Building permits, zoning and septic rules in Parchment, Michigan

Parchment, Michigan requires building permits for construction covered by Michigan’s construction code, with applications handled by Kalamazoo Area Building Authority (KABA).12 Parchment sets its own zoning in Kalamazoo County; county Environmental Health handles septic permits where municipal wastewater service is unavailable.34 A Parchment dwelling must connect to public sewer and water or health-department-approved private facilities.5

At a glance

Building permits
Required for construction subject to Michigan code; apply through KABA12
Zoning
Parchment’s own zoning ordinance applies inside city limits3
Septic permits
County Environmental Health; required before onsite system installation6
Water and sewer
Public connections or private facilities approved by the local health department5
Owner building
Personal construction allowed subject to state codes and county health rules7
Lot size
District requirements apply; an existing-lot exception may apply8

Who to call

Building permits

Kalamazoo Area Building Authority (KABA)

Building, mechanical, plumbing and electrical permits for Parchment

269-216-9511

2322 Nazareth Road, Kalamazoo MI

Zoning

Parchment City Manager — Development Review

City development review and conceptual review meetings

269-492-3263

Roads & driveways

Parchment City Hall

City contact for zoning questions and driveway-permit routing

269-349-3785

650 S. Riverview Drive Parchment, MI 49004

Septic permits

Kalamazoo County Environmental Health Division

Onsite sewage treatment permits and installation requirements

269-373-5200

311 E. Alcott St. Kalamazoo, MI 49001

Well permits

Kalamazoo County Environmental Health — Vacant Land Evaluations

Vacant-land evaluation for onsite water and sewage suitability

269-373-5200

311 E. Alcott St. Kalamazoo, MI 49001

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Parchment means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Parchment, MI?

Parchment construction subject to Michigan’s construction code requires a building-permit application before work begins, submitted to the appropriate enforcing agency.1 KABA is Parchment’s building authority and handles building, mechanical, plumbing and electrical permits; contact KABA for pricing.2

Parchment also ties temporary buildings to a valid building permit for a permanent building or new land use on the same site.9 That temporary-building condition does not establish a general exemption for permanent homes.9 Ask KABA which building and trade applications your proposed home, addition or alteration needs before ordering materials.

Who handles Parchment building permits and zoning review?

For Parchment building and trade permits, contact KABA at 269-216-9511 or its office at 2322 Nazareth Road, Kalamazoo MI.2 For development review, Parchment’s City Manager is the city contact at 269-492-3263.10 Parchment offers free conceptual review meetings during Planning Commission meetings; request one through the City Manager.10

Bring the proposed use and a sketch of the lot to that discussion, and ask which city zoning approvals must precede the KABA application. Parchment’s zoning ordinance governs buildings, structures, land and uses inside city limits.3 Septic approval remains a separate county Environmental Health responsibility where municipal wastewater service is unavailable.4

Does Parchment have zoning and minimum lot sizes?

Parchment has its own zoning ordinance, and buildings and land uses inside the city must conform to that ordinance.3 Parchment lot-area and width requirements depend on the applicable zoning district; the ordinance recognizes an exception for existing lots of record, with conditions for permitted principal uses and special lot-area requirements for conditional uses.8

Ask Parchment City Hall to identify the parcel’s district and confirm the applicable lot width, setbacks, home size and permitted uses before buying. Do not assume an undersized existing lot qualifies for every proposed use: Parchment’s existing-lot provision distinguishes principal uses from conditional uses with special lot-area requirements.8

How do septic permits and water approval work in Parchment?

Parchment requires a dwelling to connect to public sewer and water supply or to private facilities approved by the local health department.5 Where municipal wastewater service is unavailable, Kalamazoo County requires an onsite sewage permit before installation, with installation by a registered company or the property owner.6

For a Parchment lot proposed for private facilities, ask county Environmental Health for a vacant-land evaluation before committing to a house location. The county evaluation assesses parcel size, topography, soils and depth to high groundwater to identify limitations for onsite water and sewage systems.11 Private sanitation in Parchment requires health-department approval; a plan to live off grid does not remove that condition.12

Can you live in an RV or tiny home in Parchment?

We could not confirm permission for private-property RV occupancy, tiny-home occupancy or an accessory dwelling in Parchment; ask City Hall for a written answer for the proposed parcel and use. Parchment’s prohibition on camping and camping equipment applies to city parks and does not establish the rule for camping on a private lot.13

A temporary building in Parchment requires a valid building permit for a permanent building or new use on the same site; that provision does not itself authorize living in an RV while building.9 A dwelling in Parchment must also meet the public-utility or approved-private-facility requirement.5 Ask separately about residential occupancy, duration, sanitation and final occupancy approval.

Building a home in Parchment: what are the steps?

  1. Ask Parchment City Hall to confirm the lot’s zoning district, proposed use and existing-lot status; city zoning and district lot requirements apply.38
  2. Confirm public water and sewer availability, or seek health-department approval for private facilities before settling the site plan.5
  3. Submit the building-permit application to KABA before construction, and ask KABA which trade applications and inspection stages apply.12
  4. Arrange required inspections during permitted construction and obtain the certificate of occupancy before using a new or altered building subject to the code.1415

Parchment allows personal construction work subject to state electrical and plumbing codes and county health requirements.7 Michigan’s own-use, own-occupancy residential-builder licensing exception does not eliminate building-permit requirements.16

What should you check before buying land in Parchment?

Start with the intended use: Parchment’s zoning ordinance applies inside city limits, including to new uses of land and buildings.3 Ask City Hall about driveway access, floodplain review and district dimensions, and ask KABA for current building-permit fees. KABA’s pricing comes through its office.2 We could not confirm Parchment’s full floodplain development standards or a city-specific tiny-home approval rule; request parcel-specific answers before making either central to your purchase.

