Iron County, Michigan
Bates Township is a township in Iron County, Michigan. Bates Township adopts its own zoning, so inside its limits Bates Township’s rules apply, not the county’s. Septic permits inside Bates Township come from Bates Township. 23 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Iron County page.
Inspections of new buildings inside Bates township under the township zoning ordinance
“the erection of every building or structure may be subject to inspections”
Land inside Bates township's unincorporated portions: Bates Township adopts and administers its own zoning ordinance (Ordinance No. 11, June 2010) under the Michigan Zoning Enabling Act.
“an ordinance to establish zoning districts and regulations in the unincorporated portions of bates township, iron county, michigan”
Land in the unincorporated portions of Bates township, which the ordinance divides into the districts R-1, R-2, L-1/L-2, S-1, R-F, I and C.
“the location of the areas included in each said zoning district are depicted upon the zoning map of bates township, iron county, state of michigan and are available for public inspection in the townsh”
Dwellings in the suburban residential and restricted commercial district (R-1) inside Bates township's unincorporated portions
minimum lot area (dwellings): >= 22500 sq ft (Schedule 9.01a; the extracted table row also reads 'sq. ft.' for non-dwellings, which may repeat this area)
“suburban residential and restricted dwellings 25 feet 25 feet 25 feet 22,500”
“agricultural rural residential and dwellings 25 feet 25 feet 25 feet 22,500”
Dwellings in the R-1 district inside Bates township: front, side and rear setbacks
front setback (dwelling): >= 25 ft · side yard (dwelling): >= 25 ft · rear yard (dwelling): >= 25 ft
“suburban residential and restricted dwellings 25 feet 25 feet 25 feet 22,500”
“agricultural rural residential and dwellings 25 feet 25 feet 25 feet 22,500”
Lots in the R-1 district inside Bates township: combined area of all structures
maximum combined structure coverage: <= 50 percent (of lot, per Schedule 9.01a note)
“the combined total area of all above structures in each listed classification shall not exceed fifty percent (50%) of lot coverage”
“the combined total area of all above structures in each listed classification shall not exceed fifty percent (50%) of lot coverage”
Buildings in the industry (I) district inside Bates township only
maximum building height: <= 40 ft
“height: no building or structure shall exceed a maximum of 40 feet in height”
A trailer coach used as a dwelling while the owner builds a home on the same premises inside Bates township
maximum occupancy period: <= 12 months (from date of issuance of certificate of compliance for construction)
“a property owner in any district may be permitted to erect or move not more than one trailer coach upon any premises which qualifies for a dwelling”
“the location and occupancy of trailer coaches and similar portable facilities shall be limited to licensed trailer courts and camping grounds, except that such facilities may be utilized for seasonal dwelling purposes without such limitations when located in district r-f (6.01), l-2 (5.01) and s-1 (5.01)”
Camping and temporary trailer or tent occupancy on private land inside Bates township
“the location and occupancy of trailer coaches and similar portable facilities shall be limited to licensed trailer courts and camping grounds”
Mobile home occupancy in the agricultural rural residential (R-2) district inside Bates township
“4.02a primary uses (without special approval): 1. any use allowed in the r1 district 2. mobile homes”
A second dwelling or dwelling-purpose structure accessory to a home inside Bates township's R-2 district
“accessory buildings, structures and uses customarily incidental to any permitted use or approved use, but not including any building or structure for dwelling purposes.”
Non-connected buildings inside Bates township, sanitation other than a septic system
“except that an outside privy may be erected and maintained in accordance with such health district standards in recreation and forestry district, r-f”
A new home inside Bates township: whether it must connect to township water or sewer depends on whether the lot is served; the zoning ordinance accepts a septic and well system only where the building is not connected
“unless connected with the sanitary and/or water supply facilities, every building or structure hereafter erected on any premises”
Dwellings on lands subject to flooding or high groundwater, in the river (S-1) and L-2 lake and river areas inside Bates township
minimum separation to high groundwater: >= 6 ft (between finished grade and high ground water table)
“no dwelling may be constructed on lands which are subject to flooding or on land with less than 6 feet between the finished grade level of the ground surface and the high ground water table.”
Zoning certificate of approval before erecting, moving or using a building or premises inside Bates township
zoning permit validity: 12 months
“all zoning permits shall be issued for a 12-month period. permits may be renewed after 12 months at the discretion of the zoning administrator. upon reapplication, the renewal cost shall be one-half the original fee”
Bates Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Building permits for new construction inside Bates township, issued through the Iron County construction code office because the township does not enforce building codes itself
permit fee: determined by building inspector (Fee amount not stated on the instruction sheet)
“when coming to the construction code office to secure a building permit jt is required that you have a copy from all sources of the following information”
Septic systems for buildings inside Bates township are governed by the Dickinson-Iron health district standards, not by a township septic ordinance
“a system of waste disposal maintained in accordance with the standards of material and installation recommended by the dickinson-iron health district”
Septic tank permit for a new home on a lot inside Bates township, issued by the Dickinson-Iron health department
“septic tank and water well permits from the dickinson-iron health department.”
Water well for a new home inside Bates township, permitted by the Dickinson-Iron health department
“septic tank and water well permits from the dickinson-iron health department.”
We looked and could not find an official answer yet. Silence is not permission; ask Bates Township or Iron County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Bates Township publishes no rule on the point, not that none exists. Iron County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Bates Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.