Orange Township is a township in Ionia County, Michigan. 11 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Ionia County page.
Excavation, construction, parking areas, and structural alterations regulated by the Orange Township Zoning Ordinance.
“It shall be unlawful for any person to commence excavation for, or construction of, any building or structure, parking area or to make structural alterations in any existing building or structure, without first obtaining a Zoning Permit from the Township Zoning Administrator as hereinafter provided except for agricultural buildings.”
Buildings in all Orange Township zoning districts.
maximum building height: <= 35 feet (Subject to listed exceptions.)
“ALL DISTRICTS. No building shall exceed 35 feet.”
A mobile home, motor home, or travel trailer used for living accommodations while a permanent structure is under construction in Orange Township.
temporary occupancy period: 1 year (While a permanent structure is under construction.)
“A temporary shelter such as a mobile home, motor home or travel trailer may be used for one year for living accommodations while a permanent structure is under construction, upon approval of the Ionia County Health Department.”
Agricultural buildings subject to the Orange Township zoning-permit provision.
“It shall be unlawful for any person to commence excavation for, or construction of, any building or structure, parking area or to make structural alterations in any existing building or structure, without first obtaining a Zoning Permit from the Township Zoning Administrator as hereinafter provided except for agricultural buildings.”
Accessory buildings in Orange Township with an area below 200 square feet.
accessory-building area: < 200 square feet (The structure remains subject to accessory-building setback requirements.)
“Accessory buildings less than two hundred (200) square feet in area do not require a zoning permit but shall conform to the setback requirements for accessory buildings.”
Orange Township zoning-permit applications.
“The zoning permit process in outline is: fill out a zoning application form, stake corners of the building(s), call for an inspection and permit appointment and pay the appropriate fees.”
Orange Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction in Orange Township undertaken pursuant to a building permit issued by a Michigan enforcing agency.
“An enforcing agency shall periodically inspect all construction undertaken pursuant to a building permit issued by it”
Single-family and two-family dwelling units in the R-1 Low Density Residential District.
minimum floor area per unit: >= 800 square feet (Single-family and two-family dwelling units.)
“For single family and two family dwelling units, the minimum floor area shall be 800 square feet per unit.”
Principal buildings and structures in the Agricultural District.
minimum lot area: >= 1 acre · minimum lot width at front lot line: >= 150 feet
“LOT AREA - The minimum lot area shall be one acre with a minimum of 150 feet of lot width at the front lot line. The lot area may include road right-of-way if it is noted in the legal description for the lot.”
Residential buildings and normally accessory buildings in the R-1 Low Density Residential District.
front setback: >= 30 feet (Residential buildings and buildings normally considered accessory thereto.)
“FRONT YARD - For residential buildings and buildings normally considered accessory thereto, there shall be a front setback of 30 feet.”
Campgrounds in the Agricultural District of Orange Township.
“The following uses may be permitted as a special land use in the Agricultural District when approval is granted by the Planning Commission. Such uses are subject to the provisions of Chapter 15 contained herein and the provisions noted below where applicable.”
We looked and could not find an official answer yet. Silence is not permission; ask Orange Township or Ionia County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Orange Township publishes no rule on the point, not that none exists. Ionia County’s page lists the county offices to call.