For land outside Parchment, use the Kalamazoo County guide: the absence of countywide zoning does not remove locally administered zoning or other applicable requirements.17 For a Parchment parcel needing private water or sewage, request county Environmental Health’s vacant-land evaluation.11

Watch-outs

  • Parchment’s city-park camping ban does not answer whether an RV can be occupied on private land; ask City Hall about the proposed use.13
  • Parchment’s permission to do your own construction work still requires compliance with state electrical and plumbing codes and county health regulations.7
  • Do not occupy a new or altered Parchment building subject to Michigan’s construction code before the code official issues a certificate of occupancy.15

Sources

  1. Stille-DeRossett-Hale Single State Construction Code Act, MCL 125.1510 (Michigan statewide rule), quoted and re-checked
  2. Kalamazoo Area Building Authority (KABA) (parchment.org)
  3. Appendix A - Zoning, Article 12, Section 12.2 - Building regulations (Parchment), quoted and re-checked
  4. Sewage Treatment | Kalamazoo County, MI, quoted and re-checked
  5. library.municode.com (Parchment), quoted and re-checked
  6. Sewage Treatment | Kalamazoo County, MI, quoted and re-checked
  7. Appendix A - Zoning, Article 12, Section 12.3 - Building appearance, structure completion, and personal construction authority (Parchment), quoted and re-checked
  8. Appendix A - Zoning, Article 14, Section 14.5 - Lot area (Parchment), quoted and re-checked
  9. Appendix A - Zoning, Article 12, Section 12.2 - Building regulations (Parchment), quoted and re-checked
  10. Parchment City Manager — Development Review (parchment.org)
  11. Kalamazoo County Environmental Health — Vacant Land Evaluations (kalcounty.gov)
  12. library.municode.com (Parchment), quoted and re-checked
  13. Chapter 42, Article IV, Section 42-151 - City parks regulations (Parchment), quoted and re-checked
  14. MCL 125.1512, Inspection of construction (Michigan statewide rule), quoted and re-checked
  15. Certificate of Occupancy Request (Michigan statewide rule), quoted and re-checked
  16. Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
  17. Zoning & Building Inspection Resources | Kalamazoo County, MI, quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Parchment

Parchment’s own rules

  • Building permitLimited

    Temporary buildings and structures inside Parchment city.

    • A valid building permit for a permanent building or new use on the same site is required before a temporary building may be erected.
    • The temporary building must be removed within 30 days after issuance of a certificate of occupancy.
    • Approval may not exceed one year, subject to extensions described in the ordinance.
    “No temporary building shall be erected unless a valid building permit exists for a permanent building or a new use of land on the same site.”
  • Owner-builder exemptionAvailable (with conditions)

    An owner, tenant, occupant, or land contract vendee performing their own building, alteration, plumbing, or electrical work inside Parchment city.

    • The work remains subject to the minimum requirements of the Michigan Electrical and Plumbing Codes.
    • Applicable County Health Department regulations must be complied with.
    “Nothing in this Ordinance shall be construed as prohibiting an owner, tenant, occupant, or land contract vendee from doing his or her own building, altering, plumbing, electrical installations, etc., provided the minimum requirements of the Electrical and Plumbing Codes of the State of Michigan, and the applicable County Health Department regulations are complied with.”
  • Local zoningPresent

    Land inside Parchment city limits; the city has an adopted Appendix A - Zoning ordinance administered through city zoning officials and the zoning board of appeals.

    • The ordinance applies to buildings, structures, lots, land, and uses within the city.
    • Dimensional variances may be authorized by the zoning board of appeals under Section 18.6.
    “No building or structure, or part thereof, shall hereafter be erected, constructed, used, reconstructed, altered or maintained, and no lot or land, or part thereof, shall hereafter be used or maintained and no new use made of any building, structure or land, or part thereof, except in conformity with the provisions of this Ordinance.”
  • Minimum lot sizeSpecified

    Lots inside Parchment city, subject to the lot area and width requirements of the applicable zoning district.

    • Section 14.5 recognizes existing lots of record on the ordinance's effective date even when they do not comply with lot area and width requirements.
    • The opened material did not provide the district schedule's numeric lot-area and width figures.
    “Any lot existing and of record on the effective date of this Ordinance may be used for any principal use permitted in the district which such lot is located, other than conditional uses for which special lot area requirements are specified in this Ordinance, whether or not such lot complies with the lot area and width requirements of this Ordinance.”
  • Camping on your landProhibited

    Camping and camping equipment in Parchment city parks.

    • The cited prohibition is limited to city parks and does not establish a citywide private-property camping rule.
    “No person shall camp or erect or use any camping equipment.”
  • Off-grid sanitationLimited

    Private sanitation facilities serving a dwelling inside Parchment city.

    • Private facilities may be used only if approved by the local health department.
    “Be connected to a public sewer and water supply or to such private facilities approved by the local health department;”
  • Mandatory utility hookupWater and sewer (with conditions)

    A dwelling erected inside Parchment city.

    • The dwelling must be connected to public sewer and water supply, or to private facilities approved by the local health department.
    “Be connected to a public sewer and water supply or to such private facilities approved by the local health department;”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Parchment or Kalamazoo County directly.

  • Inspections — Building inspections for construction inside Parchment city.
  • Tiny homes — Tiny-home occupancy on private land inside Parchment city.
  • Accessory dwellings — Accessory dwelling units inside Parchment city.
  • Who permits septic — Septic regulation and administration for land inside Parchment city.
  • Septic permit — Septic permits for land inside Parchment city.
8 more unanswered
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Parchment publishes no rule on the point, not that none exists. Kalamazoo County’s page lists the county offices to call.

← All of Kalamazoo County: county rules, score and offices