Village of Richland, Michigan building permits go through the Kalamazoo Area Building Authority (KABA), under Michigan’s statewide permit requirement for construction subject to the code.12 The village sets zoning, while Kalamazoo County Health and Community Services handles onsite septic systems where public sewer is unavailable.34 RV occupancy on a residential lot needs a village permit and is limited to 6 weeks.5
At a glance
- Building permits
- KABA handles village building permits; code exceptions need project-specific confirmation.12
- Zoning
- Village zoning applies; the official map at Village Hall controls.3
- Septic permits
- County Health and Community Services approval before construction or replacement.46
- RV living
- Residential-lot permit: maximum 6 weeks, no more often than once in 6 months.5
- Home size
- R-1 and R-2 single-family dwellings: minimum 1,000 sq ft.78
- Lot size
- Single-family minimum lot area per dwelling: R-1, 16,500 sq ft; R-2, 13,000 sq ft.910
- Owner-builder
- Michigan’s own-use licensing exception does not waive building permits.112
Who to call
Zoning
Village of Richland Clerk / Village Hall
Village zoning questions and applications; directs building-permit applicants to KABA.
Building permits
Kalamazoo Area Building Authority (KABA)
Village building and trade permit applications and construction inspections.
2322 Nazareth Road Kalamazoo, MI 49048
Septic permits
Kalamazoo County Environmental Health Division
Onsite sewage treatment permits, inspections and installer oversight.
311 E. Alcott St.
Well permits
Kalamazoo County Environmental Health – Vacant Land Evaluations
Vacant-land evaluations for onsite water and sewage suitability.
311 E. Alcott St.
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Village of Richland means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Village of Richland, MI?
Village of Richland construction subject to Michigan’s construction code requires a building-permit application before work begins, except where the code provides an exception.2 The village contracts all building permits to KABA, so start with that authority rather than the county planning office.1 Submit the proposed scope to KABA to establish the building and trade applications your project needs.12
Michigan’s owner-builder exception concerns residential-builder licensing for a home built on your property for your own use and occupancy; the exception does not remove the separate building-permit requirement.112 A new or altered building subject to the code must receive a certificate of occupancy before use or occupancy.13
Who handles building permits in Village of Richland?
KABA is the Village of Richland building-permit contact, and the authority processes applications and inspections for its participating jurisdictions.112 Reach KABA at 269.216.9511 or [email protected]; the office is at 2322 Nazareth Road, Kalamazoo, MI 49048.12 KABA accepts applications by email and through its online forms.12
KABA bases building-permit fees on construction value, so request the applicable fee calculation for your plans.12 The permit holder must request required inspections, and KABA requires at least 24 hours’ notice for scheduling.12 For village zoning questions, contact the Village Clerk at 269-629-9903 or [email protected].1
Does Village of Richland have zoning and minimum home sizes?
Village of Richland has its own zoning ordinance, and the official zoning map at Village Hall is the final authority on a parcel’s current zoning.3 Confirm the district before designing a house: single-family dwellings in R-1 and R-2 require at least 1,000 sq ft of floor area per dwelling unit.78 Minimum lot area per single-family dwelling unit is 16,500 sq ft in R-1 and 13,000 sq ft in R-2.910
Those district-specific minimums matter for a proposed tiny house; a small footprint alone does not establish an approved dwelling use.78 Ask the Village Clerk to confirm the district, setbacks and treatment of your proposed dwelling before committing to a design.1
How do septic permits work inside Village of Richland?
Kalamazoo County Health and Community Services administers onsite sewage treatment inside Village of Richland where public sewer is unavailable.4 Obtain county approval before constructing or replacing a septic system; the department reviews the application and evaluates the site before issuing a permit.6 Installation must be by a registered company or the property owner.14
Request the county’s inspection after installation and before covering or operating the system, unless the department grants the allowed inspection waiver before coverage.15 Where a building connects to available public sewer, a sewer connection permit, paid assessments and connection charges, and available capacity are required; private septic facilities must be abandoned upon connection.16 Off-grid plumbing still must discharge to an approved onsite system or public sanitary sewer.17
Can you live in an RV or tiny home in Village of Richland?
Village of Richland prohibits RV occupancy on private property except in an authorized recreational campground or under the village’s residential-lot permit.5 Apply to the Village President or Chief of Police within 24 hours after parking; a residential-lot permit allows no more than 6 weeks and cannot be issued more often than once in 6 months for the same lot or parcel.5 The permit allows only 1 RV per address and cannot involve a charge for parking or services.5
Do not plan a long construction stay around that temporary permission.5 For a permanent small dwelling, the R-1 and R-2 single-family minimum is 1,000 sq ft; ask the village about the proposed use and KABA about construction approval.781
Building a home in Village of Richland: what comes first?
- Start at Village Hall by confirming the parcel’s official zoning district and checking the applicable dwelling and lot minimums.379
- Establish whether the home will connect to public sewer or need county septic approval before finalizing the site layout.166 County Environmental Health offers vacant-land evaluations that identify onsite water and sewage limitations, assess soils and topography, and determine depth to high groundwater.18
- Submit construction plans to KABA and arrange the required inspections through the permit holder.212
- Obtain the code official’s certificate of occupancy before using a new or altered building subject to the code.13
For land outside village limits, use the Kalamazoo County guide and confirm the appropriate local government’s zoning and building contacts.19
Watch-outs
- An RV residential-lot permit in Village of Richland is temporary: maximum 6 weeks, no more often than once in 6 months for the same parcel.5
- Before drilling a well in Village of Richland, ask Kalamazoo County Environmental Health whether the county requires a well permit or notification for your project.2018
- A driveway constructed or reconstructed within state highway right-of-way needs MDOT driveway approval in addition to applicable local building approval.21
Sources
- Village of Richland Clerk / Village Hall (villageofrichland.org)
- Stille-DeRossett-Hale Single State Construction Code Act, MCL 125.1510 (Michigan statewide rule), quoted and re-checked
- Chapter 34 Zoning (Village of Richland), quoted and re-checked
- Kalamazoo County Sanitary Code (Village of Richland), quoted and re-checked
- Chapter 16 Manufactured Homes and Recreational Vehicles (Village of Richland), quoted and re-checked
- kalcounty.gov (Village of Richland), quoted and re-checked
- Village of Richland Zoning Ordinance (Village of Richland), quoted and re-checked
- Village of Richland Zoning Ordinance (Village of Richland), quoted and re-checked
- webgen1files.revize.com (Village of Richland), quoted and re-checked
- webgen1files.revize.com (Village of Richland), quoted and re-checked
- Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
- Kalamazoo Area Building Authority (KABA) (kaba-mi.org)
- Certificate of Occupancy Request (Michigan statewide rule), quoted and re-checked
- Kalamazoo County Environmental Health Division (kalcounty.gov)
- kalcounty.gov (Village of Richland), quoted and re-checked
- ecode360.com (Village of Richland), quoted and re-checked
- Kalamazoo County Sanitary Code (Village of Richland), quoted and re-checked
- Kalamazoo County Environmental Health – Vacant Land Evaluations (kalcounty.gov)
- Zoning & Building Inspection Resources, quoted and re-checked
- Before you start a well drilling business (Michigan statewide rule), quoted and re-checked
- Infrastructure permits (Michigan statewide rule), quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.