Ingham County, Michigan
Onondaga Township is a township in Ingham County, Michigan. Onondaga Township adopts its own zoning, so inside its limits Onondaga Township’s rules apply, not the county’s. Septic permits inside Onondaga Township come from Ingham County (Ingham County Health Department - Environmental Health Division · (517) 887-4311). 8 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Ingham County page.
Construction inside Onondaga township covered by a township building permit; inspections are carried out by the township building inspector.
not-ready inspection fee: 70 USD (charged when an inspection is requested and the site is not ready)
“a permit, which is also your receipt, should be prominently displayed at the site for the use of the building inspector. all inspections will be strictly enforced. a $70 fee will be charged if you ask for an inspection and you are not ready!”
Land inside Onondaga township limits (Ingham County, Michigan): the township administers its own zoning ordinance through a zoning administrator.
“onondaga township zoning ordinance zoning ordinance zoning map”
Township building permit fees for construction inside Onondaga township
new home building permit fee: 0.4 USD per square foot (as determined by the building inspector; minimum $500) · new home minimum building permit fee: >= 500 USD (applies when the per-square-foot fee is lower) · attached garage (during house construction) permit fee: 250 USD · garage, pole barn, accessory building permit fee: 350 USD · additions/improvements permit fee: 350 USD · decks permit fee: 300 USD · inground swimming pools permit fee: 300 USD · solar permit fee: 300 USD · mobile homes permit fee: 0.3 USD per square foot (as determined by the building inspector; minimum $300)
“charges will be made as follows: new home $.40 per square foot as determined by the building inspector/minimum $500”
Building permit process for construction inside Onondaga township
“procedures to be followed to obtain a building permit”
Onondaga Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
On-site sewage treatment systems for homes inside Onondaga township; the Ingham County Health Department issues the permit.
“apply for and obtain a permit to install water supply well and/or on-site sewage treatment system from the ingham county health department”
Installation of an on-site sewage treatment system on a home lot inside Onondaga township
“apply for and obtain a permit to install water supply well and/or on-site sewage treatment system from the ingham county health department”
Installation of a water supply well on a home lot inside Onondaga township
“apply for and obtain a permit to install water supply well and/or on-site sewage treatment system from the ingham county health department”
Driveway and culvert access onto a road for a home inside Onondaga township; the Ingham County Road Department issues the permit.
“apply for and obtain an approved driveway permit and a culvert permit from ingham county road department”
We looked and could not find an official answer yet. Silence is not permission; ask Onondaga Township or Ingham County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Onondaga Township publishes no rule on the point, not that none exists. Ingham County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Onondaga Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.