Village of Fowlerville, Michigan requires building permits through Livingston County, with village land-use approval before construction begins.12 Fowlerville sets its own zoning, including district-specific lot and dwelling sizes.34 Homes must connect to public water and sewer where available; private water and septic need county health approval where those services are unavailable.5
At a glance
- Building permits
- Livingston County building permit after village land-use approval12
- Zoning
- Village zoning; requirements depend on the district3
- Water and sewer
- Public connections required where available5
- Septic permits
- Livingston County Environmental Health, where public sewer is unavailable65
- Minimum home size
- R-1: 1,050 square feet; R-2: 1,000 square feet of living area47
- Minimum lot size
- R-1: 11,616 square feet; R-2: 8,712 square feet8
Who to call
Zoning
Village of Fowlerville — Zoning Administrator
Village land-use approval and zoning review before county building permitting
213 S. Grand Avenue Fowlerville, Michigan 48836
Building permits
Livingston County Building Department (LCBD)
Building permits and inspections for Fowlerville after village land-use approval
2300 E Grand River Ave, Howell, MI 48843
Septic permits
Livingston County Health Department — Environmental Health Division
Septic (on-site sewage) permits, soil evaluations and inspections for Livingston County under the Livingston County Sanitary Code
2300 E Grand River Ave Suite 102, Howell, MI 48843
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Village of Fowlerville means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Village of Fowlerville, MI?
A building permit is required before constructing a building or structure in the Village of Fowlerville, and a change of use or occupancy also requires a building permit.1 Ordinary repairs are exempt only within the limits described by Michigan’s building-permit rules; ask the Livingston County Building Department how your proposed work is classified.1
Fowlerville’s residential land-use application requires approval from the village Zoning Administrator and a Livingston County building permit before construction starts.2 Treat zoning approval and building-code review as separate steps: village approval does not replace the county building permit.2
Who handles building permits and zoning in Village of Fowlerville?
The Village of Fowlerville Zoning Administrator reviews the village land-use application, while Livingston County Building Department handles the building permit and inspections.2 The village application lists a boundary survey, proof of ownership or owner authorization, and a sketch showing the proposed use, building footprint, property-line distances and existing structures.2
Start with the village application linked above so the site layout can be reviewed before the county building application.2 Septic approval remains a separate Livingston County Environmental Health responsibility when a private system is needed; the village’s zoning approval does not substitute for county health approval.65
Does Village of Fowlerville have zoning, lot-size and setback rules?
Village of Fowlerville has its own zoning ordinance, so a parcel’s zoning district matters before choosing a house design.3 In Fowlerville’s R-1 Low Density Residential district, the minimum lot area is 11,616 square feet; in R-2 Village Core Residential, the minimum is 8,712 square feet.8 Fowlerville’s R-1 maximum lot coverage is 35%, compared with 25% in R-2.9
The minimum living area in Fowlerville’s R-1 district is 1,050 square feet, with at least 950 square feet on the ground floor for a dwelling of more than one story.4 R-2 requires 1,000 square feet of living area, with a possible 832-square-foot ground-floor minimum for dwellings of more than one story.7 Ask the village Zoning Administrator to confirm the parcel’s district and applicable setbacks before preparing the required sketch of property-line distances.2
How do septic permits and water connections work in Village of Fowlerville?
A single-family dwelling in Village of Fowlerville must connect to public sewer and water unless those services are unavailable at the location.5 Where public services are unavailable, Fowlerville requires private water and septic facilities approved by the county health department.5 That condition limits off-grid sanitation choices: private facilities are not an automatic alternative to available public service.10
Livingston County Environmental Health administers septic permitting and installation inspections inside Fowlerville.611 The county septic application requires the applicable new-construction address documentation, certified survey and legal description, plot plan and fees.12 The septic contractor must follow the permit’s inspection schedule, and changes to approved plans need Environmental Health approval before excavation or construction.13
Can you live in an RV or tiny home in Village of Fowlerville?
We could not confirm a complete private-land RV occupancy or temporary-camping answer for Village of Fowlerville; ask the village Zoning Administrator about living or sleeping in an RV before relying on that arrangement during construction.2 We also could not confirm a separate tiny-home or accessory-dwelling provision for Fowlerville; ask the same office to review the proposed dwelling and use.2
For a proposed small home in Fowlerville’s R-1 or R-2 district, the confirmed minimum living areas remain 1,050 and 1,000 square feet respectively.47 A dwelling also needs public water and sewer where available, or county-approved private facilities where unavailable.5 A small footprint alone does not answer either the district’s floor-area requirement or the dwelling’s sanitation requirement.475
What are the steps to build a home in Village of Fowlerville?
- Take the proposed use and site layout to Fowlerville’s Zoning Administrator; supply the boundary survey, ownership documentation and sketch requested by the village residential land-use application.2
- Establish whether public sewer and water are available at the Fowlerville address; where unavailable, obtain county health approval for private facilities and the applicable septic permit.512
- Obtain village land-use approval and the Livingston County building permit before starting construction in Fowlerville.2
- Arrange building inspections with Livingston County and follow Environmental Health’s septic inspection schedule where applicable.214
For a parcel outside village limits, use the Livingston County guide and identify the applicable local zoning authority; local land-use requirements vary across the county.15
Watch-outs
- Fowlerville’s public-water and sewer requirement means a plan for private utilities depends on public services being unavailable at the location.5
- We could not confirm Fowlerville-specific floodplain development requirements or an agricultural-building exemption; ask the village Zoning Administrator before committing to either project.2
Sources
- Building Permit Information (Village of Fowlerville), quoted and re-checked
- Village of Fowlerville — Zoning Administrator (fowlerville.org)
- Community Plans & Zoning (Village of Fowlerville), quoted and re-checked
- R-1 Site development requirements (Village of Fowlerville), quoted and re-checked
- Supplementary dwelling regulations (Village of Fowlerville), quoted and re-checked
- Septic Services (Village of Fowlerville), quoted and re-checked
- library.municode.com (Village of Fowlerville), quoted and re-checked
- library.municode.com (Village of Fowlerville), quoted and re-checked
- library.municode.com (Village of Fowlerville), quoted and re-checked
- Supplementary dwelling regulations (Village of Fowlerville), quoted and re-checked
- Septic Services (Village of Fowlerville), quoted and re-checked
- Septic Permits - Livingston County, MI, quoted and re-checked
- Septic Permits - Livingston County, MI, quoted and re-checked
- Livingston County Health Department — Environmental Health Division (milivcounty.gov)
- Residential Building Permits, quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.