Houghton County, Michigan
Portage Township is a charter township in Houghton County, Michigan. Portage Township adopts its own zoning, so inside its limits Portage Township’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Houghton County page.
Land inside the Charter Township of Portage (Houghton County) limits: the township administers its own zoning ordinance
“to provide the full range of residential housing types in a lower-density but urban environment where community sewer and water are available or can be made available.”
Land inside the Charter Township of Portage (Houghton County) limits
“3.8 · r-1 · low density single family residential district purpose.”
R-1 low density single family residential district in Charter Township of Portage
minimum floor area: >= 1400 sq ft
“r-1 12,000 sf ³ 100 ft ³ 30 ft 10 ft 30 ft 1,400 sf 35 ft”
“minimum floor area single/two-family 900 sf per unit; seasonal camps, cabins, tiny houses 500 sf”
R-1 low density single family residential district in Charter Township of Portage (main single-family district)
minimum lot area, served by public water and sewer: >= 12000 sq ft (15,000 sq ft if not served by public water and sewer)
“r-1 12,000 sf ³ 100 ft ³ 30 ft 10 ft 30 ft 1,400 sf 35 ft”
“dimensional standards minimum lot area 1 acre minimum frontage 125 feet minimum yards front 30 ft; side 20 ft; rear 30 ft minimum floor area single/two-family 900 sf per unit; seasonal camps, cabins, tiny houses 500 sf maximum height 35 feet”
R-1 low density single family residential district in Charter Township of Portage
front yard: 30 ft · side yard: 10 ft · rear yard: 30 ft
“r-1 12,000 sf ³ 100 ft ³ 30 ft 10 ft 30 ft 1,400 sf 35 ft”
“dimensional standards minimum lot area 1 acre minimum frontage 125 feet minimum yards front 30 ft; side 20 ft; rear 30 ft minimum floor area single/two-family 900 sf per unit; seasonal camps, cabins, tiny houses 500 sf maximum height 35 feet”
R-1 low density single family residential district in Charter Township of Portage
maximum height: <= 35 ft
“r-1 12,000 sf ³ 100 ft ³ 30 ft 10 ft 30 ft 1,400 sf 35 ft”
“dimensional standards minimum lot area 1 acre minimum frontage 125 feet minimum yards front 30 ft; side 20 ft; rear 30 ft minimum floor area single/two-family 900 sf per unit; seasonal camps, cabins, tiny houses 500 sf maximum height 35 feet”
Tiny houses inside Charter Township of Portage, as listed in the RUR district dimensional standards
minimum floor area, tiny house: >= 500 sq ft
“special land uses (section 10) ● accessory dwelling unit / echo housing ● tiny house / undersized dwelling unit”
Accessory dwelling units / echo housing inside Charter Township of Portage
“special land uses (section 10) ● accessory dwelling unit / echo housing”
Portage Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Building, electrical, mechanical and plumbing work inside Charter Township of Portage, issued by the Houghton County Building Department for the entire county
“the houghton county building department issues all building, electrical, mechanical, and plumbing permits for the entire county. the issuance of the 911 address numbers are also performed by this office. a permit application must be filed and permit issued prior to any work being done. if not, projects will be subject to a 50% fee.”
Building permit fees for work inside Charter Township of Portage (county building department schedule)
“building permit requirements basement wall specifications crawl space specifications electrical permit emergency escape and rescue openings fee schedule garage specifications/cross view”
Building permit process for work inside Charter Township of Portage
“a permit application must be filed and permit issued prior to any work being done. if not, projects will be subject to a 50% fee.”
We looked and could not find an official answer yet. Silence is not permission; ask Portage Township or Houghton County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Portage Township publishes no rule on the point, not that none exists. Houghton County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Portage Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.