Pavilion Township, Michigan requires a building permit for construction covered by the Michigan construction code; Associated Government Services (AGS) handles township building and zoning services.12 In Kalamazoo County, septic and new well approvals come from County Environmental Health, and those approvals must precede building approval where private systems are needed.34 Residential trailer use is time-limited, with an exception for active home construction.5
At a glance
- Building permits
- Required for construction subject to Michigan code; apply through AGS12
- Zoning
- Township zoning services through AGS2
- Septic permits
- Kalamazoo County approval before construction or replacement6
- Trailer living
- 14 days per calendar year; up to 18 months during active dwelling construction5
- Water wells
- County permit required for new wells4
- Owner-built homes
- Own-use licensing exception does not waive building permits or inspections7
Who to call
Building permits
Associated Government Services (AGS) — Pavilion Township building and zoning services
Building and trade applications, plan reviews, zoning, demolition and onsite sewer inspections for Pavilion Township
Septic permits
Kalamazoo County Environmental Health Division
Onsite sewage treatment (septic) permits, inspections and registered-installer oversight for Kalamazoo County
311 E. Alcott St., Kalamazoo, MI 49001
Well permits
Kalamazoo County Environmental Health Division – Water Well & Sewage Treatment System Evaluations
Pre-purchase vacant-land evaluations for well and septic suitability
311 E. Alcott St., Kalamazoo, MI 49001
Also useful
Kalamazoo County Drain Commissioner's Office
County drain crossing, connection and soil-erosion permits for construction projects
201 W. Kalamazoo Ave., Kalamazoo, MI 49007
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Pavilion Township means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Pavilion Township, MI?
Pavilion Township home construction covered by Michigan's construction code requires a written building-permit application before construction begins.1 Michigan requires specifications, scaled plans and a site plan showing proposed and existing structures, together with the enforcing agency's fee.1 Pavilion Township directs building applications and plan reviews to AGS, and a property address is needed before obtaining a building permit.2 An owner building a home on the owner's property for the owner's own use and occupancy may qualify for Michigan's residential-builder licensing exception, but building permits, inspections and other applicable approvals still apply.7
Who handles Pavilion Township building permits and zoning?
Pavilion Township contracts with Associated Government Services for building, mechanical, electrical, plumbing, plan reviews, code enforcement, demolition permits, zoning and onsite sewer inspections.2 Reach AGS at 269-629-0600 and use the AGS forms and information website linked by the township.8 Ask AGS for the current building and trade fees, the inspection sequence and the zoning review needed for the proposed use.2 County Environmental Health remains the septic permitting authority, so the township listing of onsite sewer inspections does not replace the county septic approval required before building construction where public sewers are unavailable.3
Does Pavilion Township have zoning, and what about lot size and setbacks?
Pavilion Township administers zoning services through AGS; the absence of countywide zoning is not an exemption from township review.29 Ask AGS to identify the parcel district and provide its permitted uses, minimum lot area, setbacks, dwelling floor area, height and coverage limits before choosing a house plan.2 We could not confirm the numeric district standards for single-family lots and homes, so obtain those requirements directly from AGS.2 Pavilion Township requires a dwelling erected or moved onto a parcel to connect to public sewer and water or to private facilities approved by the local health department.10
How do septic and well permits work inside Pavilion Township?
Kalamazoo County Environmental Health requires a septic permit before constructing or replacing an onsite sewage treatment system in Pavilion Township, with application review and a site evaluation before approval.6 Where public sewer is unavailable, county septic approval must precede a building permit for a building with plumbing or the commencement of construction.3 A new well also requires a county water-supply construction permit before building approval or construction on land needing a well.4 Request the septic inspection after installation and before covering or operating the system.11 County vacant-land evaluations assess parcel size, topography, soils and high groundwater; arrange that evaluation before committing to an undeveloped parcel.12
Can you live in an RV or tiny home in Pavilion Township?
Pavilion Township limits residential use of mobile homes, house trailers and trailer coaches outside camps with adequate water and sanitary facilities to 14 days in a calendar year.5 A resident actively constructing a dwelling on the same premises may use such accommodation for up to 18 months.5 The separate migratory-worker exception allows up to 90 days with a no-cost permit issued before use begins.5 Ask AGS how the ordinance classifies the specific RV or tiny-home design; we could not confirm a township rule specifically authorizing tiny-home occupancy or general temporary camping.2 Off-grid living still requires adequate approved sewage treatment.13
Building a home in Pavilion Township: what are the steps?
- Contact AGS for parcel zoning review, building forms and the property-address requirement before applying for a building permit.2
- Arrange County Environmental Health site evaluation and obtain the septic and well approvals needed before building approval or construction.1234
- Submit the building application, scaled plans, site plan and applicable fee to the enforcing agency.1
- Coordinate construction inspections with AGS; Michigan requires periodic inspections of work performed under a building permit.214
- Complete required approvals and obtain a certificate of occupancy before occupying a new or altered building subject to Michigan code.15
What stays with Kalamazoo County when buying in Pavilion Township?
County Environmental Health evaluates vacant land for private water and sewage suitability, including soil conditions and depth to high groundwater; the evaluation requires an excavation with Environmental Health present.12 A site subject to flooding or within the 100-year floodplain may be denied a septic permit.16 Projects crossing, modifying or discharging into a county drain need Drain Commissioner approval, and soil erosion approval may also be needed.17 Land divisions using private water or septic systems also receive County Environmental Health review.18 For a parcel outside Pavilion Township, consult the Kalamazoo County guide and the appropriate local government for building and zoning jurisdiction.19
Watch-outs
- The 18-month trailer exception requires a resident to be actively constructing a dwelling on the premises; buying vacant land alone does not satisfy that condition.5
- We could not confirm township building-fee amounts or numerical residential lot and setback standards; request those from AGS before finalizing the project budget and layout.2
- AGS onsite sewer inspections do not substitute for County Environmental Health septic permitting.3
Sources
- Stille-DeRossett-Hale Single State Construction Code Act, MCL 125.1510 (Michigan statewide rule), quoted and re-checked
- Building Permits -Plumbing | Pavilion Township (Pavilion Township), quoted and re-checked
- Kalamazoo County Sanitary Code (Pavilion Township), quoted and re-checked
- Kalamazoo County Sanitary Code, Article III - Water Supply Regulations (Pavilion Township), quoted and re-checked
- Pavilion Township Code, Section 200.610 - Use of temporary mobile homes (Pavilion Township), quoted and re-checked
- Kalamazoo County Sanitary Code (Pavilion Township), quoted and re-checked
- Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
- Associated Government Services (AGS) — Pavilion Township building and zoning services (paviliontwpmi.gov)
- Zoning & Building Inspection Resources | Kalamazoo County, MI, quoted and re-checked
- Pavilion Township Code, Section 200.501 - Dwelling unit construction (Pavilion Township), quoted and re-checked
- kalcounty.gov (Pavilion Township), quoted and re-checked
- Kalamazoo County Environmental Health Division – Water Well & Sewage Treatment System Evaluations (kalcounty.gov)
- Pavilion Township Code, Section 200.501 - Dwelling unit construction (Pavilion Township), quoted and re-checked
- MCL 125.1512, Inspection of construction (Michigan statewide rule), quoted and re-checked
- Certificate of Occupancy Request (Michigan statewide rule), quoted and re-checked
- Kalamazoo County Sanitary Code, Section 6.08 (Pavilion Township), quoted and re-checked
- Kalamazoo County Drain Commissioner's Office (kalcounty.gov)
- Sewage Treatment | Kalamazoo County, MI, quoted and re-checked
- Zoning & Building Inspection Resources, quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.