Zoning, building permits and septic rules in Village of Maybee, Michigan
Village of Maybee is a village in Monroe County, Michigan. Village of Maybee adopts its own zoning, so inside its limits Village of Maybee’s rules apply, not the county’s. 5 rules below are quoted from official sources and independently re-checked, most recently on November 3, 2026. Rules for unincorporated land are on the Monroe County page.
Answers from the rulebook for Village of Maybee
Village of Maybee’s own rules
Local zoningPresent (with conditions)
Land inside the Village of Maybee limits; the village administers its own zoning ordinance
Zoning ordinance adopted May 11, 2011 (chapters 1 through 21 listed on the village ordinances page).
Ordinance 2025-002 (zoning ordinance amendment) is listed on the village ordinances page; its text was not opened.
County identity (Monroe County) was not confirmed on an opened official page.
“village of maybee zoning ordinance adopted may 11, 2011”
Zoning districtsPublished (with conditions)
Zoning districts inside the Village of Maybee
The ordinances page lists chapter 4 (zoning districts general), chapter 5 R-1, chapter 6 R-2, chapter 7 M-F multiple family, chapter 8 O-1 office, chapter 9 C-1 local commercial, chapter 10 C-2 general commercial, chapter 11 AG agricultural, and chapter 12 L-1 light industrial.
Only the R-1 and AG chapter texts were opened; the other district chapters were not reviewed.
“ordinance#zoning- chapter4 - zoning districts - general ordinance#zoning- chapter5 - r-1 single family residential district”
Accessory dwellingsLimited
R-1 single family residential district inside Maybee village
Accessory dwelling units are a special land use only, and only within an existing building.
Requires village approval under chapter 19 (special land uses).
Detached or new-construction accessory dwellings were not found as permitted uses in the R-1 text opened.
“accessory dwelling units within an existing building (e.g., carriage house)”
Mandatory utility hookupWater and sewer (with conditions)
Improved lots in the R-1 single family residential district inside Maybee village (applies to all permitted and special land uses in that district)
Chapter 5 section 5.4 says all permitted uses and special land uses are subject to the site development requirements, including this one.
The text has no availability qualifier; it does not say the requirement applies only when public water or sewer is available.
AG district (chapter 11) cross-references chapter 13 for lot requirements and does not state a utility connection rule in the text opened.
“c. all improved lots or parcels shall be served by public water and sewer.”
Subdividing landRegulated (with conditions)
New residential subdivisions, site condominiums and residential developments in the R-1 district inside Maybee village
Requires sidewalks along the frontage of public streets in accordance with village standards; council may authorize an alternate walkway or pathway.
Plat approval and the state Land Division Act process were not reviewed; this claim covers only the zoning-ordinance sidewalk rule.
“b. new residential subdivisions, site condominiums and residential developments shall be required to install sidewalks along the frontage of all public streets, in accordance with village standards. the village council may authorize an alternate walkway or pathway, if deemed appropriate.”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask Village of Maybee or Monroe County directly.
Building permit — New construction in Maybee village
Owner-builder exemption — Owner-builder construction in Maybee village
Building code adopted — Building construction in Maybee village
Inspections — New construction in Maybee village
Certificate of occupancy — Occupancy of new homes in Maybee village
19 more unanswered
Minimum dwelling size
Minimum lot size
Setbacks
Lot coverage
Building height
Living in an RV
Camping on your land
Tiny homes
Manufactured homes
Who permits septic
Septic permit
Septic inspection
Well permit
Agricultural exemption
Driveway access
Building in a floodplain
Short-term rentals
Permit fees
Permit process
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Maybee publishes no rule on the point, not that none exists. Monroe County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Maybee means bringing your own water and power. The kit we’d start with: