= 1 year (removal date set by township board)
“a performance bond in the amount of $2,500 shall be provided to insure removal of the temporary dwelling.”
A second dwelling unit on a lot that already has one single-family dwelling, inside Summerfield township
“not more than one single-family dwelling unit shall be located on a lot”
Creation of new building sites in the AG-1 prime agricultural district of Summerfield township
“*must meet the provisions of the land division act.”
We looked and could not find an official answer yet. Silence is not permission; ask Summerfield Township or Monroe County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Summerfield Township publishes no rule on the point, not that none exists. Monroe County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Summerfield Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.