Monroe County, Michigan
Ash Township is a township in Monroe County, Michigan. Ash Township adopts its own zoning, so inside its limits Ash Township’s rules apply, not the county’s. 14 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Monroe County page.
Construction inside Ash township that requires a building permit
“there will be a double permit fee assessed for all requested inspections prior to obtaining appropriate permits, and/or work done without the benefit of required permits.”
Owner-occupant doing their own work on their home in Ash township
“i hereby certify that the work described on this permit application shall be installed by myself in my home in which i am living or about to occupy.”
Construction inside Ash township, enforced by the Ash Township building department
“ash township enforces the michigan residential code 2015 and the michigan building code 2015”
Permitted construction inside Ash township
“shall not be enclosed, covered up or put into use until it has been inspected and approved by the inspector”
New or altered buildings in Ash township that are occupied after permitted work
“certificate of occupancy is a separate application.”
Land inside Ash township's limits, under the Ash Township Zoning Ordinance (Ord. No. 7C)
“zoning ordinance ord. no. 7c adopted by the ash township board on january 12, 1999”
Zoning districts inside Ash township's limits
“ag, agricultural district re, rural estates district r, residential single-family district rm, residential multi-family district mhp, manufactured home park district”
Single-family residential structures in Ash township; the schedule's floor-area notes, read with the R (single-family) district
minimum floor area, 1 story: >= 1000 square feet · minimum floor area, 1-1/2 story: >= 1150 square feet · minimum floor area, 2 story: >= 1500 square feet
“the minimum residential floor area for single-family residential structures shall be as follows: 1 story 1½ story 2 story 1,000 square feet 1,150 square feet 1,500 square feet”
R (residential single-family) district in Ash township, single-family detached and two-family dwellings
minimum lot area, no utility service: >= 20000 square feet (minimum lot width 100 ft) · minimum lot area, public water only: >= 12000 square feet (minimum lot width 80 ft) · minimum lot area, public sewer only: >= 10000 square feet (minimum lot width 80 ft) · minimum lot area, public sewer and water: >= 8750 square feet (minimum lot width 70 ft)
“minimum lot area required minimum lot width required utility service available 20,000 100 none 12,000 80 public water only 10,000 square feet 80 public sewer only 8,750 square feet 70 public sewer and water”
“if public sewer service is available, the minimum size per zoning lot (not including public road right-of-way or private road easement) shall be 32,670 square feet (3/4 acre).”
“this minimum shall be contingent on the issuance of required monroe county health department permits. if public sewer service is available, the minimum size per zoning lot (not including public road right-of-way or private road easement) shall be 1 acre.”
Campers, motor homes or travel trailers owned by nonresidents, parked on a single-family lot in Ash township
parking period: <= 4 weeks (rear yard of a single-family lot; permit required)
“a camper, motor home, or travel trailer owned by a nonresident may be parked in the rear yard of a single-family lot for a period of up to four (4) weeks provided a permit has first been secured from the building official.”
Campground use in Ash township (the zoning district that permits campgrounds was not identified)
minimum campground area: >= 20 acres
“no year-round residency shall be permitted, except within a dwelling unit as herein defined. the minimum area shall be twenty (20) acres.”
Building permits issued by the Ash Township building department
application fee: 50 USD (non-refundable; all permits) · inspection rate: 55 USD per hour (minimum one hour; outside business hours minimum two hours) · contractor registration: 35 USD per year
“all permits require a $50.00 non-refundable application fee.”
We looked and could not find an official answer yet. Silence is not permission; ask Ash Township or Monroe County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Ash Township publishes no rule on the point, not that none exists. Monroe County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Ash Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.